[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-867-6":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":711},{"id":5,"name":6,"category":7,"favorite":8},867,"装饰方向-岗位技能","建筑工程",0,6,50,396,[13,38,53,68,82,97,112,127,140,154,171,185,200,214,227,240,255,269,284,296,309,324,338,353,368,383,395,409,423,437,451,465,479,493,508,522,536,550,564,578,591,605,619,632,646,661,675,689,699,705],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1277338,2,"多选题","室内防水工程的施工质量控制点( )。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","基层应清理干净,抹灰前要浇水湿润,注意砂浆配合比,使底层砂浆与楼板粘结牢固",false,{"key":24,"text":25,"correct":26},"B","厕浴间的基层（找平层）可采用1:3水泥砂浆找平,厚度20mm抹平压光、坚实平整,不起砂,要求基本干燥",true,{"key":28,"text":29,"correct":26},"C","浴室墙面的防水层不得低于1800mm",{"key":31,"text":32,"correct":22},"D","玻纤布的接槎应顺流水方向搭接,搭接宽度应不小于200mm,两层以上玻纤布的防水施工,上、下搭接应错开幅宽的二分之一",{"key":34,"text":35,"correct":26},"E","在墙面和地面相交的阴角处,出地面管道根部和地漏周围,应先做防水附加层","BCE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1277339,"要做好施工质量控制点的事前质量预控工作,包括( )。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"施工单位使用合格的建筑材料、建筑构配件和设备",{"key":24,"text":45,"correct":26},"明确质量控制的目标与控制参数",{"key":28,"text":47,"correct":26},"编制作业指导书和质量控制措施",{"key":31,"text":49,"correct":26},"确定质量检查检验方式及抽样的数量与方法",{"key":34,"text":51,"correct":26},"明确检查结果的判断标准及质量记录与信息反馈要求","BCDE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1277340,"设定质量控制点,质量控制的目标及工作重点是( )。",[57,59,61,63,65],{"key":20,"text":58,"correct":26},"要做好施工质量控制点的事前质量预控工作",{"key":24,"text":60,"correct":22},"产品质量不稳定和不合格率较高的工序应列为重点,认真分析,严格控制",{"key":28,"text":62,"correct":26},"要做好施工质量控制点的动态设置和动态跟踪管理",{"key":31,"text":64,"correct":22},"对施工现场存在的重大安全隐患未向建设主管部门报告",{"key":34,"text":66,"correct":26},"要向施工作业班组进行认真交底,使每一个控制点上的作业人员明白作业规程及质量检验评定标准,掌握施工操作要领","ACE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":81,"analysis":37},1277341,"质量控制点的重点控制对象包括( )。",[72,74,76,78,80],{"key":20,"text":73,"correct":26},"材料的质量与性能",{"key":24,"text":75,"correct":26},"施工方法与关键操作",{"key":28,"text":77,"correct":26},"易发生或常见的质量通病",{"key":31,"text":79,"correct":26},"新技术、新材料及新工艺的应用",{"key":34,"text":60,"correct":26},"ABCDE",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":96,"analysis":37},1277343,"质量控制点应选择那些( )的对象进行设置。",[86,88,90,92,94],{"key":20,"text":87,"correct":26},"技术要求高",{"key":24,"text":89,"correct":22},"施工工作量大",{"key":28,"text":91,"correct":26},"施工难度大",{"key":31,"text":93,"correct":26},"对工程质量影响大",{"key":34,"text":95,"correct":26},"发生质量问题时危害大","ACDE",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":111,"analysis":37},1277344,"施工成品形成后可采取( )等相应措施进行保护。",[101,103,105,107,109],{"key":20,"text":102,"correct":26},"防护",{"key":24,"text":104,"correct":26},"覆盖",{"key":28,"text":106,"correct":26},"封闭",{"key":31,"text":108,"correct":26},"包裹",{"key":34,"text":110,"correct":22},"保温","ABCD",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":126,"analysis":37},1277345,"为了保证建设工程质量,我国规定对工程所使用的主要材料、半成品、构配件以及施工过程留置的试块、试件等应实行现场见证取样送检。( ),包括取样见证记录、样本编号、填单、封箱、送试验室、核对、交接、试验检测、报告等。",[116,118,120,122,124],{"key":20,"text":117,"correct":26},"见证人员南建设单位及工程监理机构中有相关专业知识的人员担任",{"key":24,"text":119,"correct":26},"送检的试验室应具备经国家或地方工程检验检测主管部门核准的相关资质",{"key":28,"text":121,"correct":26},"见证取样送检必须严格按执行规定的程序进行",{"key":31,"text":123,"correct":22},"改变建筑节点构造、管线位置或走向",{"key":34,"text":125,"correct":22},"见证人员必须持证上岗","ABC",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":111,"analysis":37},1277346,"在建设工程项目施工过程中,因( )等,需要通过设计单位明确或确认的,施工方必须以技术核定单的方式向监理工程师提出,报送设计单位核准确认。",[131,133,135,137,138],{"key":20,"text":132,"correct":26},"施工方对施工图纸的某些要求不甚明白",{"key":24,"text":134,"correct":26},"图纸内部存在某些矛盾",{"key":28,"text":136,"correct":26},"工程材料调整与代用",{"key":31,"text":123,"correct":26},{"key":34,"text":139,"correct":22},"施工单位人员调整问题",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":126,"analysis":37},1277347,"( )及政府的工程质量监督部门,在施工阶段依据法律法规和工程施工承包合同,对施工单位的质量行为和质量状况实施监督控制。",[144,146,148,150,152],{"key":20,"text":145,"correct":26},"建设单位",{"key":24,"text":147,"correct":26},"监理单位",{"key":28,"text":149,"correct":26},"设计单位",{"key":31,"text":151,"correct":22},"事业单位",{"key":34,"text":153,"correct":22},"施工单位",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":81,"analysis":37},1277348,"现场质量检查的内容包括( )。",[158,160,162,164,166,168],{"key":20,"text":159,"correct":26},"开工前的检查,主要检查是否具备开工条件,开工后是否能连续正常施工,能否保证工程质量",{"key":24,"text":161,"correct":26},"工序交接检查,对于重要的]二序或对工程质量有重大影响的工序,应严格执行",{"key":28,"text":163,"correct":26},"检”制度（即自检、互检、专检）,未经监理工程师（或建设单位项目技术负责人）检查认可,不得进行下道工序施工",{"key":31,"text":165,"correct":26},"隐蔽工程的检查,施工中凡是隐蔽工程必须检查认证后方可进行隐蔽掩盖",{"key":34,"text":167,"correct":26},"停工后复工的检查。因客观因素停丁或处理质量事故等停工复工时,经检查认可后方能复工",{"key":169,"text":170,"correct":22},"F","分项、分部丁程完工后的检查,应经检查认可,并签署验收记录后,才能进行下一工序的施工",{"id":172,"libraryId":5,"type":15,"typeLabel":16,"stem":173,"options":174,"answer":111,"analysis":37},1277349,"施工工程质量自控的要求是( )。",[175,177,179,181,183],{"key":20,"text":176,"correct":26},"预防为主",{"key":24,"text":178,"correct":26},"重点控制",{"key":28,"text":180,"correct":26},"坚持标准",{"key":31,"text":182,"correct":26},"记录完整",{"key":34,"text":184,"correct":22},"保证安全",{"id":186,"libraryId":5,"type":15,"typeLabel":16,"stem":187,"options":188,"answer":199,"analysis":37},1277350,"施工作业质量的自控过程是由施工作业组织的成员进行的.其基本的控制程序包括( )。",[189,191,193,195,197],{"key":20,"text":190,"correct":26},"作业技术交底、作业活动的实施",{"key":24,"text":192,"correct":26},"作业质量的自检自查、互检互查",{"key":28,"text":194,"correct":22},"对建筑材料、建筑构配件和设备进行检验",{"key":31,"text":196,"correct":22},"硅酮结构胶相容性检测",{"key":34,"text":198,"correct":26},"专职管理人员的质量检查","ABE",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":36,"analysis":37},1277351,"我国《建筑法》和《建设工程质量管理条例》规定:建筑施工企业对工程的施工质量负责,建筑施工企业必须按照( ),对建筑材料、建筑构配件和设备进行检验,不合格的不得使用。",[204,206,208,210,212],{"key":20,"text":205,"correct":22},"市场多需建筑",{"key":24,"text":207,"correct":26},"工程设计要求",{"key":28,"text":209,"correct":26},"施工技术标准",{"key":31,"text":211,"correct":22},"监理单位的要求",{"key":34,"text":213,"correct":26},"合同的约定",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":81,"analysis":37},1277352,"按有关施工验收规范规定,在装饰装修工程中,幕墙工程的下列工序质量必须进行现场质量检测,合格后才能进行下道工序( )。",[218,220,222,224,226],{"key":20,"text":219,"correct":26},"铝塑复合板的剥离强度检验",{"key":24,"text":221,"correct":26},"石材的弯曲强度、室内用花岗石的放射性检测、寒冷地区石材的耐冻性",{"key":28,"text":223,"correct":26},"玻璃幕墙用结构胶的邵氏硬度、标准条件拉伸粘结强度、石材用密封胶的污染性检测",{"key":31,"text":225,"correct":26},"建筑幕墙的气密性、水密性、风压变形性能、层间变位性能检测",{"key":34,"text":196,"correct":26},{"id":228,"libraryId":5,"type":15,"typeLabel":16,"stem":229,"options":230,"answer":239,"analysis":37},1277353,"工序是( )对工程质量综合起作用的过程,所以对施工过程的质量控制,必须以工序作业质量控制为基础和核心。",[231,233,235,237],{"key":20,"text":232,"correct":26},"人、材料",{"key":24,"text":234,"correct":26},"机械设备、施工方法",{"key":28,"text":236,"correct":22},"施工工艺、人员调度、社会因素和环境因素",{"key":31,"text":238,"correct":22},"自然因素","AB",{"id":241,"libraryId":5,"type":15,"typeLabel":16,"stem":242,"options":243,"answer":254,"analysis":37},1277354,"根据《建筑工程施工质量验收统一标准》GB50300-2001的规定,建筑工程质量验收应逐级划分为( )。",[244,246,248,250,252],{"key":20,"text":245,"correct":22},"配置必要的计量人员",{"key":24,"text":247,"correct":26},"单位（子单位）工程",{"key":28,"text":249,"correct":26},"分部（子分部）工程",{"key":31,"text":251,"correct":26},"分项工程和检验批",{"key":34,"text":253,"correct":22},"审核相关质量文件","BCD",{"id":256,"libraryId":5,"type":15,"typeLabel":16,"stem":257,"options":258,"answer":111,"analysis":37},1277355,"计量控制开工前要( )。",[259,261,263,265,267],{"key":20,"text":260,"correct":26},"建立和完善施工现场计量管理的规章制度",{"key":24,"text":262,"correct":26},"明确计量控制责任者和配置必要的计量人员",{"key":28,"text":264,"correct":26},"严格按规定对计量器具进行维修和校验",{"key":31,"text":266,"correct":26},"统一计量单位,组织量值传递,保证量值统一,从而保证施工过程中计量的准确",{"key":34,"text":268,"correct":22},"进行工程项目检查验收的项目划分和编号",{"id":270,"libraryId":5,"type":15,"typeLabel":16,"stem":271,"options":272,"answer":283,"analysis":37},1277356,"现场施工准备工作的质量控制包括( )。",[273,275,277,279,281],{"key":20,"text":274,"correct":26},"计量控制",{"key":24,"text":276,"correct":26},"测量控制",{"key":28,"text":278,"correct":22},"工程质量控制",{"key":31,"text":280,"correct":26},"施工平面图控制",{"key":34,"text":282,"correct":26},"工程质量检查验收的划分项目","ABDE",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":81,"analysis":37},1277357,"施工技术准备包括( )。",[288,290,292,293,294],{"key":20,"text":289,"correct":26},"熟悉施工图",{"key":24,"text":291,"correct":26},"组织设计交底和图纸审查",{"key":28,"text":268,"correct":26},{"key":31,"text":253,"correct":26},{"key":34,"text":295,"correct":26},"细化施工技术方案和施工人员、机具的配置方案",{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":36,"analysis":37},1277358,"事后控制包括( )。",[300,302,304,306,307],{"key":20,"text":301,"correct":22},"明示或者暗示施工单位使用不合格的建筑材料、建筑构配件和设备",{"key":24,"text":303,"correct":26},"对质量活动结果的评价、认定",{"key":28,"text":305,"correct":26},"对工序质量偏差的纠正",{"key":31,"text":64,"correct":22},{"key":34,"text":308,"correct":26},"对不合格产品进行整改和处理",{"id":310,"libraryId":5,"type":15,"typeLabel":16,"stem":311,"options":312,"answer":323,"analysis":37},1277359,"事中质量控制也称作业活动过程质量控制,包括( )。",[313,315,317,319,321],{"key":20,"text":314,"correct":22},"控制质量的自我控制",{"key":24,"text":316,"correct":26},"质量活动主体的自我控制",{"key":28,"text":318,"correct":22},"由监督部门控制",{"key":31,"text":320,"correct":26},"他人监控的控制方式",{"key":34,"text":322,"correct":22},"控制工作质量","BD",{"id":325,"libraryId":5,"type":15,"typeLabel":16,"stem":326,"options":327,"answer":81,"analysis":37},1277360,"在正式施工前进行的事前主动质量控制,通过( ),分析可能导致质量目标偏离的各种影响因素,针对这些影响因素制订有效的预防措施,防患于未然。",[328,330,332,334,336],{"key":20,"text":329,"correct":26},"编制施工质量计划",{"key":24,"text":331,"correct":26},"明确质量目标",{"key":28,"text":333,"correct":26},"制订施工方案",{"key":31,"text":335,"correct":26},"设置质量管理点",{"key":34,"text":337,"correct":26},"落实质量责任",{"id":339,"libraryId":5,"type":15,"typeLabel":16,"stem":340,"options":341,"answer":352,"analysis":37},1277361,"影响建设工程项目质量的社会因素.表现在( )。",[342,344,346,348,350],{"key":20,"text":343,"correct":26},"建设法律法规的健全程度及其执法力度",{"key":24,"text":345,"correct":26},"建设工程项目法人或业主的理性化程度",{"key":28,"text":347,"correct":22},"建设工程项目的进度",{"key":31,"text":349,"correct":26},"建设工程经营者的经营理念",{"key":34,"text":351,"correct":22},"施工单位的安全意识","ABD",{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":367,"analysis":37},1277362,"( )条件的认识与把握,是保证建设工程项目质量的重要工作环节。",[357,359,361,363,365],{"key":20,"text":358,"correct":26},"自然环境",{"key":24,"text":360,"correct":22},"社会环境",{"key":28,"text":362,"correct":22},"家庭环境",{"key":31,"text":364,"correct":26},"劳动作业环境",{"key":34,"text":366,"correct":26},"管理环境","ADE",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":382,"analysis":37},1277363,"实践证明,( )所形成的合格而无用途的建筑产品,从根本上是社会资源的极大浪费,不具备质量的适用性特征。",[372,374,376,378,380],{"key":20,"text":373,"correct":26},"没有经过资源论证、市场需求预测",{"key":24,"text":375,"correct":22},"由国家统一规划建设",{"key":28,"text":377,"correct":26},"重复建设",{"key":31,"text":379,"correct":26},"建成后不能投入生产使用",{"key":34,"text":381,"correct":22},"建设后归国有企业所有","ACD",{"id":384,"libraryId":5,"type":15,"typeLabel":16,"stem":385,"options":386,"answer":126,"analysis":37},1277364,"对于具体的建设项目,主要通过( )对建设工程项目质量起保证作用。",[387,389,391,393],{"key":20,"text":388,"correct":26},"技术工作的组织与管理",{"key":24,"text":390,"correct":26},"优化技术方案",{"key":28,"text":392,"correct":26},"发挥技术因素技术的引进",{"key":31,"text":394,"correct":22},"项目优化",{"id":396,"libraryId":5,"type":15,"typeLabel":16,"stem":397,"options":398,"answer":81,"analysis":37},1277365,"《建筑法》和《建设工程质量管理条例》还对建设工程的质量责任制度作出了明确规定,按资质等级承包工程任务( )。",[399,401,403,405,407],{"key":20,"text":400,"correct":26},"不得越级",{"key":24,"text":402,"correct":26},"不得挂靠",{"key":28,"text":404,"correct":26},"不得转包",{"key":31,"text":406,"correct":26},"严禁无证设计",{"key":34,"text":408,"correct":26},"严禁无证施工",{"id":410,"libraryId":5,"type":15,"typeLabel":16,"stem":411,"options":412,"answer":126,"analysis":37},1277366,"建设工程项目的施工质量计划,应在( )等方面,形成一个有机的质量计划系统,确保实现项目质量总目标和各分解目标的控制能力。",[413,415,417,419,421],{"key":20,"text":414,"correct":26},"控制组织,控制方式",{"key":24,"text":416,"correct":26},"施工程序,控制组织",{"key":28,"text":418,"correct":26},"控制措施,控制方式",{"key":31,"text":420,"correct":22},"控制组织,施工方式",{"key":34,"text":422,"correct":22},"施工方式,施工组织",{"id":424,"libraryId":5,"type":15,"typeLabel":16,"stem":425,"options":426,"answer":283,"analysis":37},1277367,"施工质量计划的主要内容包括( )。",[427,429,431,433,435],{"key":20,"text":428,"correct":26},"质量总目标及其分解目标",{"key":24,"text":430,"correct":26},"确定施工工艺与操作方法的技术方案和施工组织方案",{"key":28,"text":432,"correct":22},"对发现的安全生产违章违规行为或安全隐患,应予以纠正或作出处理决定",{"key":31,"text":434,"correct":26},"施工质量检验、检测、试验工作的计划安排及其实施方法与接收准则",{"key":34,"text":436,"correct":26},"质量记录的要求",{"id":438,"libraryId":5,"type":15,"typeLabel":16,"stem":439,"options":440,"answer":367,"analysis":37},1277368,"对于每一个过程作出恰当的考虑与安排,更加有效地使用资源、降低成本、缩短周期,通过控制活动进行改进,应采取的措施是( )。",[441,443,445,447,449],{"key":20,"text":442,"correct":26},"为了取得预期的结果,系统地识别所有活动",{"key":24,"text":444,"correct":22},"建立一个最佳效果和最高效率的体系",{"key":28,"text":446,"correct":22},"理解体系内部过程的相互依赖关系",{"key":31,"text":448,"correct":26},"明确管理活动的职责和权限",{"key":34,"text":450,"correct":26},"分析和测量关键活动的能力",{"id":452,"libraryId":5,"type":15,"typeLabel":16,"stem":453,"options":454,"answer":52,"analysis":37},1277369,"运用领导作用原则包括( )。",[455,457,459,461,463],{"key":20,"text":456,"correct":22},"要让每个员工了解自身贡献的重要性",{"key":24,"text":458,"correct":26},"要考虑所有相关方的需求和期望,同时在组织内部沟通,为满足所有相关方需求奠定基础",{"key":28,"text":460,"correct":26},"要确定富有挑战性的目标,要建立未来发展的蓝图",{"key":31,"text":462,"correct":26},"建立价值共享、公平公正和道德伦理概念,重视人才,创造良好的人际关系,将员工的发展方向统一到组织的方针目标上",{"key":34,"text":464,"correct":26},"为员工提供所需的资源和培训,并赋予其职责范围的自主权",{"id":466,"libraryId":5,"type":15,"typeLabel":16,"stem":467,"options":468,"answer":126,"analysis":37},1277370,"以顾客为关注焦点的原则主要包括哪些内容( )。",[469,471,473,475,477],{"key":20,"text":470,"correct":26},"要调查识别并处理顾客的需求和期望,还要使企业的目标与顾客的需求和期望相结合",{"key":24,"text":472,"correct":26},"要在组织内部沟通,确定全体员工都能理解顾客的需求和期望,并努力实现这些需求和期望",{"key":28,"text":474,"correct":26},"要预测顾客的满意程度,根据预测采取相应的措施和活动",{"key":31,"text":476,"correct":22},"系统地管理好与顾客的关系,良好的关系有助于保持顾客的忠诚,提高顾客的满意程度",{"key":34,"text":478,"correct":22},"顾客的一切需求应尽量满足,不应给顾客造成不良影响",{"id":480,"libraryId":5,"type":15,"typeLabel":16,"stem":481,"options":482,"answer":382,"analysis":37},1277371,"ISO9000质量管理的基本要求有( )。",[483,485,487,489,491],{"key":20,"text":484,"correct":26},"施工企业应结合自身特点和质量管理需要,建立质量管理体系并形成文件",{"key":24,"text":486,"correct":22},"施工企业应有效贯彻国家规范",{"key":28,"text":488,"correct":26},"施工企业应对质量管理中的各项活动进行策划",{"key":31,"text":490,"correct":26},"施工企业应检查、分析、改进质量管理活动的过程和结果",{"key":34,"text":492,"correct":22},"施工企业应不断改造创新",{"id":494,"libraryId":5,"type":15,"typeLabel":16,"stem":495,"options":496,"answer":507,"analysis":37},1277372,"新版GB\u002FT19001--2008标准为帮助企业有效贯彻标准要求,给出了哪四种类型的条款( )。",[497,499,501,503,505],{"key":20,"text":498,"correct":26},"必要时",{"key":24,"text":500,"correct":26},"适用时",{"key":28,"text":502,"correct":26},"适当时",{"key":31,"text":504,"correct":22},"现行时",{"key":34,"text":506,"correct":26},"根据实际情况决定控制的类型和程度","ABCE",{"id":509,"libraryId":5,"type":15,"typeLabel":16,"stem":510,"options":511,"answer":199,"analysis":37},1277373,"GB\u002FT19000-2000族核心标准由下列哪些组成( )。",[512,514,516,518,520],{"key":20,"text":513,"correct":26},"GB\u002FT19000-2000质量管理体系一基础和术语",{"key":24,"text":515,"correct":26},"GB\u002FT19001-2000质量管理体系要求",{"key":28,"text":517,"correct":22},"GB\u002FT19002-2000质量管理体系基础和要求",{"key":31,"text":519,"correct":22},"GB\u002FT19003-2000质量管理体系质量和环境审核指南",{"key":34,"text":521,"correct":26},"GB\u002FT19004-2000质量管理体系一业绩改进指南",{"id":523,"libraryId":5,"type":15,"typeLabel":16,"stem":524,"options":525,"answer":81,"analysis":37},1277374,"建设工程质量的特性主要表现在( )。",[526,528,530,532,534],{"key":20,"text":527,"correct":26},"适用性",{"key":24,"text":529,"correct":26},"耐久性",{"key":28,"text":531,"correct":26},"安全性",{"key":31,"text":533,"correct":26},"可靠性",{"key":34,"text":535,"correct":26},"经济性",{"id":537,"libraryId":5,"type":15,"typeLabel":16,"stem":538,"options":539,"answer":254,"analysis":37},1277375,"工程项目质量管理的特点有( )。",[540,542,544,546,548],{"key":20,"text":541,"correct":22},"工程项目的质量特性较少",{"key":24,"text":543,"correct":26},"工程项目形体庞大,高投入,周期长,牵涉面广,具有风险性",{"key":28,"text":545,"correct":26},"影响工程项目的质量因素较多",{"key":31,"text":547,"correct":26},"工程项目质量管理难度较大",{"key":34,"text":549,"correct":22},"工程项目质量具有可视性",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":81,"analysis":37},1277376,"建筑节能分部工程质量验收合格,应符合下列哪些规定( )。",[554,556,558,560,562],{"key":20,"text":555,"correct":26},"分项工程应全部合格",{"key":24,"text":557,"correct":26},"质量控制资料应完整",{"key":28,"text":559,"correct":26},"外墙节能构造现场实体检验结果应符合设计要求",{"key":31,"text":561,"correct":26},"严寒、寒冷和夏热冬冷地区的外窗气密性现场实体检验结果应合格",{"key":34,"text":563,"correct":26},"建筑设备工程系统节能性能检测结果应合格",{"id":565,"libraryId":5,"type":15,"typeLabel":16,"stem":566,"options":567,"answer":254,"analysis":37},1277377,"《建筑节能工程施工质量验收规范》GB50411-2007的强制性条文中,墙体节能工程的施工应符合下列哪些规定( )。",[568,570,572,574,576],{"key":20,"text":569,"correct":22},"保温浆料待结构成型后统一施工",{"key":24,"text":571,"correct":26},"保温隔热材料的厚度必须符合设计要求",{"key":28,"text":573,"correct":26},"保温板与基层及各构层之间的粘结或连接必须牢同",{"key":31,"text":575,"correct":26},"当墙体节能工程的保温层采取预埋或后置锚固件同定时,锚固件数量、位置、锚同深度和拉拔力应符合设计要求",{"key":34,"text":577,"correct":22},"各种设备、总控阀门与仪表应按设计要求安装齐全,不得随意增减和更换",{"id":579,"libraryId":5,"type":15,"typeLabel":16,"stem":580,"options":581,"answer":352,"analysis":37},1277378,"《建筑节能工程施工质量验收规范》GB50411-2007的强制性条文中,采暖系统的安装应符合下列哪些规定( )。",[582,584,586,588,590],{"key":20,"text":583,"correct":26},"采暖系统的制式,应符合设计要求",{"key":24,"text":585,"correct":26},"散热设备、阀门、过滤器、温度计及仪表应按设计要求安装齐全,不得随意增减和更换",{"key":28,"text":587,"correct":22},"保温材料应分层施工",{"key":31,"text":589,"correct":26},"室内温度调整控制、热计量装置、水力平衡装置以及热力人口设置的安装位置和方向应符合设计要求,并便于观察、操作和调试",{"key":34,"text":577,"correct":22},{"id":592,"libraryId":5,"type":15,"typeLabel":16,"stem":593,"options":594,"answer":111,"analysis":37},1277379,"民用建筑工程室内装修时,严禁使用( )作为稀释剂和溶剂。",[595,597,599,601,603],{"key":20,"text":596,"correct":26},"苯",{"key":24,"text":598,"correct":26},"工业苯",{"key":28,"text":600,"correct":26},"石油苯",{"key":31,"text":602,"correct":26},"重质苯",{"key":34,"text":604,"correct":22},"水",{"id":606,"libraryId":5,"type":15,"typeLabel":16,"stem":607,"options":608,"answer":96,"analysis":37},1277380,"《屋面工程质量验收规范》GB50207-2012的强制性文件中,保温材料的( )必须符合设计要求。",[609,611,613,615,617],{"key":20,"text":610,"correct":26},"导热系数",{"key":24,"text":612,"correct":22},"刚度系数",{"key":28,"text":614,"correct":26},"表观密度或干密度",{"key":31,"text":616,"correct":26},"抗压强度或压缩强度",{"key":34,"text":618,"correct":26},"燃烧性能",{"id":620,"libraryId":5,"type":15,"typeLabel":16,"stem":621,"options":622,"answer":507,"analysis":37},1277381,"单位（子单位）工程质量验收合格应符合下列哪些规定( )。",[623,625,626,628,630],{"key":20,"text":624,"correct":26},"单位（子单位）工程所含部分（子分部）工程的质量均应验收合格",{"key":24,"text":557,"correct":26},{"key":28,"text":627,"correct":26},"单位（子单位）工程所含分部工程有关安全和功能的检测资料应完整",{"key":31,"text":629,"correct":22},"主要功能项目的调查结果部分符合相关专业质量验收规范的规定",{"key":34,"text":631,"correct":26},"观感质量验收应符合要求",{"id":633,"libraryId":5,"type":15,"typeLabel":16,"stem":634,"options":635,"answer":81,"analysis":37},1277382,"根据《建设工程质量检测管理办法》（中华人民共和国建设部令第141号）,见证取样检测包括( )。",[636,638,640,642,644],{"key":20,"text":637,"correct":26},"水泥物理力学性能检测",{"key":24,"text":639,"correct":26},"钢筋（含焊接与机械连接）力学性能检测",{"key":28,"text":641,"correct":26},"砂、石常规检验",{"key":31,"text":643,"correct":26},"混凝土、砂浆强度检验",{"key":34,"text":645,"correct":26},"简易土工检验",{"id":647,"libraryId":5,"type":15,"typeLabel":16,"stem":648,"options":649,"answer":660,"analysis":37},1277383,"关于房屋建设工程质量保修范围、保修期限说法正确的是( )。",[650,652,654,656,658],{"key":20,"text":651,"correct":22},"房屋建筑工程保修期从工程开工之日算起",{"key":24,"text":653,"correct":26},"地基基础工程和主体结构工程,为设计文件规定的该工程的合理使用年限",{"key":28,"text":655,"correct":22},"屋面防水工程、有防水要求的卫生间、房间和外墙面的防渗漏,为3年",{"key":31,"text":657,"correct":26},"供热与供冷系统,为2个采暖期、供冷期",{"key":34,"text":659,"correct":26},"电气管线、给水排水管道、设备安装为2年;装修工程为2年;保温工程为5年","BDE",{"id":662,"libraryId":5,"type":15,"typeLabel":16,"stem":663,"options":664,"answer":111,"analysis":37},1277384,"建设单位办理工程竣工验收备案应当提交的文件有( )。",[665,667,669,671,673],{"key":20,"text":666,"correct":26},"工程竣工验收备案表",{"key":24,"text":668,"correct":26},"工程竣工验收报告",{"key":28,"text":670,"correct":26},"法律、行政法规规定应当由规划、环保等部门出具的认可文件或者准许使用文件",{"key":31,"text":672,"correct":26},"法律规定应当由公安消防部门出具的对大型的人员密集场所和其他特殊建设工程验收合格的证明文件",{"key":34,"text":674,"correct":22},"施工进度规划表",{"id":676,"libraryId":5,"type":15,"typeLabel":16,"stem":677,"options":678,"answer":239,"analysis":37},1277385,"建设单位有下列行为的责令改正,并处以20万以上及50万以下的罚款( )。",[679,681,683,685,687],{"key":20,"text":680,"correct":26},"明示或者暗示施工单位使用不合格的建筑材料、建筑构配件和设备的",{"key":24,"text":682,"correct":26},"明示或者暗示设计单位或者施工单位违反工程建设强制性标准、降低工程质量的",{"key":28,"text":684,"correct":22},"对发现的安全生产违章违规行为或安全隐患,未予以纠正或作出处理决定的",{"key":31,"text":686,"correct":22},"对施工现场存在的重大安全隐患未向建设主管部门报告的",{"key":34,"text":688,"correct":22},"明示或者暗示设计单位或者施工单位随意修改图纸的",{"id":690,"libraryId":5,"type":691,"typeLabel":692,"stem":693,"options":694,"answer":696,"analysis":37},1277386,3,"判断题","特别重大事故,是指造成30人以上死亡,或者100人以上重伤,或者1亿元以上直接经济损失的事故。",[695,697],{"key":20,"text":696,"correct":26},"正确",{"key":24,"text":698,"correct":22},"错误",{"id":700,"libraryId":5,"type":691,"typeLabel":692,"stem":701,"options":702,"answer":696,"analysis":37},1277387,"施工质量控制点的设置是施工质量计划的重要组成内容,施工质量控制点是施工质量控制的重点对象。",[703,704],{"key":20,"text":696,"correct":26},{"key":24,"text":698,"correct":22},{"id":706,"libraryId":5,"type":691,"typeLabel":692,"stem":707,"options":708,"answer":698,"analysis":37},1277388,"花饰制作与安装分项工程检验批质量检验的主控项目包括:表面质量、接缝,造型、尺寸,安装位置、固定方法。",[709,710],{"key":20,"text":696,"correct":22},{"key":24,"text":698,"correct":26},[712,716,719,722,725,728],{"id":713,"name":714,"category":7,"favorite":715},1,"领导干部任职前廉政法规知识测试题",92,{"id":717,"name":718,"category":7,"favorite":713},595,"建筑结构与设备",{"id":720,"name":721,"category":7,"favorite":713},715,"招标采购专业知识与法律法规",{"id":723,"name":724,"category":7,"favorite":713},848,"市政方向-通用基础",{"id":726,"name":727,"category":7,"favorite":8},534,"BIM工程师",{"id":729,"name":727,"category":7,"favorite":8},535]