[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-219536":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},219536,92,1,"单选题","流动资金分年使用计划应根据( )来安排。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","建设进度",false,{"key":16,"text":17,"correct":14},"B","资金来源渠道",{"key":19,"text":20,"correct":14},"C","资金到位情况",{"key":22,"text":23,"correct":24},"D","项目的达产率",true,"应根据项目的建设进度、资金来源渠道和资金到位情况安排全部建设资金分年使用计划和建设资金中各种渠道的资金的分年使用计划；应根据项目的达产率安排流动资金分年使用计划。",{"id":6,"name":27,"category":28,"favorite":29},"(中级)公司信贷","经济金融",0]