[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-219964":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},219964,92,1,"单选题","商业银行在项目评估中，对项目设备选择是否合理进行的评估属于（ ）。[2015年5月真题]",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","项目技术评估",true,{"key":16,"text":17,"correct":18},"B","银行效益评估",false,{"key":20,"text":21,"correct":18},"C","项目建设配套条件评估",{"key":23,"text":24,"correct":18},"D","项目财务评估","项目技术评估包括：①项目所采用的技术是否先进、适用、合理、协调，是否与项目其他条件相配套；②项目设备选择是否合理；③所采用的设备能否与生产工艺、资源条件及项目单位的工人技术水平和管理者的管理水平相协调；④引进设备的必要性，引进设备后对国外配件、维修材料、辅料的依赖程度和解决途径；⑤引进设备与国内设备能否相协调。",{"id":6,"name":27,"category":28,"favorite":29},"(中级)公司信贷","经济金融",0]