[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1277888":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1277888,868,2,"多选题","装饰施工图编排顺序的原则是( )。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","表现性图样在前,技术性图样在后",true,{"key":16,"text":17,"correct":14},"B","装饰施工图在前,配套设备施工图在后",{"key":19,"text":20,"correct":14},"C","基本图在前,详图在后",{"key":22,"text":23,"correct":14},"D","先施工的在前,后施工的在后",{"key":25,"text":26,"correct":27},"E","建筑施工图在前,装饰施工图在后",false,"ABCD","",{"id":6,"name":31,"category":32,"favorite":33},"装饰方向-通用基础","建筑工程",0]