[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-219806":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},219806,92,2,"多选题","在贷款项目评估中，银行效益评估包括( )。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","银行效益动态分析",true,{"key":16,"text":17,"correct":14},"B","流动性效益评估",{"key":19,"text":20,"correct":14},"C","盈利性效益评估",{"key":22,"text":23,"correct":24},"D","项目敏感性分析",false,{"key":26,"text":27,"correct":24},"E","清偿性效益评估","ABC","贷款项目评估包括：项目建设的必要性评估、项目建设配套条件评估、项目技术评估、借款人及项目股东情况、项目财务评估、项目担保及风险分担、项目融资方案和银行效益评估。其中，银行效益评估包括盈利性效益评估、流动性效益评估和银行效益动态分析三个方面。",{"id":6,"name":31,"category":32,"favorite":33},"(中级)公司信贷","经济金融",0]