[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-92-8":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":561},{"id":5,"name":6,"category":7,"favorite":8},92,"(中级)公司信贷","经济金融",0,8,50,2878,[13,34,46,64,74,86,98,110,122,134,146,158,170,176,182,188,194,200,206,212,218,224,230,242,254,266,278,290,298,310,322,334,346,358,370,382,394,406,418,430,442,454,466,478,490,502,514,525,537,549],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},219476,1,"单选题","某电力生产企业2013年末资产负债表主要科目情况如下： 表6—2资产负债表 单位：元 从其资产负债表分析，该电力生产企业最有可能存在的问题是（ ）。[2015年5月真题]",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","营运资金不合理，长期借款过多",false,{"key":24,"text":25,"correct":26},"B","资产结构不合理，长期资产比重过高",true,{"key":28,"text":29,"correct":22},"C","资金结构不合理，资金使用和筹措期限错配",{"key":31,"text":32,"correct":22},"D","资产负债结构不合理，所有者权益不足","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},219477,"为应对经营风险，企业应（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"使流动资产在整个资金来源中占有足够比重，至少能应付资产变现需求",{"key":24,"text":41,"correct":22},"使应收账款在整个资产中只占很小比重，最多仅限于所有者权益数额",{"key":28,"text":43,"correct":26},"使自有资金在整个资金来源中占有足够比重，至少能弥补资产变现时的损失",{"key":31,"text":45,"correct":22},"使长期资产在整个资金来源中占有足够比重，至少能弥补资产变现时的损失",{"id":47,"libraryId":5,"type":48,"typeLabel":49,"stem":50,"options":51,"answer":63,"analysis":33},219479,2,"多选题","关于偿还能力，下列说法正确的有（ ）。[2016年6月真题]",[52,54,56,58,60],{"key":20,"text":53,"correct":26},"企业营运资金为正，说明其是用长期资金支持部分流动资产",{"key":24,"text":55,"correct":26},"企业营运能力越强，说明其资产利用效率越高，银行信贷资金沉淀为无效资产就越少",{"key":28,"text":57,"correct":22},"企业营运能力越强，资产周转速度越快，取得收入和利润越多，可用于偿还短期债务的能力越强",{"key":31,"text":59,"correct":26},"企业营运能力越强，说明其资产变现速度越快，可用于偿付流动负债的能力越强",{"key":61,"text":62,"correct":22},"E","企业营运资金为正，说明其是用流动负债支持部分长期资产","ABD",{"id":65,"libraryId":5,"type":66,"typeLabel":67,"stem":68,"options":69,"answer":73,"analysis":33},219482,3,"判断题","投资利润率=年利税总额或平均利税总额／项目总投资×100％。（ ）[2016年6月真题]",[70,72],{"key":20,"text":71,"correct":22},"正确",{"key":24,"text":73,"correct":26},"错误",{"id":75,"libraryId":5,"type":15,"typeLabel":16,"stem":76,"options":77,"answer":24,"analysis":33},219484,"围绕项目的组织机构设置，对组织机构所作出的企业组织是否合理和有效进行的综合分析评价称为（ ）。",[78,80,82,84],{"key":20,"text":79,"correct":22},"组织机构评估",{"key":24,"text":81,"correct":26},"组织和管理评估",{"key":28,"text":83,"correct":22},"项目生产条件评估",{"key":31,"text":85,"correct":22},"人力资源评估",{"id":87,"libraryId":5,"type":15,"typeLabel":16,"stem":88,"options":89,"answer":20,"analysis":33},219486,"企业外购一项固定资产，购买价格100万元，支付的运输费5万元，保险费3万元，发生的安装成本2万元，并缴纳税金5万元。则该固定资产的入账原值为（ ）。『2010年5月真题]",[90,92,94,96],{"key":20,"text":91,"correct":26},"115万元",{"key":24,"text":93,"correct":22},"110万元",{"key":28,"text":95,"correct":22},"108万元",{"key":31,"text":97,"correct":22},"100万元",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":31,"analysis":33},219488,"某企业2002年12月30日购人一台不需安装的设备，已交付生产使用，原价50000元，预计使用5年，预计净残值2000元，若按年数总和法计提折旧，则第三年的折旧额为（ ）。[2010年5月真题]",[102,104,106,108],{"key":20,"text":103,"correct":22},"9600元",{"key":24,"text":105,"correct":22},"10000元",{"key":28,"text":107,"correct":22},"12800元",{"key":31,"text":109,"correct":26},"6400元",{"id":111,"libraryId":5,"type":15,"typeLabel":16,"stem":112,"options":113,"answer":20,"analysis":33},219491,"在项目财务分析的财务预测审查中，下列税金中，不应从销售收入中扣除的是（ ）。[2014年6月真题]",[114,116,118,120],{"key":20,"text":115,"correct":26},"企业所得税",{"key":24,"text":117,"correct":22},"资源税",{"key":28,"text":119,"correct":22},"营业税",{"key":31,"text":121,"correct":22},"城市维护建设税",{"id":123,"libraryId":5,"type":15,"typeLabel":16,"stem":124,"options":125,"answer":31,"analysis":33},219493,"某项目的净现金流量如下表(单位为万元)。贴现率为15％，则其财务净现值是（ ） 万元(精确到个位)。 已知折现率为15％的第一至第三年的折现系数分别为0．87，0．756，0．658。[2014年6月真题]",[126,128,130,132],{"key":20,"text":127,"correct":22},"130",{"key":24,"text":129,"correct":22},"71",{"key":28,"text":131,"correct":22},"81",{"key":31,"text":133,"correct":26},"61",{"id":135,"libraryId":5,"type":15,"typeLabel":16,"stem":136,"options":137,"answer":28,"analysis":33},219495,"在贷款项目环境条件分析中，银行对项目环境保护的治理方案进行审查的内容不包括（ ）。[2014年11月真题]",[138,140,142,144],{"key":20,"text":139,"correct":22},"对投入物、燃料和原材料的使用是否安排了处理措施，是否采取了治理措施",{"key":24,"text":141,"correct":22},"经治理的各种污染物的排放量是否低于国家环境部门规定的标准",{"key":28,"text":143,"correct":26},"在总投资中是否包括了环保工程的相关投资，是否单独列项，来源有无保证",{"key":31,"text":145,"correct":22},"设计任务书中的治理技术是否合理可靠",{"id":147,"libraryId":5,"type":15,"typeLabel":16,"stem":148,"options":149,"answer":20,"analysis":33},219499,"在项目评估的现金流量分析中，全部投资现金流量表以全部投资作为计算的基础，__________不作为现金流人，__________和__________不作为现金流出。（ ）[2014年11月真题]",[150,152,154,156],{"key":20,"text":151,"correct":26},"借款；借款利息；本金的偿还",{"key":24,"text":153,"correct":22},"本金的偿还；借款利息；借款",{"key":28,"text":155,"correct":22},"资产；借款利息；本金的偿还",{"key":31,"text":157,"correct":22},"借款利息；借款；本金的偿还",{"id":159,"libraryId":5,"type":15,"typeLabel":16,"stem":160,"options":161,"answer":24,"analysis":33},219502,"甲企业某产品年生产能力200万吨，每吨售价515元，年固定成本为20万元，单位产品可变成本为2元，每吨销售税金为1元。那么，该企业盈亏平衡点销售收入为（ ）万元。[2015年5月真题]",[162,164,166,168],{"key":20,"text":163,"correct":22},"30",{"key":24,"text":165,"correct":26},"20",{"key":28,"text":167,"correct":22},"10",{"key":31,"text":169,"correct":22},"50",{"id":171,"libraryId":5,"type":66,"typeLabel":67,"stem":172,"options":173,"answer":73,"analysis":33},219506,"全部投资现金流量表、自有资金现金流量表可从正面直接回答项目今后偿还银行贷款的能力。( )",[174,175],{"key":20,"text":71,"correct":22},{"key":24,"text":73,"correct":26},{"id":177,"libraryId":5,"type":66,"typeLabel":67,"stem":178,"options":179,"answer":73,"analysis":33},219508,"评估项目的还款来源时，必须先考虑将项目本身的税后利润全部用于还贷。( )",[180,181],{"key":20,"text":71,"correct":22},{"key":24,"text":73,"correct":26},{"id":183,"libraryId":5,"type":66,"typeLabel":67,"stem":184,"options":185,"answer":71,"analysis":33},219511,"在计算现金流量时，折IH费支出、无形资产与递延资产摊销不能作为现金流出。( )",[186,187],{"key":20,"text":71,"correct":26},{"key":24,"text":73,"correct":22},{"id":189,"libraryId":5,"type":66,"typeLabel":67,"stem":190,"options":191,"answer":73,"analysis":33},219513,"无形资产与递延资产根据其原值采用加速递减法分期摊销。( )",[192,193],{"key":20,"text":71,"correct":22},{"key":24,"text":73,"correct":26},{"id":195,"libraryId":5,"type":66,"typeLabel":67,"stem":196,"options":197,"answer":71,"analysis":33},219516,"净现值率主要用于投资额不等的项目之间的比较，净现值率越大，表明项目单位投资能获得的净现值就越大，项目的效益就越好。( )",[198,199],{"key":20,"text":71,"correct":26},{"key":24,"text":73,"correct":22},{"id":201,"libraryId":5,"type":66,"typeLabel":67,"stem":202,"options":203,"answer":73,"analysis":33},219518,"根据《项目融资业务指引》的规定，贷款人从事项目融资业务，应当以盈利能力分析为核心，重点从项目技术可行性、财务可行性和还款来源可靠性等方面评估项目风险，审慎预测项目的未来收益和现金流。( )",[204,205],{"key":20,"text":71,"correct":22},{"key":24,"text":73,"correct":26},{"id":207,"libraryId":5,"type":66,"typeLabel":67,"stem":208,"options":209,"answer":71,"analysis":33},219520,"流动比率并非越高越好。流动比率越高，说明流动资产相对于流动负债太多，可能是存货积压，也可能是持有现金太多，或者两者兼而有之。( )",[210,211],{"key":20,"text":71,"correct":26},{"key":24,"text":73,"correct":22},{"id":213,"libraryId":5,"type":66,"typeLabel":67,"stem":214,"options":215,"answer":73,"analysis":33},219522,"投资回收期、净现值、净现值率、内部收益率四项指标的计算都必须使用资产负债表。( )",[216,217],{"key":20,"text":71,"correct":22},{"key":24,"text":73,"correct":26},{"id":219,"libraryId":5,"type":66,"typeLabel":67,"stem":220,"options":221,"answer":71,"analysis":33},219524,"由于同一项目不同的现金流量分布可能得出相同的内部收益率，因此不能简单以内部收益率来判断项目能否按时还款，但可以借助净现金流量分析，把各年还本付息额跟当年的净现金流量进行对比，就可以判断项目在还款期内能否按时还款。( )",[222,223],{"key":20,"text":71,"correct":26},{"key":24,"text":73,"correct":22},{"id":225,"libraryId":5,"type":66,"typeLabel":67,"stem":226,"options":227,"answer":73,"analysis":33},219526,"财务净现值小于零，表明项目的获利能力超过基准收益率或设定收益率。一般来说，该项目可以接受。( )",[228,229],{"key":20,"text":71,"correct":22},{"key":24,"text":73,"correct":26},{"id":231,"libraryId":5,"type":15,"typeLabel":16,"stem":232,"options":233,"answer":24,"analysis":33},219528,"项目投产初期，要根据( )估算各年达产率。",[234,236,238,240],{"key":20,"text":235,"correct":22},"项目销售收入",{"key":24,"text":237,"correct":26},"项目实际产量",{"key":28,"text":239,"correct":22},"设计生产能力",{"key":31,"text":241,"correct":22},"市场产量水平",{"id":243,"libraryId":5,"type":15,"typeLabel":16,"stem":244,"options":245,"answer":28,"analysis":33},219531,"无形资产的原值( )。",[246,248,250,252],{"key":20,"text":247,"correct":22},"按资产评估确认",{"key":24,"text":249,"correct":22},"按实际发生值计算",{"key":28,"text":251,"correct":26},"按固定资产确定方法确认",{"key":31,"text":253,"correct":22},"按市场价确认",{"id":255,"libraryId":5,"type":15,"typeLabel":16,"stem":256,"options":257,"answer":31,"analysis":33},219533,"关于固定资产原值的确定，下列说法正确的是( )。",[258,260,262,264],{"key":20,"text":259,"correct":22},"购入固定资产按合同协议确定的价值入账",{"key":24,"text":261,"correct":22},"融资租入的固定资产按缴纳各期租金的现值入账",{"key":28,"text":263,"correct":22},"构建固定资产缴纳的投资方向调节税、耕地占用税不计入固定资产原值",{"key":31,"text":265,"correct":26},"与构建固定资产有关的建设期支付的贷款利息和发生的汇兑损失应计人相应的固定资产原值",{"id":267,"libraryId":5,"type":15,"typeLabel":16,"stem":268,"options":269,"answer":31,"analysis":33},219536,"流动资金分年使用计划应根据( )来安排。",[270,272,274,276],{"key":20,"text":271,"correct":22},"建设进度",{"key":24,"text":273,"correct":22},"资金来源渠道",{"key":28,"text":275,"correct":22},"资金到位情况",{"key":31,"text":277,"correct":26},"项目的达产率",{"id":279,"libraryId":5,"type":15,"typeLabel":16,"stem":280,"options":281,"answer":31,"analysis":33},219538,"将各个生产环节的流动资金相加得到项目总流动资金需用额，再减去流动负债得到项目所需流动资金的方法为( )。",[282,284,286,288],{"key":20,"text":283,"correct":22},"比例系数法",{"key":24,"text":285,"correct":22},"资产负债表法",{"key":28,"text":287,"correct":22},"趋势分析法",{"key":31,"text":289,"correct":26},"分项详细估算法",{"id":291,"libraryId":5,"type":15,"typeLabel":16,"stem":292,"options":293,"answer":20,"analysis":33},219541,"按照年经营成本或年销售收入的一定比例计算流动资金需用量的方法为( )。",[294,295,296,297],{"key":20,"text":283,"correct":26},{"key":24,"text":285,"correct":22},{"key":28,"text":287,"correct":22},{"key":31,"text":289,"correct":22},{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":24,"analysis":33},219543,"项目建设期间发生的工程费用、工程其他费用及预备费属于( )。",[302,304,306,308],{"key":20,"text":303,"correct":22},"固定投资",{"key":24,"text":305,"correct":26},"建设投资",{"key":28,"text":307,"correct":22},"建筑工程费用",{"key":31,"text":309,"correct":22},"流动资产投资",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":28,"analysis":33},219546,"下列关于项目协作机构分析的说法，错误的是( )。",[314,316,318,320],{"key":20,"text":315,"correct":22},"与项目有关的协作机构主要包含国家计划部门和主管部门、地方政府机构、业务往来单位三个层次",{"key":24,"text":317,"correct":22},"分析与项目有关的国家机构时，应着重对国家机构制定有关政策的能力及政策的正确与否、各部门机构在政策上的协调性进行分析",{"key":28,"text":319,"correct":26},"应根据需要设置和调整地方机构，加强对项目的基层管理",{"key":31,"text":321,"correct":22},"应考察与项目有关的协作单位机构是否健全，规章制度是否完整以及工作能力如何",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":24,"analysis":33},219548,"下列关于项目经营机构分析的说法，错误的是( )。",[326,328,330,332],{"key":20,"text":327,"correct":22},"项目经营机构的规模应取决于项目的年产量或提供服务的能力及范围",{"key":24,"text":329,"correct":26},"应依照项目的经营程序，审查项目经营机构的设置是否精简高效",{"key":28,"text":331,"correct":22},"应审查项目经营机构的设置能否满足项目的要求",{"key":31,"text":333,"correct":22},"项目经营机构应具有根据市场变化而不断改变经营方针、内容和方式的能力",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":20,"analysis":33},219551,"负责项目方案的准备、挑选、报请上级机关审批，以及项目的建设过程(包括设计、施工、设备购置安装等)的机构为项目的( )。",[338,340,342,344],{"key":20,"text":339,"correct":26},"实施机构",{"key":24,"text":341,"correct":22},"经营机构",{"key":28,"text":343,"correct":22},"协作机构",{"key":31,"text":345,"correct":22},"宣传机构",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":24,"analysis":33},219553,"下列关于项目建设条件的说法，正确的是( )。",[350,352,354,356],{"key":20,"text":351,"correct":22},"主要包括企业自身内部条件和主客观外部条件",{"key":24,"text":353,"correct":26},"内部条件是指拟建项目的人力、物力、财务资源条件",{"key":28,"text":355,"correct":22},"外部条件是指拟建工程所需的原材料、建筑施工条件",{"key":31,"text":357,"correct":22},"人力资源是指项目建设所需管理人员的来源",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":20,"analysis":33},219556,"下列关于项目环境条件的说法，错误的是( )。",[362,364,366,368],{"key":20,"text":363,"correct":26},"仅是对项目生产的自然环境条件、交通运输条件等方面进行分析",{"key":24,"text":365,"correct":22},"主要包括项目的建设条件与生产条件",{"key":28,"text":367,"correct":22},"既有可控制的静态的稳定条件，又有动态的不确定性条件",{"key":31,"text":369,"correct":22},"银行对其分析时要重点关注不确定因素及相关项目的分析",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":24,"analysis":33},219558,"设备的技术寿命是指设备从开始使用至( )所经历的时间。",[374,376,378,380],{"key":20,"text":375,"correct":22},"设备因物理、化学作用报废",{"key":24,"text":377,"correct":26},"设备因技术落后而被淘汰",{"key":28,"text":379,"correct":22},"设备使用费超过预算",{"key":31,"text":381,"correct":22},"设备完全折旧",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":20,"analysis":33},219561,"下列关于工艺技术方案评估的说法，错误的是( )。",[386,388,390,392],{"key":20,"text":387,"correct":26},"目的是分析工艺的先进性",{"key":24,"text":389,"correct":22},"要熟悉项目产品国内外现行工业化生产的工艺技术特点及优缺点",{"key":28,"text":391,"correct":22},"要对所收集到资料和数据的完整性、可靠性、准确性进行研究",{"key":31,"text":393,"correct":22},"要了解国内外同类项目技术与装备的发展趋势",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":28,"analysis":33},219564,"如果项目所需设备需要进口，除一般因素外，还会受( )限制。",[398,400,402,404],{"key":20,"text":399,"correct":22},"出口国汇率",{"key":24,"text":401,"correct":22},"外汇需求",{"key":28,"text":403,"correct":26},"外汇供给",{"key":31,"text":405,"correct":22},"关税",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":20,"analysis":33},219566,"银行通过分析项目的生产规模，可了解项目是否实现了( )，进而了解项目的经济效益状况，为贷款决策提供依据。",[410,412,414,416],{"key":20,"text":411,"correct":26},"规模经济",{"key":24,"text":413,"correct":22},"市场主导地位",{"key":28,"text":415,"correct":22},"批量化生产",{"key":31,"text":417,"correct":22},"垄断优势",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":24,"analysis":33},219569,"1986年，美国著名市场营销学家菲利浦·科特勒教授在原4P组合的基础上提出了6P营销策略，增加的两个P为( )。",[422,424,426,428],{"key":20,"text":423,"correct":22},"权力(Power)、渠道(PlaCe)",{"key":24,"text":425,"correct":26},"权力(Power)、公共关系(PubliC Relations)",{"key":28,"text":427,"correct":22},"促销(Promotion)、权力(Power)",{"key":31,"text":429,"correct":22},"渠道(PlaCe)、公共关系(PubliC Relations)",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":31,"analysis":33},219571,"某家电行业每年平均有3亿人购买家电，每人每年平均购买1．5台，平均每台的价格为2000元，则该家电的总市场潜量为( )。",[434,436,438,440],{"key":20,"text":435,"correct":22},"3亿人",{"key":24,"text":437,"correct":22},"4．5亿台",{"key":28,"text":439,"correct":22},"6000亿元",{"key":31,"text":441,"correct":26},"9000亿元",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":24,"analysis":33},219574,"行业按照对经济周期变迁的应变程度可分为三类，不包括( )。",[446,448,450,452],{"key":20,"text":447,"correct":22},"增长型行业",{"key":24,"text":449,"correct":26},"成长型行业",{"key":28,"text":451,"correct":22},"周期型行业",{"key":31,"text":453,"correct":22},"防御型行业",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":31,"analysis":33},219576,"宏观经济分析的主要方法不包括( )。",[458,460,462,464],{"key":20,"text":459,"correct":22},"指标法",{"key":24,"text":461,"correct":22},"概率预测",{"key":28,"text":463,"correct":22},"计量经济模型分析",{"key":31,"text":465,"correct":26},"专家定性分析",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":28,"analysis":33},219578,"市场需求预测分析是对项目投产后( )进行分析和判断。",[470,472,474,476],{"key":20,"text":471,"correct":22},"项目效益",{"key":24,"text":473,"correct":22},"项目适用性",{"key":28,"text":475,"correct":26},"生产产品的销路",{"key":31,"text":477,"correct":22},"生产产品的适用性",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":20,"analysis":33},219582,"借款人分析不包括( )。",[482,484,486,488],{"key":20,"text":483,"correct":26},"临时停产项目借款人分析",{"key":24,"text":485,"correct":22},"新建项目借款人分析",{"key":28,"text":487,"correct":22},"改扩建项目借款人分析",{"key":31,"text":489,"correct":22},"技术改造项目借款人分析",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":31,"analysis":33},219585,"按照国家现行规定，建设项目根据资金性质、环境影响、社会影响等因素的不同，其审批程序可分为( )。",[494,496,498,500],{"key":20,"text":495,"correct":22},"审批制、备案制",{"key":24,"text":497,"correct":22},"审批制、核准制",{"key":28,"text":499,"correct":22},"核准制、备案制",{"key":31,"text":501,"correct":26},"审批制、核准制和备案制",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":28,"analysis":33},219587,"主要从项目发起人和项目本身着手的项目分析属于( )。",[506,508,510,512],{"key":20,"text":507,"correct":22},"项目可行性分析",{"key":24,"text":509,"correct":22},"项目宏观背景分析",{"key":28,"text":511,"correct":26},"项目微观背景分析",{"key":31,"text":513,"correct":22},"项目企业分析",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":24,"analysis":33},219590,"投资者、决策机构和金融机构实施项目、决策项目和提供贷款的主要依据是( )。",[518,520,522,524],{"key":20,"text":519,"correct":22},"项目可行性研究报告",{"key":24,"text":521,"correct":26},"项目评估",{"key":28,"text":523,"correct":22},"项目财务评估",{"key":31,"text":471,"correct":22},{"id":526,"libraryId":5,"type":15,"typeLabel":16,"stem":527,"options":528,"answer":24,"analysis":33},219593,"( )是衡量项目经济效益统一的标准和尺度。",[529,531,533,535],{"key":20,"text":530,"correct":22},"方法规范化原则",{"key":24,"text":532,"correct":26},"指标统一性原则",{"key":28,"text":534,"correct":22},"效益性原则",{"key":31,"text":536,"correct":22},"价值尺度的合理性原则",{"id":538,"libraryId":5,"type":15,"typeLabel":16,"stem":539,"options":540,"answer":31,"analysis":33},219595,"在贯彻效益性原则时，要处理好投资项目的财务效益和国民经济效益的关系。下列说法中错误的是( )。",[541,543,545,547],{"key":20,"text":542,"correct":22},"财务效益和国民经济效益都不好的项目，属于经济上完全不合理的项目",{"key":24,"text":544,"correct":22},"财务效益好，而国民经济效益不好的项目，属于经济上不合理的项目",{"key":28,"text":546,"correct":22},"财务效益差，而国民经济效益好的项目，属于经济上合理的项目",{"key":31,"text":548,"correct":26},"财务效益差，而国民经济效益好的项目，属于经济上不合理的项目",{"id":550,"libraryId":5,"type":15,"typeLabel":16,"stem":551,"options":552,"answer":31,"analysis":33},219598,"下列对项目可行性研究与贷款项目评估区别的理解，错误的是( )。",[553,555,557,559],{"key":20,"text":554,"correct":22},"项目可行性研究一般由项目业主发起，贷款项目评估一般由贷款银行发起",{"key":24,"text":556,"correct":22},"项目评估发生在项目可行性研究之后，比可行性研究更具有权威性",{"key":28,"text":558,"correct":22},"项目可行性研究侧重全面研究，贷款项目评估侧重对所发现或关心问题的研究",{"key":31,"text":560,"correct":26},"项目评估报告主要用于项目报批与贷款申请，项目可行性研究报告主要用于银行贷款决策",[562,565,568,571,574,576],{"id":563,"name":564,"category":7,"favorite":15},109,"发布证券研究报告业务",{"id":566,"name":567,"category":7,"favorite":8},30,"经济师",{"id":569,"name":570,"category":7,"favorite":8},31,"(初级)银行从业资格",{"id":572,"name":573,"category":7,"favorite":8},49,"初级经济师",{"id":10,"name":575,"category":7,"favorite":8},"(初级)保险专业",{"id":577,"name":578,"category":7,"favorite":8},51,"(初级)财政税收"]