[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-223030":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},223030,92,2,"多选题","以下关于项目盈利能力评价指标的描述正确的是（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","在求内部报酬率时，计算用的两个相邻折现率之差最好不要超过2％，最大不要超过5％",true,{"key":16,"text":17,"correct":14},"B","财务净现值大于零，表明项目的获利能力超过基准收益率或设定收益率",{"key":19,"text":20,"correct":21},"C","净现值率主要用于投资额相等的项目的比较",false,{"key":23,"text":24,"correct":14},"D","净现值率越大，项目单位投资能获得的净现值就越大，项目的效益就越好",{"key":26,"text":27,"correct":14},"E","项目投资回收期小于或等于基准投资回收期时，表明该项目能在规定的时间内收回投资","ABDE","净现值率主要用于投资额不等的项目的比较，选项C错误。",{"id":6,"name":31,"category":32,"favorite":33},"(中级)公司信贷","经济金融",0]