[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-222940":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},222940,92,1,"单选题","商业银行在项目评估中，对项目设备选择是否合理进行的评估属于（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","项目技术评估",true,{"key":16,"text":17,"correct":18},"B","项目建设配套条件评估",false,{"key":20,"text":21,"correct":18},"C","银行效益评估",{"key":23,"text":24,"correct":18},"D","项目财务评估","项目技术评估是指投资建设项目采用的工艺、技术、设备在经济合理条件下是否先进、适用，是否符合相关国家的技术发展政策，是否注意节约能源和原材料以获得最大效益；购进的技术和设备是否符合投资实际，是否配套并进行多方案比较；投资项目所采用的新工艺、新技术、新设备是否经过科学的试验和鉴定，检验原材料和测试产品质量的各种手段是否完备；产品方案和资源利用是否合理，产品生产纲领和工艺、设备选择是否协调；技术方案的综合评价。",{"id":6,"name":27,"category":28,"favorite":29},"(中级)公司信贷","经济金融",0]