[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-219784":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},219784,92,2,"多选题","下列关于主要工程设计方案的分析，正确的有( )。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","主要工程设计方案是指土建工程设计方案",true,{"key":16,"text":17,"correct":14},"B","土建工程主要指地基、一般土建、工业管道、电气及照明等工程",{"key":19,"text":20,"correct":14},"C","建筑工程方案分析主要对建筑物的平面布置和楼层高度是否适应工艺和设备的需要、建筑结构选择是否经济实用进行评估",{"key":22,"text":23,"correct":24},"D","施工组织设计分析主要对施工方案、进度、顺序、产品原材料供应进行分析",false,{"key":26,"text":27,"correct":24},"E","对工程量的分析应采用相应的行业标准","ABC","D项，施工组织设计分析主要对施工方案、进度、顺序、建设材料供应计划等进行分析，产品原材料的供应分析属于项目生产条件分析的内容；E项，在施工方案分析中，对工程量的分析应以相应的额定标准为依据来进行。",{"id":6,"name":31,"category":32,"favorite":33},"(中级)公司信贷","经济金融",0]