[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-219543":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},219543,92,1,"单选题","项目建设期间发生的工程费用、工程其他费用及预备费属于( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","固定投资",false,{"key":16,"text":17,"correct":18},"B","建设投资",true,{"key":20,"text":21,"correct":14},"C","建筑工程费用",{"key":23,"text":24,"correct":14},"D","流动资产投资","项目总投资由建设投资、流动资金、投资方向调节税和建设期利息四部分组成。其中，建设投资按用途可分为工程费用、工程其他费用及预备费。",{"id":6,"name":27,"category":28,"favorite":29},"(中级)公司信贷","经济金融",0]