[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-219889":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},219889,92,2,"多选题","项目财务评估主要包括( )。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","项目所需资金落实情况评估",false,{"key":16,"text":17,"correct":18},"B","项目投资估算与资金筹措评估",true,{"key":20,"text":21,"correct":18},"C","项目基础财务数据评估",{"key":23,"text":24,"correct":18},"D","项目的盈利能力和清偿能力评估",{"key":26,"text":27,"correct":18},"E","项目不确定性评估","BCDE","A项，项目所需资金落实情况属于项目建设配套条件评估的内容。",{"id":6,"name":31,"category":32,"favorite":33},"(中级)公司信贷","经济金融",0]