[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-219861":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},219861,92,2,"多选题","确定项目规模应坚持（ ）的原则。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","比较优势",false,{"key":16,"text":17,"correct":14},"B","信号传递",{"key":19,"text":20,"correct":21},"C","实事求是",true,{"key":23,"text":24,"correct":21},"D","量力而行",{"key":26,"text":27,"correct":14},"E","自主性","CD","确定项目规模应本着实事求是、量力而行的原则。确定项目规模时，必须考虑到建设资金和资源的供应情况。",{"id":6,"name":31,"category":32,"favorite":33},"(中级)公司信贷","经济金融",0]