[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-222958":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},222958,92,2,"多选题","项目规模评估中的效益成本评比法主要有（ ）。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","盈亏平衡点比较法",true,{"key":16,"text":17,"correct":14},"B","净现值比较法",{"key":19,"text":20,"correct":14},"C","最低成本分析法",{"key":22,"text":23,"correct":24},"D","内部报酬率法",false,{"key":26,"text":27,"correct":24},"E","多因素评比法","ABC","多因素评比法是项目规模评估方法，但不属于效益成本评比法，E项不符合题意，D项是干扰项。",{"id":6,"name":31,"category":32,"favorite":33},"(中级)公司信贷","经济金融",0]