[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-220022":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},220022,92,1,"单选题","银行在对贷款项目技术及工艺流程分析中，（ ）是项目技术可行性分析的核心。[2014年11月真题]",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","工程设计方案评估",false,{"key":16,"text":17,"correct":18},"B","工艺技术方案分析",true,{"key":20,"text":21,"correct":14},"C","设备评估",{"key":23,"text":24,"correct":14},"D","产品技术方案分析","工艺技术方案的分析评估是投资项目技术可行性分析的核心，工艺技术设计标准的好坏和高低，对整个项目的设立及执行有决定性影响。",{"id":6,"name":27,"category":28,"favorite":29},"(中级)公司信贷","经济金融",0]