[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-219933":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},219933,92,1,"单选题","负责项目方案的准备、挑选、报请上级机关审批，以及项目的建设过程(包括设计、施工、设备购置安装等)的机构为项目的（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","实施机构",true,{"key":16,"text":17,"correct":18},"B","经营机构",false,{"key":20,"text":21,"correct":18},"C","协作机构",{"key":23,"text":24,"correct":18},"D","宣传机构","项目方案的准备、挑选、报请上级机关审批，以及项目的建设过程(包括设计、施工、设备购置安装等)一般由项目的实施机构(我国称为项目建设单位)负责。建设单位不一定具体承担建设工作，但对整个建设过程负责。",{"id":6,"name":27,"category":28,"favorite":29},"(中级)公司信贷","经济金融",0]