[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-92-11":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":646},{"id":5,"name":6,"category":7,"favorite":8},92,"(中级)公司信贷","经济金融",0,11,50,2878,[13,28,48,54,69,84,99,113,128,143,155,169,175,181,196,202,217,231,245,260,275,290,305,320,334,348,362,375,389,404,416,430,436,450,456,470,484,490,504,514,526,538,550,562,574,586,598,610,622,634],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":21,"analysis":27},219853,3,"判断题","净现值率主要用于投资额不等的项目之间的比较，净现值率越大，表明项目单位投资能获得的净现值就越大，项目的效益就越好。（ ）[2014年6月真题]",[19,23],{"key":20,"text":21,"correct":22},"A","正确",true,{"key":24,"text":25,"correct":26},"B","错误",false,"",{"id":29,"libraryId":5,"type":30,"typeLabel":31,"stem":32,"options":33,"answer":47,"analysis":27},219854,2,"多选题","决定一个项目规模大小的因素主要有（ ）。",[34,36,38,41,44],{"key":20,"text":35,"correct":22},"生产技术状况",{"key":24,"text":37,"correct":22},"国民经济发展规划",{"key":39,"text":40,"correct":22},"C","资金与基本投入物",{"key":42,"text":43,"correct":22},"D","项目所处行业的技术经济特点",{"key":45,"text":46,"correct":22},"E","土地使用权的取得","ABCDE",{"id":49,"libraryId":5,"type":15,"typeLabel":16,"stem":50,"options":51,"answer":21,"analysis":27},219856,"流动比率并非越高越好。流动比率越高，说明流动资产相对于流动负债太多，可能是存货积压，也可能是持有现金太多，或者两者兼而有之。（ ）[2014年11月真题]",[52,53],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":55,"libraryId":5,"type":30,"typeLabel":31,"stem":56,"options":57,"answer":68,"analysis":27},219857,"评价项目经营管理能力，重点分析（ ）层面。",[58,60,62,64,66],{"key":20,"text":59,"correct":22},"目标市场",{"key":24,"text":61,"correct":26},"市场需求",{"key":39,"text":63,"correct":26},"社会购买力",{"key":42,"text":65,"correct":22},"营销策略",{"key":45,"text":67,"correct":22},"治理机制","ADE",{"id":70,"libraryId":5,"type":30,"typeLabel":31,"stem":71,"options":72,"answer":83,"analysis":27},219859,"企业缴完所得税以后的利润分配包括（ ）。[2010年5月真题]",[73,75,77,79,81],{"key":20,"text":74,"correct":22},"弥补被没收财务的损失",{"key":24,"text":76,"correct":22},"支付各项税收的滞纳金和罚款",{"key":39,"text":78,"correct":22},"弥补以前年份亏损",{"key":42,"text":80,"correct":26},"偿还银行借款",{"key":45,"text":82,"correct":22},"向投资者分配利润","ABCE",{"id":85,"libraryId":5,"type":30,"typeLabel":31,"stem":86,"options":87,"answer":98,"analysis":27},219861,"确定项目规模应坚持（ ）的原则。",[88,90,92,94,96],{"key":20,"text":89,"correct":26},"比较优势",{"key":24,"text":91,"correct":26},"信号传递",{"key":39,"text":93,"correct":22},"实事求是",{"key":42,"text":95,"correct":22},"量力而行",{"key":45,"text":97,"correct":26},"自主性","CD",{"id":100,"libraryId":5,"type":30,"typeLabel":31,"stem":101,"options":102,"answer":47,"analysis":27},219862,"商业银行对项目进行财务分析，采用的基本财务报表有（ ）。[2015年10月真题]",[103,105,107,109,111],{"key":20,"text":104,"correct":22},"资金来源与运用表",{"key":24,"text":106,"correct":22},"利润表",{"key":39,"text":108,"correct":22},"资产负债表",{"key":42,"text":110,"correct":22},"借款还本付息表",{"key":45,"text":112,"correct":22},"现金流量表",{"id":114,"libraryId":5,"type":30,"typeLabel":31,"stem":115,"options":116,"answer":127,"analysis":27},219864,"商业银行在对贷款项目的技术及工艺流程分析中，对项目的产品技术方案进行分析的内容包括（ ）。[2014年6月真题]",[117,119,121,123,125],{"key":20,"text":118,"correct":26},"产业基础和生产技术水平的协调性",{"key":24,"text":120,"correct":22},"产品方案和市场需求状况",{"key":39,"text":122,"correct":22},"拟建项目的主要产品和副产品所采用的质量标准是否符合要求",{"key":42,"text":124,"correct":26},"工艺技术的先进性和成熟性",{"key":45,"text":126,"correct":26},"设备的生产能力和工艺要求","BC",{"id":129,"libraryId":5,"type":30,"typeLabel":31,"stem":130,"options":131,"answer":142,"analysis":27},219866,"商业银行在对项目产品进行市场需求预测分析时，需求预测的内容应包括（ ）。[2016年6月真题]",[132,134,136,138,140],{"key":20,"text":133,"correct":22},"公司的市场占有率",{"key":24,"text":135,"correct":26},"产品特征",{"key":39,"text":137,"correct":22},"总的市场潜在的需求量",{"key":42,"text":139,"correct":22},"行业的实际销售额",{"key":45,"text":141,"correct":22},"区域市场潜在需求量","ACDE",{"id":144,"libraryId":5,"type":30,"typeLabel":31,"stem":145,"options":146,"answer":83,"analysis":27},219867,"商业银行在进行项目产品的市场需求预测分析时，考虑的主要因素包括（ ）。[2015年5月真题]",[147,149,150,152,154],{"key":20,"text":148,"correct":22},"消费条件",{"key":24,"text":135,"correct":22},{"key":39,"text":151,"correct":22},"产品价格水平",{"key":42,"text":153,"correct":26},"生产技术水平",{"key":45,"text":63,"correct":22},{"id":156,"libraryId":5,"type":30,"typeLabel":31,"stem":157,"options":158,"answer":47,"analysis":27},219869,"设备选择评估的主要内容有（ ）。",[159,161,163,165,167],{"key":20,"text":160,"correct":22},"设备生产能力",{"key":24,"text":162,"correct":22},"设备经济性",{"key":39,"text":164,"correct":22},"设备配套性",{"key":42,"text":166,"correct":22},"设备使用寿命",{"key":45,"text":168,"correct":22},"设备可靠性",{"id":170,"libraryId":5,"type":15,"typeLabel":16,"stem":171,"options":172,"answer":25,"analysis":27},219871,"投资回收期、净现值、净现值率、内部收益率四项指标的计算都必须使用资产负债表。（ ）[2014年11月真题]",[173,174],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":176,"libraryId":5,"type":15,"typeLabel":16,"stem":177,"options":178,"answer":25,"analysis":27},219872,"投资利润率=年利税总额或平均利税总额／项目总投资×l00％。( )",[179,180],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":182,"libraryId":5,"type":30,"typeLabel":31,"stem":183,"options":184,"answer":195,"analysis":27},219874,"我国现行税制中，计人产品成本的有（ ）。",[185,187,189,191,193],{"key":20,"text":186,"correct":26},"设备进口环节所交关税",{"key":24,"text":188,"correct":22},"土地使用税",{"key":39,"text":190,"correct":22},"房产税",{"key":42,"text":192,"correct":22},"车船牌照使用税",{"key":45,"text":194,"correct":26},"增值税","BCD",{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":25,"analysis":27},219875,"无形资产与递延资产根据其原值采用加速递减法分期摊销。（ ）[2014年6月真题]",[200,201],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":203,"libraryId":5,"type":30,"typeLabel":31,"stem":204,"options":205,"answer":216,"analysis":27},219877,"下列对环境保护方案的分析，做法正确的有（ ）。",[206,208,210,212,214],{"key":20,"text":207,"correct":26},"工业项目可不必进行环境保护方案分析",{"key":24,"text":209,"correct":22},"应审查企业提交的环境影响报告，其间要特别注意企业对污染源的控制方案",{"key":39,"text":211,"correct":26},"应审查对投人物、燃料和原材料的用后治理，审查治理技术是否先进",{"key":42,"text":213,"correct":22},"应审查建设总投资与总设计中是否包含环保工程内容",{"key":45,"text":215,"correct":26},"要分析环境保护带来的社会效益，暂不关注环保成本","BD",{"id":218,"libraryId":5,"type":30,"typeLabel":31,"stem":219,"options":220,"answer":195,"analysis":27},219878,"下列关于企业信用度的分析，正确的有（ ）。[2009年6月真题]",[221,223,225,227,229],{"key":20,"text":222,"correct":26},"主要对企业管理人员素质、企业借贷信用评估",{"key":24,"text":224,"correct":22},"企业借贷信用主要通过贷款按期偿还率、还本付息率等指标来评价",{"key":39,"text":226,"correct":22},"经济合同履约信用主要通过经济合同履约率评价",{"key":42,"text":228,"correct":22},"产品信誉评价主要评价企业产品的优质率和合格率、市场竞争力、市场占有率等",{"key":45,"text":230,"correct":26},"企业管理水平主要通过管理人员的业务素质评价",{"id":232,"libraryId":5,"type":30,"typeLabel":31,"stem":233,"options":234,"answer":83,"analysis":27},219880,"下列关于项目生产所需的燃料及动力供应条件分析的说法，正确的有（ ）。",[235,237,239,241,243],{"key":20,"text":236,"correct":22},"所需燃料通常有煤炭、石油和天然气",{"key":24,"text":238,"correct":22},"所需动力主要有电力和蒸汽",{"key":39,"text":240,"correct":22},"要依据产品生产过程、成本、质量、区域环境来选择燃料种类",{"key":42,"text":242,"correct":26},"要根据当地水源分布、水质情况分析用水量",{"key":45,"text":244,"correct":22},"耗电量大又要求连续生产的工业项目，要分析估算项目最大用电量、高峰负荷、",{"id":246,"libraryId":5,"type":30,"typeLabel":31,"stem":247,"options":248,"answer":259,"analysis":27},219882,"下列关于主要工程设计方案的分析，正确的有（ ）。[2009年6月真题]",[249,251,253,255,257],{"key":20,"text":250,"correct":22},"主要工程设计方案是指土建工程设计方案",{"key":24,"text":252,"correct":22},"土建工程主要指地基、一般土建、工业管道、电气及照明等工程",{"key":39,"text":254,"correct":22},"建筑工程方案分析主要对建筑物的平面布置和楼层高度是否适应工艺和设备的需要、建筑结构选择是否经济实用进行评估",{"key":42,"text":256,"correct":26},"施工组织设计分析主要对施工方案、进度、顺序、产品原材料供应进行分析",{"key":45,"text":258,"correct":26},"对工程量的分析应采用相应的行业标准","ABC",{"id":261,"libraryId":5,"type":30,"typeLabel":31,"stem":262,"options":263,"answer":274,"analysis":27},219884,"下列属于借款人生产经营状况和经济技术实力评估的是（ ）。",[264,266,268,270,272],{"key":20,"text":265,"correct":22},"了解借款人近3年的总资产、净资产、固定资产净值、在建工程、长期投资以及工艺技术装备水平等变化情况",{"key":24,"text":267,"correct":26},"分析借款人近3年来各年末的资产、负债、所有者权益总额指标及其增长情况",{"key":39,"text":269,"correct":26},"调查借款人基本结算户开立或资金分流情况，计算借款人近3年短期借款、长期负债的本息偿还率指标",{"key":42,"text":271,"correct":22},"分析近3年来各年主要产品的产量、销售收入、销售税金、利润总额及其增长情况",{"key":45,"text":273,"correct":26},"分析借款人所在行业的特点、发展方向及中长期发展规划，综合评价借款人的发展前景","AD",{"id":276,"libraryId":5,"type":30,"typeLabel":31,"stem":277,"options":278,"answer":289,"analysis":27},219886,"下列属于判断投资理由是否充分的内容有（ ）。",[279,281,283,285,287],{"key":20,"text":280,"correct":22},"能否更充分地利用资源",{"key":24,"text":282,"correct":22},"能否增加加工产品的附加值",{"key":39,"text":284,"correct":26},"能否增加进口或可替代进口",{"key":42,"text":286,"correct":22},"能否扩大生产规模",{"key":45,"text":288,"correct":22},"能否填补本地区的空白","ABDE",{"id":291,"libraryId":5,"type":30,"typeLabel":31,"stem":292,"options":293,"answer":304,"analysis":27},219887,"下列属于项目生产条件分析内容的有（ ）。",[294,296,298,300,302],{"key":20,"text":295,"correct":22},"资源条件",{"key":24,"text":297,"correct":26},"财务资源条件",{"key":39,"text":299,"correct":22},"原材料供应条件",{"key":42,"text":301,"correct":22},"燃料及动力供应条件",{"key":45,"text":303,"correct":26},"厂址选择条件","ACD",{"id":306,"libraryId":5,"type":30,"typeLabel":31,"stem":307,"options":308,"answer":319,"analysis":27},219889,"项目财务评估主要包括( )。",[309,311,313,315,317],{"key":20,"text":310,"correct":26},"项目所需资金落实情况评估",{"key":24,"text":312,"correct":22},"项目投资估算与资金筹措评估",{"key":39,"text":314,"correct":22},"项目基础财务数据评估",{"key":42,"text":316,"correct":22},"项目的盈利能力和清偿能力评估",{"key":45,"text":318,"correct":22},"项目不确定性评估","BCDE",{"id":321,"libraryId":5,"type":30,"typeLabel":31,"stem":322,"options":323,"answer":289,"analysis":27},219891,"项目的盈利能力分析指标主要包括（ ）。[2016年5月真题]",[324,326,328,330,332],{"key":20,"text":325,"correct":22},"投资回收期",{"key":24,"text":327,"correct":22},"投资利润率",{"key":39,"text":329,"correct":26},"资产负债率",{"key":42,"text":331,"correct":22},"资本金利润率",{"key":45,"text":333,"correct":22},"财务内部收益率",{"id":335,"libraryId":5,"type":30,"typeLabel":31,"stem":336,"options":337,"answer":195,"analysis":27},219893,"项目组织机构主要包括（ ）。",[338,340,342,344,346],{"key":20,"text":339,"correct":26},"项目宣传机构",{"key":24,"text":341,"correct":22},"项目实施机构",{"key":39,"text":343,"correct":22},"项目经营机构",{"key":42,"text":345,"correct":22},"项目协作机构",{"key":45,"text":347,"correct":26},"人力资源机构",{"id":349,"libraryId":5,"type":30,"typeLabel":31,"stem":350,"options":351,"answer":259,"analysis":27},219894,"以下描述正确的是（ ）。",[352,354,356,358,360],{"key":20,"text":353,"correct":22},"项目财务评估的合理尺度应该是财税制度所要求的现行价格",{"key":24,"text":355,"correct":22},"项目的经济评估应该使用反映资源合理配置和有效利用的影子价格",{"key":39,"text":357,"correct":22},"项目的经济评估反映项目使用资源和创造资源的真正社会经济价值",{"key":42,"text":359,"correct":26},"项目的社会评估，其核心内容是在项目财务评估的基础上进一步考虑新增国民收入的合理分配问题",{"key":45,"text":361,"correct":26},"项目的财务评估，仅用于判断项目在实行财税制度下的财务盈利能力",{"id":363,"libraryId":5,"type":30,"typeLabel":31,"stem":364,"options":365,"answer":374,"analysis":27},219896,"银行对贷款项目的工程设计方案评估的内容主要包括( )。[2015年l0月真题]",[366,368,369,370,372],{"key":20,"text":367,"correct":26},"选择的设备具有较高的经济性",{"key":24,"text":122,"correct":26},{"key":39,"text":118,"correct":26},{"key":42,"text":371,"correct":22},"主要工程设计方案分析",{"key":45,"text":373,"correct":22},"总平面布置方案分析","DE",{"id":376,"libraryId":5,"type":30,"typeLabel":31,"stem":377,"options":378,"answer":47,"analysis":27},219898,"银行将项目融资业务的全部流程纳入规范化操作模式之中的好处有( )。",[379,381,383,385,387],{"key":20,"text":380,"correct":22},"提高综合收入",{"key":24,"text":382,"correct":22},"全面了解各方面信息",{"key":39,"text":384,"correct":22},"提高识别、评估、控制项目融资业务风险的能力",{"key":42,"text":386,"correct":22},"提高尽职调查工作的效率，保证调查成果质量",{"key":45,"text":388,"correct":22},"为项目融资业务的平稳较快发展提供更加有力的支持",{"id":390,"libraryId":5,"type":30,"typeLabel":31,"stem":391,"options":392,"answer":403,"analysis":27},219900,"银行信贷人员对借款项目的原辅助材料供给分析主要包括（ ）。[2014年6月真题]",[393,395,397,399,401],{"key":20,"text":394,"correct":22},"分析和评价原辅助材料供应数量能否满足项目的要求",{"key":24,"text":396,"correct":22},"分析和评价原辅助材料的质量是否符合生产工艺的要求",{"key":39,"text":398,"correct":22},"分析和评价原辅助材料的存储设施条件",{"key":42,"text":400,"correct":22},"分析和评价原辅助材料的价格、运费及其变动趋势对项目产品成本的影响",{"key":45,"text":402,"correct":26},"分析和评价原辅料的生产条件","ABCD",{"id":405,"libraryId":5,"type":30,"typeLabel":31,"stem":406,"options":407,"answer":289,"analysis":27},219902,"银行在对贷款项目的技术工艺流程分析中，对工艺技术方案的分析评估的内容包括（ ）。[2015年5月真题]",[408,409,411,413,414],{"key":20,"text":118,"correct":22},{"key":24,"text":410,"correct":22},"工艺技术的原材料适应性",{"key":39,"text":412,"correct":26},"设备的配套性",{"key":42,"text":124,"correct":22},{"key":45,"text":415,"correct":22},"技术来源的可靠性和经济性",{"id":417,"libraryId":5,"type":30,"typeLabel":31,"stem":418,"options":419,"answer":83,"analysis":27},219903,"银行在分析项目工艺技术方案时，应考虑技术来源的经济性，这就要考虑工艺技术的运营成本。工艺技术运营成本包括（ ）。[2014年11月真题]",[420,422,424,426,428],{"key":20,"text":421,"correct":22},"人员工资",{"key":24,"text":423,"correct":22},"原材料及能源消耗费",{"key":39,"text":425,"correct":22},"工艺设备及厂房折旧费",{"key":42,"text":427,"correct":26},"贷款利息等财务费用",{"key":45,"text":429,"correct":22},"维护运转费",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":21,"analysis":27},219905,"由于同一项目不同的现金流量分布可能得出相同的内部收益率，因此不能简单以内部收益率来判断项目能否按时还款，但可以借助净现金流量分析，把各年还本付息额跟当年的净现金流量进行对比，就可以判断项目在还款期内能否按时还款。（ ）[2015年5月真题]",[434,435],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":437,"libraryId":5,"type":30,"typeLabel":31,"stem":438,"options":439,"answer":259,"analysis":27},219907,"在贷款项目评估中，银行效益评估包括（ ）。[2014年11月真题]",[440,442,444,446,448],{"key":20,"text":441,"correct":22},"银行效益动态分析",{"key":24,"text":443,"correct":22},"流动性效益评估",{"key":39,"text":445,"correct":22},"盈利性效益评估",{"key":42,"text":447,"correct":26},"项目敏感性分析",{"key":45,"text":449,"correct":26},"清偿性效益评估",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":21,"analysis":27},219908,"在计算现金流量时，折旧费支出、无形资产与递延资产摊销不能作为现金流出。（ ）[2013年11月真题]",[454,455],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":457,"libraryId":5,"type":30,"typeLabel":31,"stem":458,"options":459,"answer":47,"analysis":27},219910,"在项目评估中，贷款人为有效降低和分散融资项目在建设期和经营期的各类风险，可以采取的措施包括（ ）。[2015年10月真题]",[460,462,464,466,468],{"key":20,"text":461,"correct":22},"要求借款人或者通过借款人要求项目相关方投保商业保险",{"key":24,"text":463,"correct":22},"要求借款人使用金融衍生工具对冲相关风险",{"key":39,"text":465,"correct":22},"要求发起人提供资金缺口担保",{"key":42,"text":467,"correct":22},"要求借款人签订长期供销合同",{"key":45,"text":469,"correct":22},"贷款人要求项目相关方提供完工担保",{"id":471,"libraryId":5,"type":30,"typeLabel":31,"stem":472,"options":473,"answer":259,"analysis":27},219912,"在项目评估中，商业银行对项目投资估算与资金筹措评估的内容包括（ ）。[2015年5月真题]",[474,476,478,480,482],{"key":20,"text":475,"correct":22},"各项投资来源的落实情况及项目资本金的到位情况",{"key":24,"text":477,"correct":22},"项目投资估算是否合理",{"key":39,"text":479,"correct":22},"项目总投资及构成的合理性",{"key":42,"text":481,"correct":26},"项目的盈利能力和清偿能力",{"key":45,"text":483,"correct":26},"项目设备选择是否合理",{"id":485,"libraryId":5,"type":15,"typeLabel":16,"stem":486,"options":487,"answer":25,"analysis":27},219913,"自有资金现金流量表是设定在全部投资均为自有资金的情况下，以此为计算基础，借款作为现金流入，借款利息和本金的偿还均作为现金流出。( )",[488,489],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":491,"libraryId":5,"type":492,"typeLabel":493,"stem":494,"options":495,"answer":24,"analysis":27},219915,1,"单选题","（ ）是衡量项目经济效益统一的标准和尺度。",[496,498,500,502],{"key":20,"text":497,"correct":26},"方法规范化原则",{"key":24,"text":499,"correct":22},"指标统一性原则",{"key":39,"text":501,"correct":26},"效益性原则",{"key":42,"text":503,"correct":26},"价值尺度的合理性原则",{"id":505,"libraryId":5,"type":492,"typeLabel":493,"stem":506,"options":507,"answer":42,"analysis":27},219917,"（ ）是考察项目单位投资盈利能力的静态指标。[2015年5月真题]",[508,510,512,513],{"key":20,"text":509,"correct":26},"净现值",{"key":24,"text":511,"correct":26},"净现值率",{"key":39,"text":333,"correct":26},{"key":42,"text":327,"correct":22},{"id":515,"libraryId":5,"type":492,"typeLabel":493,"stem":516,"options":517,"answer":24,"analysis":27},219918,"“酸性测验比率”是指（ ）。[2014年6月真题]",[518,520,522,524],{"key":20,"text":519,"correct":26},"营运资金比率",{"key":24,"text":521,"correct":22},"速动比率",{"key":39,"text":523,"correct":26},"现金比率",{"key":42,"text":525,"correct":26},"流动比率",{"id":527,"libraryId":5,"type":492,"typeLabel":493,"stem":528,"options":529,"answer":24,"analysis":27},219920,"1986年，美国著名市场营销学家菲利浦·科特勒教授在原4P组合的基础上提出了6P营销策略，增加的两个P为（ ）。",[530,532,534,536],{"key":20,"text":531,"correct":26},"权力(Power)、渠道(Place)",{"key":24,"text":533,"correct":22},"权力(Power)、公共关系(Pub1icRelations)",{"key":39,"text":535,"correct":26},"促销(Promotion)、权力(Power)",{"key":42,"text":537,"correct":26},"渠道(Place)、公共关系(PublicRelations)",{"id":539,"libraryId":5,"type":492,"typeLabel":493,"stem":540,"options":541,"answer":42,"analysis":27},219922,"按规定，无形资产规定有效期的，按规定期限平均摊销；没有规定有效期的，按预计使用期限或者不少于（ ）的期限平均摊销。[2010年5月真题]",[542,544,546,548],{"key":20,"text":543,"correct":26},"3年",{"key":24,"text":545,"correct":26},"5年",{"key":39,"text":547,"correct":26},"1年",{"key":42,"text":549,"correct":22},"10年",{"id":551,"libraryId":5,"type":492,"typeLabel":493,"stem":552,"options":553,"answer":20,"analysis":27},219923,"按照年经营成本或年销售收入的一定比例计算流动资金需用量的方法为（ ）。",[554,556,558,560],{"key":20,"text":555,"correct":22},"比例系数法",{"key":24,"text":557,"correct":26},"资产负债表法",{"key":39,"text":559,"correct":26},"趋势分析法",{"key":42,"text":561,"correct":26},"分项详细估算法",{"id":563,"libraryId":5,"type":492,"typeLabel":493,"stem":564,"options":565,"answer":39,"analysis":27},219925,"不属于贷款项目评估中对税金的审查内容为（ ）。[2014年6月真题]",[566,568,570,572],{"key":20,"text":567,"correct":26},"项目所涉及的税种是否都已计算",{"key":24,"text":569,"correct":26},"所采用的税率是否符合现行规定",{"key":39,"text":571,"correct":22},"税金的分配顺序是否正确",{"key":42,"text":573,"correct":26},"计算公式是否正确",{"id":575,"libraryId":5,"type":492,"typeLabel":493,"stem":576,"options":577,"answer":42,"analysis":27},219927,"贷款人分析项目还款资金来源的主要内容不包括（ ）。[2015年1o月真题]",[578,580,582,584],{"key":20,"text":579,"correct":26},"项目有哪些还款资金来源",{"key":24,"text":581,"correct":26},"各种还款资金来源的可靠性如何",{"key":39,"text":583,"correct":26},"项目本身的利润是否已按规定提取了公积金和公益金后承诺来还款",{"key":42,"text":585,"correct":22},"流动资产中的结构如何",{"id":587,"libraryId":5,"type":492,"typeLabel":493,"stem":588,"options":589,"answer":42,"analysis":27},219928,"贷款项目建设的必要性评估不包括（ ）。[2015年10月真题]",[590,592,594,596],{"key":20,"text":591,"correct":26},"项目所属行业当前整体状况分析，国内外情况对比，发展趋势预测，项目所生产产品的生命周期分析",{"key":24,"text":593,"correct":26},"项目产品市场情况分析和项目产品的竞争力分析",{"key":39,"text":595,"correct":26},"贷款项目是否符合国家产业政策，是否符合国家总体布局和地区经济结构的需要",{"key":42,"text":597,"correct":22},"资源条件能否满足项目需要，原辅材料、燃料供应是否有保障，是否经济合理",{"id":599,"libraryId":5,"type":492,"typeLabel":493,"stem":600,"options":601,"answer":39,"analysis":27},219930,"贷款项目评估的出发点为（ ）。[2009年6月真题]",[602,604,606,608],{"key":20,"text":603,"correct":26},"借款人利益",{"key":24,"text":605,"correct":26},"担保人利益",{"key":39,"text":607,"correct":22},"贷款银行利益",{"key":42,"text":609,"correct":26},"国家利益",{"id":611,"libraryId":5,"type":492,"typeLabel":493,"stem":612,"options":613,"answer":42,"analysis":27},219931,"当某项目的累计净现值大于零时，其内部收益率（ ）。[2013年11月真题]",[614,616,618,620],{"key":20,"text":615,"correct":26},"可能小于零",{"key":24,"text":617,"correct":26},"可能等于设定折现率",{"key":39,"text":619,"correct":26},"一定等于零",{"key":42,"text":621,"correct":22},"一定大于设定折现率",{"id":623,"libraryId":5,"type":492,"typeLabel":493,"stem":624,"options":625,"answer":20,"analysis":27},219933,"负责项目方案的准备、挑选、报请上级机关审批，以及项目的建设过程(包括设计、施工、设备购置安装等)的机构为项目的（ ）。",[626,628,630,632],{"key":20,"text":627,"correct":22},"实施机构",{"key":24,"text":629,"correct":26},"经营机构",{"key":39,"text":631,"correct":26},"协作机构",{"key":42,"text":633,"correct":26},"宣传机构",{"id":635,"libraryId":5,"type":492,"typeLabel":493,"stem":636,"options":637,"answer":42,"analysis":27},219935,"宏观经济分析的主要方法不包括（ ）。",[638,640,642,644],{"key":20,"text":639,"correct":26},"指标法",{"key":24,"text":641,"correct":26},"概率预测",{"key":39,"text":643,"correct":26},"计量经济模型分析",{"key":42,"text":645,"correct":22},"专家定性分析",[647,650,653,656,659,661],{"id":648,"name":649,"category":7,"favorite":492},109,"发布证券研究报告业务",{"id":651,"name":652,"category":7,"favorite":8},30,"经济师",{"id":654,"name":655,"category":7,"favorite":8},31,"(初级)银行从业资格",{"id":657,"name":658,"category":7,"favorite":8},49,"初级经济师",{"id":10,"name":660,"category":7,"favorite":8},"(初级)保险专业",{"id":662,"name":663,"category":7,"favorite":8},51,"(初级)财政税收"]