[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-222916":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},222916,92,2,"多选题","对项目建设的必要性评估内容包括（ ）。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","项目所属行业当前整体状况分析",true,{"key":16,"text":17,"correct":14},"B","贷款项目是否符合国家产业政策",{"key":19,"text":20,"correct":14},"C","项目产品市场情况分析",{"key":22,"text":23,"correct":14},"D","项目产品的竞争力分析",{"key":25,"text":26,"correct":27},"E","相关及配套项目是否同步建设",false,"ABCD","相关及配套项目是否同步建设属于项目建设配套条件评估内容，E选项不符合题意。",{"id":6,"name":31,"category":32,"favorite":33},"(中级)公司信贷","经济金融",0]