[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-220011":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},220011,92,1,"单选题","银行对贷款项目技术及工艺流程进行分析评估的目的是（ ）。[2015年10月真题]",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","分析产品生产全过程技术方法的可行性",true,{"key":16,"text":17,"correct":18},"B","分析产品方案和市场需求状况",false,{"key":20,"text":21,"correct":18},"C","分析项目的规格、品种、技术性能以及产品的质量",{"key":23,"text":24,"correct":18},"D","分析所选择的设备具有较高的经济性","银行对项目进行技术及工艺流程分析的目的是要分析产品生产全过程技术方法的可行性，并通过不同工艺方案的比较，分析其技术方案是否是综合效果最佳的工艺技术方案。",{"id":6,"name":27,"category":28,"favorite":29},"(中级)公司信贷","经济金融",0]