[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-223008":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},223008,92,1,"单选题","在项目融资的项目环境条件分析中。相关项目分析最重要的问题是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","项目建设方案是否同步",true,{"key":16,"text":17,"correct":18},"B","相关项目综合效益",false,{"key":20,"text":21,"correct":18},"C","相关项目成本",{"key":23,"text":24,"correct":18},"D","相关项目与主项目关联性","相关项目分析最重要的问题就是分析项目建设方案是否同步。",{"id":6,"name":27,"category":28,"favorite":29},"(中级)公司信贷","经济金融",0]