[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-220852":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},220852,92,2,"多选题","项目经营期检查应重点关注的内容包括（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","项目所在行业风险情况",true,{"key":16,"text":17,"correct":18},"B","项目生产数据和技术指标是否达到预定标准",false,{"key":20,"text":21,"correct":18},"C","项目的建设、技术、市场条件是否发生变化",{"key":23,"text":24,"correct":14},"D","项目生产经营及市场销售是否正常",{"key":26,"text":27,"correct":14},"E","借款人整体现金流是否正常","ADE","除ADE三项外，项目经营期检查应重点关注的内容还包括：①由项目产生的收入现金流及还贷资金是否能达到原来项目评估报告的要求；②项目经营收入是否按约定按时、足额回笼交行；③项目融资的项目经营收入账户资金流动是否异常。B项属于项目试生产期检查的内容；C项属于项目建设期检查的内容。",{"id":6,"name":31,"category":32,"favorite":33},"(中级)公司信贷","经济金融",0]