[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-868-5":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":581},{"id":5,"name":6,"category":7,"favorite":8},868,"装饰方向-通用基础","建筑工程",0,5,50,579,[13,34,46,58,70,85,97,105,117,129,141,150,162,174,186,198,210,218,226,238,250,262,274,286,298,309,320,330,339,347,359,373,384,394,403,415,427,437,449,461,471,480,492,502,510,521,533,545,557,569],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1277685,1,"单选题","某简支受载荷如图所示，现分别用Ra、Rb表示支座，4.B处的约束反力。则它们的关系为( )。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","Ra、",false,{"key":24,"text":25,"correct":22},"B","Ra>Rb",{"key":27,"text":28,"correct":29},"C","Ra=Rb",true,{"key":31,"text":32,"correct":22},"D","无法比较","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1277686,"平行于横截面的竖向外力称为( ).此力是粱横截面上的切向分布内力的合力。",[38,40,42,44],{"key":20,"text":39,"correct":29},"拉力",{"key":24,"text":41,"correct":22},"压力",{"key":27,"text":43,"correct":22},"剪力",{"key":31,"text":45,"correct":22},"弯矩",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1277687,"图示力F=2kN对A点之矩为( )kN•m。",[50,52,54,56],{"key":20,"text":51,"correct":29},"2",{"key":24,"text":53,"correct":22},"4",{"key":27,"text":55,"correct":22},"-2",{"key":31,"text":57,"correct":22},"-4",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1277688,"一力F的大小为80kN,其在X轴上的分力大小为40kN,力F与x轴的夹角应为( )°。",[62,64,66,68],{"key":20,"text":63,"correct":29},"60",{"key":24,"text":65,"correct":22},"30",{"key":27,"text":67,"correct":22},"90",{"key":31,"text":69,"correct":22},"无法确定",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},1277689,"同定端支座不仅可以限制物体的( ),还能限制物体的( )。",[74,76,78,80,82],{"key":20,"text":75,"correct":22},"运动,移动",{"key":24,"text":77,"correct":22},"移动,活动",{"key":27,"text":79,"correct":22},"转动,活动",{"key":31,"text":81,"correct":29},"移动,转动",{"key":83,"text":84,"correct":22},"E","活动,转动",{"id":86,"libraryId":5,"type":15,"typeLabel":16,"stem":87,"options":88,"answer":24,"analysis":33},1277690,"由绳索、链条、胶带等柔体构成的约束称为( )约束。",[89,91,93,95],{"key":20,"text":90,"correct":22},"光滑面约束",{"key":24,"text":92,"correct":29},"柔体约束",{"key":27,"text":94,"correct":22},"链杆约束",{"key":31,"text":96,"correct":22},"固定端约束",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":20,"analysis":33},1277691,"如图所示ABC。其正确的受力图为( )。",[101,102,103,104],{"key":20,"text":20,"correct":29},{"key":24,"text":24,"correct":22},{"key":27,"text":27,"correct":22},{"key":31,"text":31,"correct":22},{"id":106,"libraryId":5,"type":15,"typeLabel":16,"stem":107,"options":108,"answer":24,"analysis":33},1277692,"图示为一轴力杆,其中最大的拉力为( )。",[109,111,113,115],{"key":20,"text":110,"correct":22},"12kN",{"key":24,"text":112,"correct":29},"20kN",{"key":27,"text":114,"correct":22},"8kN",{"key":31,"text":116,"correct":22},"13kN",{"id":118,"libraryId":5,"type":15,"typeLabel":16,"stem":119,"options":120,"answer":27,"analysis":33},1277693,"下列措施中,不属于施工项目安全控制的措施的是安全( )。",[121,123,125,127],{"key":20,"text":122,"correct":22},"组织措施",{"key":24,"text":124,"correct":22},"技术措施",{"key":27,"text":126,"correct":29},"管理措施",{"key":31,"text":128,"correct":22},"制度措施",{"id":130,"libraryId":5,"type":15,"typeLabel":16,"stem":131,"options":132,"answer":27,"analysis":33},1277694,"下列各项措施中,不属于施工项目质量控制的措施的是( )。",[133,135,137,139],{"key":20,"text":134,"correct":22},"提高管理、施工及操作人员自身素质",{"key":24,"text":136,"correct":22},"提高施工的质量管理水平",{"key":27,"text":138,"correct":29},"尽可能采用先进的施工技术、方法和新材料、亲工艺、新技术一保证进度目标实现",{"key":31,"text":140,"correct":22},"加强施工项目的过程控制",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":31,"analysis":33},1277695,"为了取得施T成本管理的理想效果,必须从多方面采取有效措施实施管理,这些措施不包括( )。",[145,146,147,149],{"key":20,"text":122,"correct":22},{"key":24,"text":124,"correct":22},{"key":27,"text":148,"correct":22},"经济措施",{"key":31,"text":126,"correct":29},{"id":151,"libraryId":5,"type":15,"typeLabel":16,"stem":152,"options":153,"answer":24,"analysis":33},1277696,"施工项目目标控制包括:施丁项目进度控制、施工项目质量控制、( )、施工项目安全控制四个方面。",[154,156,158,160],{"key":20,"text":155,"correct":22},"施工项目管理控制",{"key":24,"text":157,"correct":29},"施工项目成本控制",{"key":27,"text":159,"correct":22},"施工项目人力控制",{"key":31,"text":161,"correct":22},"施工项目物资控制",{"id":163,"libraryId":5,"type":15,"typeLabel":16,"stem":164,"options":165,"answer":27,"analysis":33},1277697,"下列选项中,不属于建立施工项目经理部的基本原则的是( )。",[166,168,170,172],{"key":20,"text":167,"correct":22},"根据所设计的项目组织形式设置",{"key":24,"text":169,"correct":22},"适应现场施工的需要",{"key":27,"text":171,"correct":29},"满足建设单位关于施工项目日标控制的要求",{"key":31,"text":173,"correct":22},"根据施工工程任务需要调整",{"id":175,"libraryId":5,"type":15,"typeLabel":16,"stem":176,"options":177,"answer":27,"analysis":33},1277698,"下列关于施工项目管理组织的形式的说法中,错误的是( )。",[178,180,182,184],{"key":20,"text":179,"correct":22},"工作队式项目组织适用于大型项目,工期要求紧,要求多工种、多部门配合的项目",{"key":24,"text":181,"correct":22},"事业部式适用于大型经营型企业的工程承包",{"key":27,"text":183,"correct":29},"部门控制式项目组织一般适用于专业性强的大中型项目",{"key":31,"text":185,"correct":22},"矩阵式项目组织适用于同时承担多个需要进行项目管理工程的企业",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":20,"analysis":33},1277699,"下列施T项目管理程序的排序正确的是( )。",[190,192,194,196],{"key":20,"text":191,"correct":29},"投标、签订合同一施工准备一施工一验收交工与结算一用后服务",{"key":24,"text":193,"correct":22},"施工准备一投标、签订合同一施工一验收交工与结算一用后服务",{"key":27,"text":195,"correct":22},"投标、签订合同一施工一施工准备一验收交工与结算一用后服务",{"key":31,"text":197,"correct":22},"投标、签订合同一施工准备一施工一验收交工一用后服务与结算",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":31,"analysis":33},1277700,"木材表面基层处理时,木材基层的含水率不得大于( )。",[202,204,206,208],{"key":20,"text":203,"correct":22},"5%",{"key":24,"text":205,"correct":22},"8%",{"key":27,"text":207,"correct":22},"10%",{"key":31,"text":209,"correct":29},"12%",{"id":211,"libraryId":5,"type":15,"typeLabel":16,"stem":212,"options":213,"answer":27,"analysis":33},1277701,"混凝土和抹灰表面基层处理时,施涂水性和乳液型涂料,基体或基层含水率不得大于( )。",[214,215,216,217],{"key":20,"text":203,"correct":22},{"key":24,"text":205,"correct":22},{"key":27,"text":207,"correct":29},{"key":31,"text":209,"correct":22},{"id":219,"libraryId":5,"type":15,"typeLabel":16,"stem":220,"options":221,"answer":24,"analysis":33},1277702,"混凝土和抹灰表面基层处理时,施涂溶剂型涂料,基体或基层含水率不得大于( )。",[222,223,224,225],{"key":20,"text":203,"correct":22},{"key":24,"text":205,"correct":29},{"key":27,"text":207,"correct":22},{"key":31,"text":209,"correct":22},{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":27,"analysis":33},1277703,"混凝土和抹灰表面基层处理时,施涂前应将基体或基层的缺棱掉角处、孔洞用( )的水泥砂浆（或聚合物水泥砂浆）修补。",[230,232,234,236],{"key":20,"text":231,"correct":22},"1:1",{"key":24,"text":233,"correct":22},"1:2",{"key":27,"text":235,"correct":29},"1:3",{"key":31,"text":237,"correct":22},"1:4",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":20,"analysis":33},1277704,"涂饰工程的施工工艺是( )。",[242,244,246,248],{"key":20,"text":243,"correct":29},"基层处理→打底子→刮腻子→磨光→施涂涂料→养护",{"key":24,"text":245,"correct":22},"基层处理→刮腻子→打底子→磨光→施涂涂料→养护",{"key":27,"text":247,"correct":22},"基层处理→打底子→刮腻子→施涂涂料→磨光→养护",{"key":31,"text":249,"correct":22},"基层处理→打底子→刮腻子→磨光→养护→施涂涂料",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":20,"analysis":33},1277705,"内墙面砖铺贴工艺流程是( )。",[254,256,258,260],{"key":20,"text":255,"correct":29},"基层处理→浸砖→复查墙面规矩→安放垫尺→搅拌水泥浆→镶贴→擦缝",{"key":24,"text":257,"correct":22},"浸砖→基层处理→复查墙面规矩→安放垫尺→搅拌水泥浆→镶贴→擦缝",{"key":27,"text":259,"correct":22},"浸砖→基层处理→安放垫尺→搅拌水泥浆→复查墙面规矩→镶贴→擦缝",{"key":31,"text":261,"correct":22},"基层处理→浸砖→安放垫尺→搅拌水泥浆→复查墙面规矩→镶贴→擦缝",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":24,"analysis":33},1277706,"玻璃地弹簧门安装工艺流程是( )。",[266,268,270,272],{"key":20,"text":267,"correct":22},"划线定位→固定钢化玻璃→注玻璃胶封口→倒角处理→玻璃板对接→活动玻璃门扇安装→清理",{"key":24,"text":269,"correct":29},"划线定位→倒角处理→固定钢化玻璃→注玻璃胶封口→玻璃板对接→活动玻璃门扇安装→清理",{"key":27,"text":271,"correct":22},"划线定位→固定钢化玻璃→倒角处理→注玻璃胶封口→玻璃板对接→活动玻璃门扇安装→清理",{"key":31,"text":273,"correct":22},"划线定位→倒角处理→固定钢化玻璃→玻璃板对接→注玻璃胶封口→活动玻璃门扇安装→清理",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":20,"analysis":33},1277707,"塑钢彩板门窗安装工艺流程是( )。",[278,280,282,284],{"key":20,"text":279,"correct":29},"划线定位→塑钢门窗披水安装→防腐处理→塑钢门窗安装→嵌门窗四缝→门窗扇及玻璃的安装→安装五金配件",{"key":24,"text":281,"correct":22},"划线定位→防腐处理→塑钢门窗披水安装→塑钢门窗安装→嵌门窗四缝→门窗扇及玻璃的安装→安装五金配件",{"key":27,"text":283,"correct":22},"划线定位→防腐处理→塑钢门窗披水安装→塑钢门窗安装→门窗扇及玻璃的安装→嵌门窗四缝→安装五金配件",{"key":31,"text":285,"correct":22},"划线定位→塑钢门窗披水安装→防腐处理→塑钢门窗安装→门窗扇及玻璃的安装→嵌门窗四缝→安装五金配件",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":20,"analysis":33},1277708,"铝合金门窗安装工艺流程是( )。",[290,292,294,296],{"key":20,"text":291,"correct":29},"放线→安框→填缝、抹面→门窗扇安装→安装五金配件",{"key":24,"text":293,"correct":22},"放线→安框→门窗扇安装→填缝、抹面→安装五金配件",{"key":27,"text":295,"correct":22},"放线→填缝、抹面→安框→门窗扇安装→安装五金配件",{"key":31,"text":297,"correct":22},"放线→安框→安装五金配件→填缝、抹面→门窗扇安装",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":27,"analysis":33},1277709,"门窗框的宽度超过( )mm时,背面应推凹槽,以防卷曲。",[302,303,305,307],{"key":20,"text":67,"correct":22},{"key":24,"text":304,"correct":22},"100",{"key":27,"text":306,"correct":29},"120",{"key":31,"text":308,"correct":22},"150",{"id":310,"libraryId":5,"type":15,"typeLabel":16,"stem":311,"options":312,"answer":31,"analysis":33},1277710,"门窗框及厚度大于( )mm的门窗扇应采用双夹榫连接。",[313,315,316,318],{"key":20,"text":314,"correct":22},"20",{"key":24,"text":65,"correct":22},{"key":27,"text":317,"correct":22},"40",{"key":31,"text":319,"correct":29},"50",{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":31,"analysis":33},1277711,"门窗框料有顺弯时,其弯度一般不应超过( )mm。扭弯者一般不准使用。",[324,326,327,329],{"key":20,"text":325,"correct":22},"1",{"key":24,"text":51,"correct":22},{"key":27,"text":328,"correct":22},"3",{"key":31,"text":53,"correct":29},{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":31,"analysis":33},1277712,"配料、截料、刨料时要合理确定加工余量,宽度和厚度的加工余量,两面刨光者留( )mm。",[334,335,336,337],{"key":20,"text":325,"correct":22},{"key":24,"text":51,"correct":22},{"key":27,"text":328,"correct":22},{"key":31,"text":338,"correct":29},"5",{"id":340,"libraryId":5,"type":15,"typeLabel":16,"stem":341,"options":342,"answer":27,"analysis":33},1277713,"配料、截料、刨料时要合理确定加工余量,宽度和厚度的加工余量,一面刨光者留( )mm。",[343,344,345,346],{"key":20,"text":325,"correct":22},{"key":24,"text":51,"correct":22},{"key":27,"text":328,"correct":29},{"key":31,"text":338,"correct":22},{"id":348,"libraryId":5,"type":15,"typeLabel":16,"stem":349,"options":350,"answer":20,"analysis":33},1277714,"木门窗制作的工艺是( )。",[351,353,355,357],{"key":20,"text":352,"correct":29},"配料、截料、刨料→画线→凿眼→拉肩、开榫→起线→拼装",{"key":24,"text":354,"correct":22},"配料、截料、刨料→凿眼→画线→拉肩、开榫→起线→拼装",{"key":27,"text":356,"correct":22},"配料、截料、刨料→凿眼→画线→起线→拉肩、开榫→拼装",{"key":31,"text":358,"correct":22},"配料、截料、刨料→画线→拉肩、开榫→凿眼→起线→拼装",{"id":360,"libraryId":5,"type":15,"typeLabel":16,"stem":361,"options":362,"answer":20,"analysis":33},1277715,"外墙抹灰施工工艺的流程是( )。",[363,365,367,369,371],{"key":20,"text":364,"correct":29},"基层清理→找规矩→做灰饼、冲筋→贴分格条→抹底层灰→抹中层灰→抹面层灰→滴水线（槽）→清理",{"key":24,"text":366,"correct":22},"找规矩→基层清理→做灰饼、冲筋→贴分格条→抹底层灰→抹中层灰→抹面层灰→清理",{"key":27,"text":368,"correct":22},"找规矩→基层清理→做灰饼、冲筋→抹底层灰→抹中层灰→滴水线（槽）→抹面层灰→清理",{"key":31,"text":370,"correct":22},"基层清理→找规矩→做灰饼、冲筋→抹底层灰→抹中层灰→贴分格条→滴水线",{"key":83,"text":372,"correct":22},"）→抹面层灰→清理",{"id":374,"libraryId":5,"type":15,"typeLabel":16,"stem":375,"options":376,"answer":31,"analysis":33},1277716,"做阳角护角时,如设计无要求,暗护角每侧宽度不应小于( )mm。",[377,379,381,383],{"key":20,"text":378,"correct":22},"10",{"key":24,"text":380,"correct":22},"15",{"key":27,"text":382,"correct":22},"25",{"key":31,"text":319,"correct":29},{"id":385,"libraryId":5,"type":15,"typeLabel":16,"stem":386,"options":387,"answer":31,"analysis":33},1277717,"做阳角护角时,如设计无要求,暗护角高度不应低于( )m。",[388,390,391,393],{"key":20,"text":389,"correct":22},"0.5",{"key":24,"text":325,"correct":22},{"key":27,"text":392,"correct":22},"1.5",{"key":31,"text":51,"correct":29},{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":24,"analysis":33},1277718,"做阳角护角时,如设计无要求,一般采用( )水泥砂浆做暗护角。",[398,399,400,401],{"key":20,"text":231,"correct":22},{"key":24,"text":233,"correct":29},{"key":27,"text":235,"correct":22},{"key":31,"text":402,"correct":22},"1:1.5",{"id":404,"libraryId":5,"type":15,"typeLabel":16,"stem":405,"options":406,"answer":20,"analysis":33},1277719,"内墙抹灰施工工艺的流程是( )。",[407,409,411,413],{"key":20,"text":408,"correct":29},"基层清理→弹线找规矩→做灰饼、冲筋→做阳角护角→抹底层灰→抹中层灰→抹阳台板、踢脚板（或墙裙）→抹面层灰→清理",{"key":24,"text":410,"correct":22},"弹线找规矩→基层清理→做灰饼、冲筋→做阳角护角→抹底层灰→抹中层灰→抹阳台板、踢脚板（或墙裙）→抹面层灰→清理",{"key":27,"text":412,"correct":22},"弹线找规矩→基层清理→做阳角护角→做灰饼、冲筋→抹底层灰→抹中层灰→抹阳台板、踢脚板（或墙裙）→抹面层灰→清理",{"key":31,"text":414,"correct":22},"基层清理→弹线找规矩→做阳角护角→做灰饼、冲筋→抹底层灰→抹中层灰→抹阳台板、踢脚板（或墙裙）→抹面层灰→清理",{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":27,"analysis":33},1277720,"轻钢龙骨吊顶施工工艺流程是( )。",[419,421,423,425],{"key":20,"text":420,"correct":22},"弹线→主龙骨安装→次龙骨安装→吊杆安装→面板安装（安装灯具）→板缝处理",{"key":24,"text":422,"correct":22},"弹线→吊杆安装→主龙骨安装→次龙骨安装→板缝处理→面板安装（安装灯具）",{"key":27,"text":424,"correct":29},"弹线→吊杆安装→主龙骨安装→次龙骨安装→面板安装（安装灯具）→板缝处理",{"key":31,"text":426,"correct":22},"弹线→主龙骨安装→次龙骨安装→面板安装（安装灯具）→板缝处理→吊杆安装",{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":429,"options":430,"answer":20,"analysis":33},1277721,"装饰节点详图的比例常采用1:1、1:2、1:5、1:10,其中比例为( )的详图又称为足尺图。",[431,432,433,435],{"key":20,"text":231,"correct":29},{"key":24,"text":233,"correct":22},{"key":27,"text":434,"correct":22},"1:5",{"key":31,"text":436,"correct":22},"1:10",{"id":438,"libraryId":5,"type":15,"typeLabel":16,"stem":439,"options":440,"answer":31,"analysis":33},1277722,"( )是将两个或多个装饰面的交汇点或构造的连接部位,按垂直和水平方向剖开,并以较大比例绘出的详图。",[441,443,445,447],{"key":20,"text":442,"correct":22},"装饰详图",{"key":24,"text":444,"correct":22},"功能房间大样图",{"key":27,"text":446,"correct":22},"装饰构配件详图",{"key":31,"text":448,"correct":29},"装饰节点详图",{"id":450,"libraryId":5,"type":15,"typeLabel":16,"stem":451,"options":452,"answer":31,"analysis":33},1277723,"为了表示室内立面图在装饰平面布置图中的位置,应在平面布置图上用内视符号注明视点位置、方向及立面编号。立面编号宜用( )。",[453,455,457,459],{"key":20,"text":454,"correct":22},"希腊字母",{"key":24,"text":456,"correct":22},"拉丁字母",{"key":27,"text":458,"correct":22},"阿拉伯数字",{"key":31,"text":460,"correct":29},"拉丁字母或阿拉伯数字",{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":24,"analysis":33},1277724,"在总平面图中注写到小数点后( )位。",[465,467,469],{"key":20,"text":466,"correct":22},"一",{"key":24,"text":468,"correct":29},"二",{"key":27,"text":470,"correct":22},"三",{"id":472,"libraryId":5,"type":15,"typeLabel":16,"stem":473,"options":474,"answer":27,"analysis":33},1277725,"在施工图中一般注写到小数点后( )位即可。",[475,476,477,478],{"key":20,"text":466,"correct":22},{"key":24,"text":468,"correct":22},{"key":27,"text":470,"correct":29},{"key":31,"text":479,"correct":22},"四",{"id":481,"libraryId":5,"type":15,"typeLabel":16,"stem":482,"options":483,"answer":24,"analysis":33},1277726,"一般以建筑物底层室内地面作为相对标高的零点;我国把( )海平面作为零点所测定的高度尺寸称为绝对标高。",[484,486,488,490],{"key":20,"text":485,"correct":22},"南海",{"key":24,"text":487,"correct":29},"黄海",{"key":27,"text":489,"correct":22},"威海",{"key":31,"text":491,"correct":22},"渤海",{"id":493,"libraryId":5,"type":15,"typeLabel":16,"stem":494,"options":495,"answer":27,"analysis":33},1277727,"中空玻璃是将两片或多片平板玻璃相互间隔( )mm镶于边框中.且四周加以密封,间隔空腔中充填干燥空气或惰性气体,也可在框底放置干燥剂。",[496,498,499,501],{"key":20,"text":497,"correct":22},"8",{"key":24,"text":378,"correct":22},{"key":27,"text":500,"correct":29},"12",{"key":31,"text":380,"correct":22},{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":27,"analysis":33},1277728,"根据国家标准《陶瓷砖》GB\u002FT4100的规定,陶瓷砖按吸水具体分类标准为:Ⅲ类为高吸水率砖,E>( )。",[506,507,508,509],{"key":20,"text":203,"correct":22},{"key":24,"text":205,"correct":22},{"key":27,"text":207,"correct":29},{"key":31,"text":209,"correct":22},{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":27,"analysis":33},1277729,"根据国家标准《陶瓷砖》GB\u002FT4100的规定,陶瓷砖按吸水具体分类标准为:Ⅰ类为低吸水率砖,E≤( )。",[514,516,518,520],{"key":20,"text":515,"correct":22},"1%",{"key":24,"text":517,"correct":22},"2%",{"key":27,"text":519,"correct":29},"3%",{"key":31,"text":203,"correct":22},{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":20,"analysis":33},1277730,"天然大理石质地较密实、( )较高、吸水率低。",[525,527,529,531],{"key":20,"text":526,"correct":29},"抗压强度",{"key":24,"text":528,"correct":22},"抗折强度",{"key":27,"text":530,"correct":22},"抗弯强度",{"key":31,"text":532,"correct":22},"抗风化性能",{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":27,"analysis":33},1277731,"下列关于抹面砂浆分类及应用的说法巾.错误的是( )。",[537,539,541,543],{"key":20,"text":538,"correct":22},"常用的普通抹面砂浆有水泥砂浆、水泥石灰砂浆、水泥粉煤灰砂浆、掺塑化剂水泥砂浆、聚合物水泥砂浆、石膏砂浆",{"key":24,"text":540,"correct":22},"为了保证抹灰表面的平整,避免开裂和脱落,抹面砂浆通常分为底层、中层和面层",{"key":27,"text":542,"correct":29},"装饰砂浆与普通抹面砂浆的主要区别在中层和面层",{"key":31,"text":544,"correct":22},"装饰砂浆常用的胶凝材料有白水泥和彩色水泥.以及石灰、石膏等",{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":31,"analysis":33},1277732,"按用途和性能对水泥的分类中,下列哪项是不对的( )。",[549,551,553,555],{"key":20,"text":550,"correct":22},"通用水泥",{"key":24,"text":552,"correct":22},"专用水泥",{"key":27,"text":554,"correct":22},"特性水泥",{"key":31,"text":556,"correct":29},"多用水泥",{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":31,"analysis":33},1277733,"2013年1月,甲建筑材料公司聘请王某担任推销员,但2013年3月.南于王某怀孕,身体健康状况欠佳,未能完成任务,为此.公司按合同的约定扣减工资,只发生活费,其后,又有两个月均未能完成承包任务,因此,甲公司作出解除与王某的劳动合同。下列选项中表述正确的是( )。",[561,563,565,567],{"key":20,"text":562,"correct":22},"由于在试用期内,甲公司可以随时解除劳动合同",{"key":24,"text":564,"correct":22},"由于王某不能胜任工作,甲公司应提前30日通知王某,解除劳动合同",{"key":27,"text":566,"correct":22},"甲公司可以支付王某一个月工资后解除劳动合同",{"key":31,"text":568,"correct":29},"由于王某在怀孕期间,所以甲公司不能解除劳动合同",{"id":570,"libraryId":5,"type":15,"typeLabel":16,"stem":571,"options":572,"answer":31,"analysis":33},1277734,"按照《劳动合同法》的规定,在下列选项中,用人单位提前30天以书面形式通知劳动者本人或额外支付1个月工资后可以解除劳动合同的情形是( )。",[573,575,577,579],{"key":20,"text":574,"correct":22},"劳动者患病或非因公负伤在规定的医疗期满后不能胜任原工作的",{"key":24,"text":576,"correct":22},"劳动者试用期间被证明不符合录用条件的",{"key":27,"text":578,"correct":22},"劳动者被依法追究刑事责任的",{"key":31,"text":580,"correct":29},"劳动者不能胜任工作,经培训或调整岗位仍不能胜任工作的",[582,585,588,591,594,597],{"id":15,"name":583,"category":7,"favorite":584},"领导干部任职前廉政法规知识测试题",92,{"id":586,"name":587,"category":7,"favorite":15},595,"建筑结构与设备",{"id":589,"name":590,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":592,"name":593,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":595,"name":596,"category":7,"favorite":8},534,"BIM工程师",{"id":598,"name":596,"category":7,"favorite":8},535]