[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-219600":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},219600,92,1,"单选题","银行在进行贷款项目评估时，需剔除( )。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","通胀率影响",false,{"key":16,"text":17,"correct":14},"B","偶然因素影响",{"key":19,"text":20,"correct":14},"C","系统性风险因素",{"key":22,"text":23,"correct":24},"D","项目可行性研究报告中可能影响评估结果的各种非客观因素",true,"银行在进行贷款项目评估时，要根据项目的具体情况，剔除项目可行性研究报告中可能存在的、将影响评估结果的各种非客观因素，重新对项目的可行性进行分析和判断，为银行贷款决策提供依据。",{"id":6,"name":27,"category":28,"favorite":29},"(中级)公司信贷","经济金融",0]