多选题来自题库:质量、投资、进度控制A.F=A(P/ A,i,6)(F/P,i,8) B.F=A(P/ A,i,5)(F/P,i,7) C.F=A(F/Ai,6)(F/P,i,2)BF=A(F/Ci,5)(F/P,i,2)DF=A(F/Ei,6)(F/P,i,l)参考答案AC