[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-219788":3},{"question":4,"library":29},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":27,"analysis":28},219788,92,2,"多选题","对工程总平面图布置合理性的评估，主要应从( )方面进行。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","生产工艺流畅性",true,{"key":16,"text":17,"correct":14},"B","是否符合土地管理规划要求",{"key":19,"text":20,"correct":14},"C","布置是否紧凑",{"key":22,"text":23,"correct":14},"D","是否符合卫生要求",{"key":25,"text":26,"correct":14},"E","能否节约用地","ABCDE","技术评估中，主要从以下几方面分析总图布置的合理性：①是否满足生产工艺流程流畅；②是否符合国土规划、土地管理和城市规划的要求；③布置是否紧凑，能否适应场内外运输的要求；④是否符合卫生、安全要求；⑤能否节约用地、节约投资；⑥是否经济合理。",{"id":6,"name":30,"category":31,"favorite":32},"(中级)公司信贷","经济金融",0]