[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-222922":3},{"question":4,"library":29},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":27,"analysis":28},222922,92,2,"多选题","项目评估的内容包括（ ）。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","项目建设的必要性评估",true,{"key":16,"text":17,"correct":14},"B","项目建设配套条件评估",{"key":19,"text":20,"correct":14},"C","项目财务评估",{"key":22,"text":23,"correct":14},"D","借款人及项目股东情况",{"key":25,"text":26,"correct":14},"E","项目技术评估","ABCDE","项目评估的内容包括：①项目建设的必要性评估；②项目建设配套条件评估；③项目技术评估；④借款人及项目股东情况；⑤项目财务评估；⑥项目担保及风险分担；⑦项目融资方案；⑧银行效益评估。",{"id":6,"name":30,"category":31,"favorite":32},"(中级)公司信贷","经济金融",0]