[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-92-56":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":673},{"id":5,"name":6,"category":7,"favorite":8},92,"(中级)公司信贷","经济金融",0,56,50,2878,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,273,285,297,309,321,333,345,357,369,380,398,412,426,441,456,471,485,500,514,527,541,556,571,586,600,615,629,644,658],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},222991,1,"单选题","潜在的市场需求量是指在一定时期内，在一定行业营销水平和一定的市场环境下，一个行业中所有企业可能达到的最大（ ）之和。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","营销量",true,{"key":24,"text":25,"correct":26},"B","投资量",false,{"key":28,"text":29,"correct":26},"C","消费量",{"key":31,"text":32,"correct":26},"D","需求量","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},222992,"在行业风险分析当中，波特五力模型与行业风险分析框架均要考虑的因素是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":26},"行业成熟度",{"key":24,"text":41,"correct":26},"成本结构",{"key":28,"text":43,"correct":22},"替代品威胁",{"key":31,"text":45,"correct":26},"买方讨价还价能力",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},222993,"项目生产条件分析主要是指项目建成投产后，对生产经营过程中所需要的物资条件和（ ）条件进行的分析。",[50,52,54,56],{"key":20,"text":51,"correct":26},"销售",{"key":24,"text":53,"correct":26},"生产",{"key":28,"text":55,"correct":26},"经济",{"key":31,"text":57,"correct":22},"供应",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},222994,"（ ）确定了整个国民经济优先发展的产业及技术，对投资项目建设具有重要指导作用。",[62,64,66,68],{"key":20,"text":63,"correct":26},"国民经济平衡发展需要",{"key":24,"text":65,"correct":22},"产业政策、技术政策",{"key":28,"text":67,"correct":26},"市场经济",{"key":31,"text":69,"correct":26},"地区、部门发展规划",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},222995,"假设某年我国人均购买奶制品1公斤，总产能22亿公斤。若人口为13亿，平均每公斤奶制品价格为4元，则我国奶制品市场的总市场潜量为（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":26},"75．5",{"key":24,"text":77,"correct":26},"74．5",{"key":28,"text":79,"correct":26},"92．5",{"key":31,"text":81,"correct":22},"52",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},222996,"工艺技术方案的分析评估是投资项目（ ）的核心，其标准的好坏和高低，对整个项目的设立及执行有决定性影响。",[86,88,90,92],{"key":20,"text":87,"correct":22},"技术可行性分析",{"key":24,"text":89,"correct":26},"产业基础分析",{"key":28,"text":91,"correct":26},"财务可行性分析",{"key":31,"text":93,"correct":26},"效益分析",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},222997,"按照国家现行规定，建设项目根据资金性质、环境影响、社会影响等因素的不同，其审批程序可分为（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"审批制、核准制和备案制",{"key":24,"text":101,"correct":26},"核准制、备案制",{"key":28,"text":103,"correct":26},"审批制、核准制",{"key":31,"text":105,"correct":26},"审批制、备案制",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},222998,"下列选项中，属于项目建设条件分析中外部条件的是（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":26},"拟建项目的物力条件",{"key":24,"text":113,"correct":22},"拟建项目的建筑施工条件",{"key":28,"text":115,"correct":26},"拟建项目的财务资源条件",{"key":31,"text":117,"correct":26},"拟建项目的人力条件",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":31,"analysis":33},222999,"对项目微观背景的分析，下列说法不正确的是（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":26},"分析项目的微观背景主要从项目发起人和项目本身着手",{"key":24,"text":125,"correct":26},"投资的理由主要是指对提出项目的理由及投资意向进行分析评估",{"key":28,"text":127,"correct":26},"投资环境是指在一定时间、一定地点或范围内，影响和制约项目投资活动的各种外部境况和条件要素的有机集合体",{"key":31,"text":129,"correct":22},"项目对其投资环境具有不可选择性，这正是资本寻求其生存和发展的各种必要条件的集中表现",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},223000,"银行在对项目进行技术及工艺流程分析时，做法不正确的是（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"产品技术方案分析无须考虑市场的需求状况",{"key":24,"text":137,"correct":26},"分析工艺技术方案的选择是否与社会发展目标相符合",{"key":28,"text":139,"correct":26},"分析产品的质量标准时，应将选定的标准与国家标准、国际常用标准进行对比",{"key":31,"text":141,"correct":26},"对生产工艺进行评估，首先要熟悉项目产品国内外有关资料，分析各方法的优缺点",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":31,"analysis":33},223001,"下列选项中，不属于项目非财务分析内容的是（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":26},"项目背景分析",{"key":24,"text":149,"correct":26},"项目借款人分析",{"key":28,"text":151,"correct":26},"生产规模分析",{"key":31,"text":153,"correct":22},"项目现金流量分析",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":24,"analysis":33},223002,"下列关于项目经营机构分析的说法，错误的是（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":26},"项目经营机构的规模应取决于项目的年产量或提供服务的能力和范围",{"key":24,"text":161,"correct":22},"应依照项目的经营程序，审查项目经营机构的设置是否精简高效",{"key":28,"text":163,"correct":26},"应审查项目经营机构的设置能否满足项目的要求",{"key":31,"text":165,"correct":26},"项目经营机构应具有根据市场变化而不断改变经营方针、内容和方式的能力",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":31,"analysis":33},223003,"从多个方案的各种因素中评选出主要因素比较理想的方案是指（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":26},"效益成本评比法",{"key":24,"text":173,"correct":26},"盈亏平衡点比较法",{"key":28,"text":175,"correct":26},"净现值比较法",{"key":31,"text":177,"correct":22},"多因素评比法",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":20,"analysis":33},223004,"国家在不同时期对不同行业项目（ ）的规定，是确定项目生产规模的前提。",[182,184,186,188],{"key":20,"text":183,"correct":22},"最小规模",{"key":24,"text":185,"correct":26},"回收期",{"key":28,"text":187,"correct":26},"盈利大小",{"key":31,"text":189,"correct":26},"期限",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":24,"analysis":33},223005,"如果项目所需设备需要进口，除一般因素外，还会受（ ）限制。",[194,196,198,200],{"key":20,"text":195,"correct":26},"关税",{"key":24,"text":197,"correct":22},"外汇供给",{"key":28,"text":199,"correct":26},"外汇需求",{"key":31,"text":201,"correct":26},"出口国汇率",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":24,"analysis":33},223006,"以下关于项目的生产规模分析有误的是（ ）。",[206,208,210,212],{"key":20,"text":207,"correct":26},"国民经济发展规划、战略布局和有关政策是项目规模的主要制约因素之一",{"key":24,"text":209,"correct":22},"行业销售额和企业的市场占有率是项目规模的主要制约因素之一",{"key":28,"text":211,"correct":26},"项目所处行业的技术经济特点是项目规模的主要制约因素之一",{"key":31,"text":213,"correct":26},"资金与基本投入物是项目规模的主要制约因素之一",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":20,"analysis":33},223007,"银行通过分析项目的生产规模，可了解项目是否实现了（ ），进而了解项目的经济效益状况，为贷款决策提供依据。",[218,220,222,224],{"key":20,"text":219,"correct":22},"规模经济",{"key":24,"text":221,"correct":26},"市场主导地位",{"key":28,"text":223,"correct":26},"批量化生产",{"key":31,"text":225,"correct":26},"垄断优势",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":20,"analysis":33},223008,"在项目融资的项目环境条件分析中。相关项目分析最重要的问题是（ ）。",[230,232,234,236],{"key":20,"text":231,"correct":22},"项目建设方案是否同步",{"key":24,"text":233,"correct":26},"相关项目综合效益",{"key":28,"text":235,"correct":26},"相关项目成本",{"key":31,"text":237,"correct":26},"相关项目与主项目关联性",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":24,"analysis":33},223009,"（ ）是指由拟建项目引起的，并与建设、生产、流通、耗费有联系的原材料、燃料、动力运输和环境保护等协作配套项目。",[242,244,246,248],{"key":20,"text":243,"correct":26},"同步建设",{"key":24,"text":245,"correct":22},"相关项目",{"key":28,"text":247,"correct":26},"外部协作配套条件",{"key":31,"text":249,"correct":26},"物力资源",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":24,"analysis":33},223010,"下面哪项的目的是使产品投人市场后能够适销对路，确保项目企业获得预期效益（ ）",[254,256,258,260],{"key":20,"text":255,"correct":26},"工艺技术方案",{"key":24,"text":257,"correct":22},"产品技术方案分析",{"key":28,"text":259,"correct":26},"设备选型",{"key":31,"text":261,"correct":26},"工程设计方案",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":20,"analysis":33},223011,"下列关于银行对项目进行技术及工艺流程分析的说法，不正确的是（ ）。",[266,267,269,271],{"key":20,"text":135,"correct":22},{"key":24,"text":268,"correct":26},"分析产品的质量标准时，应将选定的标准与国家标准进行对比",{"key":28,"text":270,"correct":26},"对生产工艺进行评估，要熟悉项目产品国内外现行工业化生产的工艺方法的有关资料",{"key":31,"text":272,"correct":26},"对项目工艺技术方案进行分析评估的目的是分析产品生产全过程技术方法的可行性",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":31,"analysis":33},223012,"在项目技术分析和评估中，最关键的评估环节是（ ）。",[277,279,281,283],{"key":20,"text":278,"correct":26},"配备一定数量具有一定专业水平的技术专家或技术人员",{"key":24,"text":280,"correct":26},"评估人员深入实际，调查研究项目的技术与设计方案",{"key":28,"text":282,"correct":26},"认真核实各项技术方案指标",{"key":31,"text":284,"correct":22},"搞好方案的定量分析，进行备选方案的综合技术评估",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":24,"analysis":33},223013,"下列关于工艺技术方案评估的说法中，错误的是（ ）。",[289,291,293,295],{"key":20,"text":290,"correct":26},"要对所收集到资料和数据的完整性、可靠性、准确性进行研究",{"key":24,"text":292,"correct":22},"目的是分析工艺的先进性",{"key":28,"text":294,"correct":26},"要熟悉项目产品国内外现行工业化生产工艺的技术特点及优缺点",{"key":31,"text":296,"correct":26},"要了解国内外同类项目技术与装备的发展趋势",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":31,"analysis":33},223014,"银行对项目所选设备的可靠性分析，是指设备在规定时间内和规定条件下，完成规定功能的能力，一般用（ ）来衡量。",[301,303,305,307],{"key":20,"text":302,"correct":26},"使用寿命",{"key":24,"text":304,"correct":26},"经济性",{"key":28,"text":306,"correct":26},"配套性",{"key":31,"text":308,"correct":22},"可靠度",{"id":310,"libraryId":5,"type":15,"typeLabel":16,"stem":311,"options":312,"answer":28,"analysis":33},223015,"银行对贷款项目技术及工艺流程进行分析评估的目的是（ ）。",[313,315,317,319],{"key":20,"text":314,"correct":26},"分析产品方案和市场需求状况",{"key":24,"text":316,"correct":26},"分析所选择的设备具有较高的经济性",{"key":28,"text":318,"correct":22},"分析产品生产全过程技术方法的可行性",{"key":31,"text":320,"correct":26},"分析项目产品的规格、品种、技术性能以及产品的质量",{"id":322,"libraryId":5,"type":15,"typeLabel":16,"stem":323,"options":324,"answer":31,"analysis":33},223016,"设备选择评估的主要内容一般没有（ ）方面。",[325,327,329,331],{"key":20,"text":326,"correct":26},"设备的生产能力和工艺要求",{"key":24,"text":328,"correct":26},"选择的设备具有较高的经济性",{"key":28,"text":330,"correct":26},"设备的配套性",{"key":31,"text":332,"correct":22},"总平面布置方案分析",{"id":334,"libraryId":5,"type":15,"typeLabel":16,"stem":335,"options":336,"answer":20,"analysis":33},223017,"股票价格指数属于宏观经济指标中的（ ）。",[337,339,341,343],{"key":20,"text":338,"correct":22},"先行指标",{"key":24,"text":340,"correct":26},"同步指标",{"key":28,"text":342,"correct":26},"预测指标",{"key":31,"text":344,"correct":26},"滞后指标",{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":28,"analysis":33},223018,"以下关于市场需求预测分析说法错误的是（ ）。",[349,351,353,355],{"key":20,"text":350,"correct":26},"产品特征和消费条件是市场需求预测的主要相关因素之一",{"key":24,"text":352,"correct":26},"社会购买力和产品的价格水平是市场需求预测的主要相关因素之一",{"key":28,"text":354,"correct":22},"市场需求预测的内容包括估计潜在的市场需求总量和估计区域市场潜在需求量两方面",{"key":31,"text":356,"correct":26},"市场需求预测具体来说就是考察项目产品在特定时期内是否有市场以及采取何种营销策略来实现销售目标",{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":20,"analysis":33},223019,"市场需求预测是对需求现状进行分析与评估，对当前市场需求状况进行预测分析，不包括（ ）。",[361,363,365,367],{"key":20,"text":362,"correct":22},"评估市场竞争状况",{"key":24,"text":364,"correct":26},"估计潜在的市场需求量",{"key":28,"text":366,"correct":26},"估计区域市场潜在需求量",{"key":31,"text":368,"correct":26},"估计行业销售额和企业的市场占有率",{"id":370,"libraryId":5,"type":15,"typeLabel":16,"stem":371,"options":372,"answer":28,"analysis":33},223020,"项目融资贷前调查报告中，市场需求预测的内容不包括（ ）。",[373,375,376,378],{"key":20,"text":374,"correct":26},"估计潜在的市场需求总量",{"key":24,"text":366,"correct":26},{"key":28,"text":377,"correct":22},"竞争对手分析",{"key":31,"text":379,"correct":26},"评估行业销售额和企业的市场占有率",{"id":381,"libraryId":5,"type":382,"typeLabel":383,"stem":384,"options":385,"answer":397,"analysis":33},223021,2,"多选题","根据方法与参数的规定，基本财务报表有（ ）。",[386,388,390,392,394],{"key":20,"text":387,"correct":22},"现金流量表",{"key":24,"text":389,"correct":22},"利润表",{"key":28,"text":391,"correct":22},"资金来源与运用表",{"key":31,"text":393,"correct":22},"资产负债表",{"key":395,"text":396,"correct":22},"E","借款还本付息表","ABCDE",{"id":399,"libraryId":5,"type":382,"typeLabel":383,"stem":400,"options":401,"answer":397,"analysis":33},223022,"资金来源与运用表反映项目计算期内各年的资金盈余及短缺情况，可以用于（ ）。",[402,404,406,408,410],{"key":20,"text":403,"correct":22},"选择资金筹措方案",{"key":24,"text":405,"correct":22},"制订适宜的借款计划",{"key":28,"text":407,"correct":22},"制订适宜的还款计划",{"key":31,"text":409,"correct":22},"为编制资产负债表提供依据",{"key":395,"text":411,"correct":22},"帮助银行了解到项目今后的还款资金来源情况",{"id":413,"libraryId":5,"type":382,"typeLabel":383,"stem":414,"options":415,"answer":397,"analysis":33},223023,"财务预测的审查包括（ ）。",[416,418,420,422,424],{"key":20,"text":417,"correct":22},"成本、利润的审查",{"key":24,"text":419,"correct":22},"销售收入审查",{"key":28,"text":421,"correct":22},"税金的审查",{"key":31,"text":423,"correct":22},"项目总投资的审查",{"key":395,"text":425,"correct":22},"无形资产摊销办法的审查",{"id":427,"libraryId":5,"type":382,"typeLabel":383,"stem":428,"options":429,"answer":440,"analysis":33},223024,"建设投资中的工程费用包括（ ）。",[430,432,434,436,438],{"key":20,"text":431,"correct":22},"建筑工程费用",{"key":24,"text":433,"correct":22},"设备购置费用",{"key":28,"text":435,"correct":26},"基本预备费",{"key":31,"text":437,"correct":22},"安装工程费用",{"key":395,"text":439,"correct":26},"涨价预备费","ABD",{"id":442,"libraryId":5,"type":382,"typeLabel":383,"stem":443,"options":444,"answer":455,"analysis":33},223025,"评估中对利润的审查主要针对（ ）。",[445,447,449,451,453],{"key":20,"text":446,"correct":22},"计算利润时的销售收入、销售税金、销售成本在增值税方面的计算口径是否一致",{"key":24,"text":448,"correct":26},"所涉及的税率是否符合现行规定",{"key":28,"text":450,"correct":22},"利润的计算公式是否正确",{"key":31,"text":452,"correct":22},"税后利润的分配顺序是否正确",{"key":395,"text":454,"correct":26},"税后利润的分配项目是否合理","ACD",{"id":457,"libraryId":5,"type":382,"typeLabel":383,"stem":458,"options":459,"answer":470,"analysis":33},223026,"下列项目属于递延资产的是（ ）。",[460,462,464,466,468],{"key":20,"text":461,"correct":26},"土地使用权",{"key":24,"text":463,"correct":26},"专利权",{"key":28,"text":465,"correct":26},"商标权",{"key":31,"text":467,"correct":22},"开办费",{"key":395,"text":469,"correct":22},"以经营租赁租人的固定资产改良支出","DE",{"id":472,"libraryId":5,"type":382,"typeLabel":383,"stem":473,"options":474,"answer":397,"analysis":33},223027,"在对贷款项目进行成本审查时，外购投人物的成本应包括由企业负担的（ ）。",[475,477,479,481,483],{"key":20,"text":476,"correct":22},"运杂费",{"key":24,"text":478,"correct":22},"装卸保险费",{"key":28,"text":480,"correct":22},"途中合理损耗",{"key":31,"text":482,"correct":22},"人库前加工整理费用",{"key":395,"text":484,"correct":22},"入库前的挑选费用",{"id":486,"libraryId":5,"type":382,"typeLabel":383,"stem":487,"options":488,"answer":499,"analysis":33},223028,"对项目成本进行审查时，应（ ）。",[489,491,493,495,497],{"key":20,"text":490,"correct":22},"审查项目是否按企业财务通则与企业会计准则规定核算项目生产经营成本",{"key":24,"text":492,"correct":22},"重点审查原辅料、包装物、燃料动力的单耗、单价取值是否有理、有据",{"key":28,"text":494,"correct":26},"审查外购投人物是否按照实际买价计算成本",{"key":31,"text":496,"correct":22},"审查自制投入物是否按制造过程中发生的实际支出计算成本",{"key":395,"text":498,"correct":22},"审查外购投人物所支付的进项税是否单列","ABDE",{"id":501,"libraryId":5,"type":382,"typeLabel":383,"stem":502,"options":503,"answer":397,"analysis":33},223029,"关于财务净现值，下列说法正确的有（ ）。",[504,506,508,510,512],{"key":20,"text":505,"correct":22},"财务净现值是反映项目在计算期内获利能力的动态评价指标",{"key":24,"text":507,"correct":22},"财务净现值可通过现金流量表中净现金流量的现值求得",{"key":28,"text":509,"correct":22},"财务净现值大于零，表明项目的获利能力超过基准收益率或设定收益率",{"key":31,"text":511,"correct":22},"一个项目的净现值是指项目按照基准收益率或根据项目的实际情况设定的折现率，将各年的净现金流量折现到建设起点的现值之和",{"key":395,"text":513,"correct":22},"一般来说，FNPV>0的项目是可以接受的",{"id":515,"libraryId":5,"type":382,"typeLabel":383,"stem":516,"options":517,"answer":499,"analysis":33},223030,"以下关于项目盈利能力评价指标的描述正确的是（ ）。",[518,520,521,523,525],{"key":20,"text":519,"correct":22},"在求内部报酬率时，计算用的两个相邻折现率之差最好不要超过2％，最大不要超过5％",{"key":24,"text":509,"correct":22},{"key":28,"text":522,"correct":26},"净现值率主要用于投资额相等的项目的比较",{"key":31,"text":524,"correct":22},"净现值率越大，项目单位投资能获得的净现值就越大，项目的效益就越好",{"key":395,"text":526,"correct":22},"项目投资回收期小于或等于基准投资回收期时，表明该项目能在规定的时间内收回投资",{"id":528,"libraryId":5,"type":382,"typeLabel":383,"stem":529,"options":530,"answer":499,"analysis":33},223031,"下列属于项目盈利能力分析指标的有（ ）。",[531,533,535,537,539],{"key":20,"text":532,"correct":22},"财务内部收益率",{"key":24,"text":534,"correct":22},"财务净现值",{"key":28,"text":536,"correct":26},"资产负债率",{"key":31,"text":538,"correct":22},"净现值率",{"key":395,"text":540,"correct":22},"投资回收期",{"id":542,"libraryId":5,"type":382,"typeLabel":383,"stem":543,"options":544,"answer":555,"analysis":33},223032,"关于全部投资现金流量表，下列说法正确的是（ ）。",[545,547,549,551,553],{"key":20,"text":546,"correct":22},"不必考虑项目投资资金的来源及构成",{"key":24,"text":548,"correct":22},"可以使筹资成本和负债水平不同的项目相互比较",{"key":28,"text":550,"correct":22},"所计算的投资收益率便于同市场利率和行业平均盈利率相比较",{"key":31,"text":552,"correct":22},"不必考虑还本付息的问题",{"key":395,"text":554,"correct":26},"可用于计算自有资金的内部收益率、净现值等指标","ABCD",{"id":557,"libraryId":5,"type":382,"typeLabel":383,"stem":558,"options":559,"answer":570,"analysis":33},223033,"目前财政部规定的快速折旧法有（ ）。",[560,562,564,566,568],{"key":20,"text":561,"correct":26},"平均年限法",{"key":24,"text":563,"correct":22},"年数总和法",{"key":28,"text":565,"correct":26},"工作量法",{"key":31,"text":567,"correct":26},"直线折旧法",{"key":395,"text":569,"correct":22},"双倍余额递减法","BE",{"id":572,"libraryId":5,"type":382,"typeLabel":383,"stem":573,"options":574,"answer":585,"analysis":33},223034,"进行项目财务评估时，下列关于企业产品成本和销售收入会计核算的说法，正确的有（ ）。",[575,577,579,581,583],{"key":20,"text":576,"correct":26},"在购货阶段，购入货物所支付的价款和增值税共同计入购入货物的成本",{"key":24,"text":578,"correct":22},"在购货阶段，购入货物的增值税部分计入进项税额",{"key":28,"text":580,"correct":26},"在销售阶段，销售价格中应含增值税",{"key":31,"text":582,"correct":22},"在销售阶段，如果定价时含增值税，则应还原为不含税价格计算企业的销售收入",{"key":395,"text":584,"correct":22},"在销售阶段，企业向购买方收取的增值税应作为销项税额","BDE",{"id":587,"libraryId":5,"type":382,"typeLabel":383,"stem":588,"options":589,"answer":440,"analysis":33},223035,"关于项目现金流量分析，下列说法正确的有（ ）。",[590,592,594,596,598],{"key":20,"text":591,"correct":22},"净现金流量分析可以判断项目能否按时还款",{"key":24,"text":593,"correct":22},"全部投资现金流量表中，借款利息和本金的偿还不作为现金流出",{"key":28,"text":595,"correct":26},"自有资金现金流量表中，借款利息作为现金流入，借款本金的偿还作为现金流出",{"key":31,"text":597,"correct":22},"全部投资现金流量表可用于计算全部投资的内部收益率等评价指标",{"key":395,"text":599,"correct":26},"内部收益率可以作为唯一指标来判断项目能否按时还款",{"id":601,"libraryId":5,"type":382,"typeLabel":383,"stem":602,"options":603,"answer":614,"analysis":33},223036,"我国现行税制中，计入产品成本的有（ ）。",[604,606,608,610,612],{"key":20,"text":605,"correct":26},"增值税",{"key":24,"text":607,"correct":22},"房产税",{"key":28,"text":609,"correct":22},"土地使用税",{"key":31,"text":611,"correct":22},"车船牌照使用税",{"key":395,"text":613,"correct":26},"设备进口环节所交关税","BCD",{"id":616,"libraryId":5,"type":382,"typeLabel":383,"stem":617,"options":618,"answer":499,"analysis":33},223037,"以下关于现金流量表的分析正确的是（ ）。",[619,621,623,625,627],{"key":20,"text":620,"correct":22},"现金流量表主要分为全部投资现金流量表和自有资金现金流量表两种",{"key":24,"text":622,"correct":22},"全部投资现金流量表的编制以全部投资作为计算基础",{"key":28,"text":624,"correct":26},"在编制全部投资现金流量表时，借款不作为现金流入，借款利息和本金的偿还作为现金流出",{"key":31,"text":626,"correct":22},"在编制自有资金现金流量表时，借款作为现金流入，借贷款利息和本金的偿还作为现金流出",{"key":395,"text":628,"correct":22},"在编制全部投资现金流量表时，借款不作为现金流入，借款利息和本金的偿还不作为现金流出",{"id":630,"libraryId":5,"type":382,"typeLabel":383,"stem":631,"options":632,"answer":643,"analysis":33},223038,"以下关于项目的不确定性分析正确的是（ ）。",[633,635,637,639,641],{"key":20,"text":634,"correct":26},"盈亏平衡点都是越高越好",{"key":24,"text":636,"correct":26},"盈亏平衡点越高，表明项目抗风险能力越强",{"key":28,"text":638,"correct":22},"项目对某因素的敏感程度可以表示为该因素按一定比例变化时评价指标的变化",{"key":31,"text":640,"correct":22},"项目对某因素的敏感程度也可以表示为评价指标达到某个临界点时允许某因素变化的最大极限",{"key":395,"text":642,"correct":22},"在盈亏平衡点上，企业处于不盈不亏状态","CDE",{"id":645,"libraryId":5,"type":382,"typeLabel":383,"stem":646,"options":647,"answer":614,"analysis":33},223039,"流动资金的估算方法有（ ）。",[648,650,652,654,656],{"key":20,"text":649,"correct":26},"加权平均估算法",{"key":24,"text":651,"correct":22},"资产负债表法",{"key":28,"text":653,"correct":22},"比例系数法",{"key":31,"text":655,"correct":22},"分项详细估算法",{"key":395,"text":657,"correct":26},"回归分析法",{"id":659,"libraryId":5,"type":382,"typeLabel":383,"stem":660,"options":661,"answer":672,"analysis":33},223040,"分析项目的还款能力时，（ ）。",[662,664,666,668,670],{"key":20,"text":663,"correct":22},"可以采用综合还贷的方式计算贷款偿还期",{"key":24,"text":665,"correct":22},"可以应用最大能力法来计算贷款偿还期",{"key":28,"text":667,"correct":22},"可以通过计算贷款偿还期来分析项目能否在银行要求的时间内归还贷款",{"key":31,"text":669,"correct":26},"不需要分析还款资金的来源",{"key":395,"text":671,"correct":22},"应分析用于还款的项目利润是否已按规定提取了公积金","ABCE",[674,677,680,683,686,688],{"id":675,"name":676,"category":7,"favorite":15},109,"发布证券研究报告业务",{"id":678,"name":679,"category":7,"favorite":8},30,"经济师",{"id":681,"name":682,"category":7,"favorite":8},31,"(初级)银行从业资格",{"id":684,"name":685,"category":7,"favorite":8},49,"初级经济师",{"id":10,"name":687,"category":7,"favorite":8},"(初级)保险专业",{"id":689,"name":690,"category":7,"favorite":8},51,"(初级)财政税收"]