[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-221901":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},221901,92,3,"判断题","基本预备费一般按固定资产投资中工程费用和其他费用之和20％测算。（ ）",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"基本预备费一般按固定资产投资中工程费用和其他费用之和的10％测算。",{"id":6,"name":21,"category":22,"favorite":23},"(中级)公司信贷","经济金融",0]