[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-219902":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},219902,92,2,"多选题","银行在对贷款项目的技术工艺流程分析中，对工艺技术方案的分析评估的内容包括（ ）。[2015年5月真题]",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","产业基础和生产技术水平的协调性",true,{"key":16,"text":17,"correct":14},"B","工艺技术的原材料适应性",{"key":19,"text":20,"correct":21},"C","设备的配套性",false,{"key":23,"text":24,"correct":14},"D","工艺技术的先进性和成熟性",{"key":26,"text":27,"correct":14},"E","技术来源的可靠性和经济性","ABDE","除ABDE四项外，银行在进行工艺技术方案的分析评估时还需要考虑：①工艺技术方案是否能保证产品质量；②工艺技术的经济合理性；③工艺技术实施的可行性；④工艺技术实施对生态环境的影响。",{"id":6,"name":31,"category":32,"favorite":33},"(中级)公司信贷","经济金融",0]