[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-222977":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":19},222977,92,3,"判断题","水力发电站的建设规模，主要根据水源的流量和落差来确定。（ ）",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,"不同的部门和行业对项目生产规模有不同的要求。例如，采掘正业的项目规模主要取决于矿区的地质条件及矿产资源的工业储量和工业开采价值；水力发电站的建设规模，主要根据水源的流量和落差来确定等。",{"id":6,"name":21,"category":22,"favorite":23},"(中级)公司信贷","经济金融",0]