(中级) 系统集成项目管理工程师
职业资格 · 共 1397 道题
题目列表
- 单选题The key benefit of( )is that it provides guidance and direction on how the project costs will be managed throughout the project.
- 单选题Integration ( ) is the process of verifying that the components of a system work together as described in the program design and system design specifications.
- 单选题A schedule is commonly used in project planning and project portfolio management.( ) on a schedule may be closely related to the work breakdown structure (WBS)terminal elements, the statement of work, or a contract data requirements list.
- 单选题( ) are thefour major activities of software configuration management. ① configuration identification ② statement report ③ change control ④ preparation of requirement document ⑤ configuration auditing
- 单选题Those items are often estimated in terms of resource ( ) , budget and duration.Linked by dependencies and scheduled events.
- 单选题Cloud computing is a type of Internet-based computing that provides shared computer processingresources and data to computers and other devices on demand. Advocates claimthat cloud computing allows companies to avoid up-front infrastructure costs.Cloud computing now has few service form, but it is not including ().
- 单选题The most expensive phase of life cycle costing is ( ) .
- 单选题The inputs of developing project management plan do not include().
- 单选题( )is a project management technique for measuring projectPerformance progress.It has the ability to combine measurements of the project management triangle: scope,time and costs.
- 单选题Most of the host operating system provides a way for a system administrator to manually configure the IP information needed by a host.Automated configuration methods, such as ( ) , are required to solve the problem.
- 单选题The work breakdown structure comprises several levels of decomposition of the total project.The lowest level of definition is always the ( ) .
- 单选题For anyinformation system to serve its purpose ,the ihformation must be( )when it ìs needed.
- 单选题In project management, a ( ) is a listing of a project’s milestones ,activities, and deliverables, usually with intended start and finish dates。
- 单选题Project manager believes that modifying the project scope may provide added value for the customer. The project manager should ( ) . A.change the scope baseline
- 单选题Schedule development can require the review and revision of duration estimates and resource estimates to create an approved(74)that can serve as a baseline to track progress.
- 单选题A project management technique that is currently in widespread use is the ( ) . The purpose of this technique is to detail, in hierarchical fashion, all of the activities that are required to meet project objectives.
- 单选题The work breakdown structure (WBS) has been widely used in management for software development project, ( ) is generally NOT validated through the WBS.
- 单选题( ) : The capability provided to the consumer is to use the provide's applications running on a c1oud infrastructure.The applications are accessible from various client devices through either a thin client interface, such as a web browser (e.g.,web-based E-mai1),or a program interface.
- 单选题()represents the informationassets characterized by such a High volume, Velocity and Variety to requirespecific Technology and Analytical Methods for its transformation into Value. A.Internet plus
- 单选题A project manager believes that modifying the scope of the project may provide added value service for the customer. The project manager should ( )
- 单选题A milestone is a significant ( ) in a project.
- 单选题The project life-cycle can be described as().
- 单选题The Systems Development Life Cycle (SDL C) is a process of creating or altering information systems, and the models and methodologies that people use to develop these systems. Sequential SDLC models, such as ( ) , focus on complete and correct planning to guide large projects and risks to successful and predictable results. A.Waterfall
- 单选题A project life cycle is a collection of generally sequential project ()whose name and number are determined by the control needs of the organization or organizations involved in the project. The life cycle provides the basic for managing the project, regardless of the specific work involved.
- 单选题Circuit-switching technology is used in Public Switched Telephone Network(PSTN), Global System for Mobile Communications(GSM) and Code Division Multiple Access(CDM A). It is a ( ) information transfer mode.
- 单选题( ) is primarily concerned with defining and controlling what is and is not included in the project.
- 单选题The life cycle of a project is a description of the various phases of the project from the beginning to the end. One of the followings is not a phase of the traditional project life cycle, It is()
- 单选题Project manager believes that modifying the project scop may provide added value for the customer.The project manager should( ) A.change the scope baseline
- 单选题Information is no good to you if you can't ( ) it.The location dimension of information means having access to access to information no where you are.
- 单选题All of followings should be done by the project manager during project control except (). A.Determine the a change has occurred
- 单选题Which of following is an important input to scope verification? ()
- 单选题()describees,indetail,the project's deliverables and the work required to create those deliverables.
- 单选题Cloud computing is a style of computing in which dynamically scalabled often ( ) resources are provided as a service over the internet
- 单选题OSI is a theoretical model that shows how any two different systems can communicate with each other. Router, as a networking device operate at the()layer of the OSI model
- 单选题The inputs of developing project management plan do not include()
- 单选题Perform Quality Control is the process of monitoring and recording results*of executing the Quality Plan activities to assess performance and recommend necessary changes.() are the techniques and tools in performing quality control① Statistical sampling ② Run chart③ Control charts ④ Critical Path Method⑤ Pareto chart⑥ Cause and effect diagrams
- 单选题()is the application of planned,systematic quality activities to ensure thatthe project will employ all processes needed to meet requirements. A.Quality assurance(Q A)
- 单选题()seeks to build confidence that a future output or an unfinished output, will be completed in a manner that meets the specified requirements and expectations.
- 单选题Plan Quality is the process of identifying quality requirements and standards for the project and product, and documenting how the project will demonstrate compliance.( ) is a method that analyze all the costs incurred over the life of the product by investment in preventing nonconformance to requirements, appraising the product or service for conformance to requirement, and failing to meet requirements.
- 单选题The ( ) refers to the integration of complex physical machinery with networked sensors and software. It draws together fields such as machine learning, big data, the Internet of things and machine-to-machine communication to ingest data form machines, analyze it (often in real-time), and use it to adjust operations.
- 单选题Projects are a mean of achieving organizational ().
- 单选题The work that needs to be accomplished to deliver a product,service,or result with the specified features and functions is called ( ) . A.Scope management
- 单选题Ethernet is the commonly used local area network communication protocol. The standard of Ethernet is ( ) .
- 单选题Which of the following scheduling methods uses more of the risk management concepts( ) .
- 单选题TCP/IP communication protocol contains four layers. From bottom to top, the four layers are ( ) .
- 单选题A project life cycle is a collection of generally sequential project whose name and number are determined by the control needs of the organization or organizations involved in the project. The life cycle provides the basic () for managing the project, regardless of the specific work involved.
- 单选题在项目实施过程中, ( )容易增加冲突发生的概率。
- 单选题在软件生命周期中,能准确地确定软件系统必须做什么和必须具备哪些功能的阶段是()
- 单选题监理活动的主要内容可以概括为“四控、三管、一协调”。其中四控包含( ) 。 ①质量控制②风险控制③投资控制 ④进度控制⑤范围控制⑥变更控制
- 单选题基于V模型来设定软件开发项目计划,项目组应该在概要设计阶段制定软件的( )计划