[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-220044":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},220044,92,1,"单选题","下列关于项目建设条件的说法，正确的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","主要包括企业自身内部条件和主客观外部条件",false,{"key":16,"text":17,"correct":18},"B","内部条件是指拟建项目的人力、物力、财务资源条件",true,{"key":20,"text":21,"correct":14},"C","外部条件是指拟建工程所需的原材料、建筑施工条件",{"key":23,"text":24,"correct":14},"D","人力资源是指项目建设所需管理人员的来源","A项，拟建项目的建设条件包括客观存在的外部条件和项目自身的内部条件；C项，外部条件主要是指建筑施工条件、相关项目的协作配套条件以及国家规定的环境保护条件；D项，人力资源是指技术力量和劳动力的来源及人员培训方案等情况，属于企业内部条件。",{"id":6,"name":27,"category":28,"favorite":29},"(中级)公司信贷","经济金融",0]