[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-867-3":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":594},{"id":5,"name":6,"category":7,"favorite":8},867,"装饰方向-岗位技能","建筑工程",0,3,50,396,[13,34,42,54,66,78,90,102,114,126,138,147,156,168,180,192,204,216,228,240,252,264,276,288,298,310,322,333,344,356,368,380,392,404,416,424,436,448,460,472,484,496,507,515,527,539,551,563,572,582],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1277188,1,"单选题","凡属“待检点”的施工作业,施工方必须在完成施工质量白检的基础上,提前( )h通知项目监理机构进行检查验收,然后才能进行工程隐蔽或下道工序的施工。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","12",false,{"key":24,"text":25,"correct":22},"B","24",{"key":27,"text":28,"correct":29},"C","48",true,{"key":31,"text":32,"correct":22},"D","72","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},1277189,"凡属“见证点”的施工作业,施工方必须在该项作业开始前( )h,书面通知现场监理机构到位旁站,见证施工作业过程。",[38,39,40,41],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":22},{"key":27,"text":28,"correct":29},{"key":31,"text":32,"correct":22},{"id":43,"libraryId":5,"type":15,"typeLabel":16,"stem":44,"options":45,"answer":31,"analysis":33},1277190,"作业前( )做好交底和记录,使( )在明确工艺标准、质量要求的基础上进行作业。",[46,48,50,52],{"key":20,"text":47,"correct":22},"施工员、技术员施工单位",{"key":24,"text":49,"correct":22},"施工单位操作人员",{"key":27,"text":51,"correct":22},"施工单位施工员、技术员",{"key":31,"text":53,"correct":29},"施工员、技术员操作人员",{"id":55,"libraryId":5,"type":15,"typeLabel":16,"stem":56,"options":57,"answer":27,"analysis":33},1277191,"所谓( ),是指在工程开工前、设计交底和图纸会审时,可确定项目的质量控制点,随着工程的展开、施工条件的变化,随时或定期进行控制点的调整和更新。",[58,60,62,64],{"key":20,"text":59,"correct":22},"动态追踪",{"key":24,"text":61,"correct":22},"动态监测",{"key":27,"text":63,"correct":29},"动态设置",{"key":31,"text":65,"correct":22},"动态检查",{"id":67,"libraryId":5,"type":15,"typeLabel":16,"stem":68,"options":69,"answer":31,"analysis":33},1277192,"混凝土工程中易发生或常见的质量通病不包括( )。",[70,72,74,76],{"key":20,"text":71,"correct":22},"混凝土工程的蜂窝、麻面、空洞",{"key":24,"text":73,"correct":22},"墙、地面工程的渗水、漏水、空鼓",{"key":27,"text":75,"correct":22},"屋面工程起砂、裂缝",{"key":31,"text":77,"correct":29},"混凝土工程中钢筋腐蚀",{"id":79,"libraryId":5,"type":15,"typeLabel":16,"stem":80,"options":81,"answer":24,"analysis":33},1277193,"吊顶工程中对吊杆的控制,吊杆的( )及连接方式是保证吊顶质量的关键点。",[82,84,86,88],{"key":20,"text":83,"correct":22},"尺寸、位置",{"key":24,"text":85,"correct":29},"位置、间距、规格",{"key":27,"text":87,"correct":22},"大小、方向",{"key":31,"text":89,"correct":22},"抗拉、弯性能",{"id":91,"libraryId":5,"type":15,"typeLabel":16,"stem":92,"options":93,"answer":27,"analysis":33},1277194,"砌筑与抹灰之间.应在墙体砌筑后留( )d时间,让墙体充分沉降、稳定、干燥,然后再抹灰。",[94,96,98,100],{"key":20,"text":95,"correct":22},"58",{"key":24,"text":97,"correct":22},"15",{"key":27,"text":99,"correct":29},"28",{"key":31,"text":101,"correct":22},"30",{"id":103,"libraryId":5,"type":15,"typeLabel":16,"stem":104,"options":105,"answer":20,"analysis":33},1277195,"质量控制点的选择要准确,选择质量控制点的( )、重点工序和重点的质量因素作为质量控制点的控制对象。",[106,108,110,112],{"key":20,"text":107,"correct":29},"重点部位",{"key":24,"text":109,"correct":22},"裂缝处",{"key":27,"text":111,"correct":22},"接口部位",{"key":31,"text":113,"correct":22},"保温部位",{"id":115,"libraryId":5,"type":15,"typeLabel":16,"stem":116,"options":117,"answer":20,"analysis":33},1277196,"建筑工程质量控制点中,属于钢结构的是( )。",[118,120,122,124],{"key":20,"text":119,"correct":29},"翻样图、放大样",{"key":24,"text":121,"correct":22},"焊接条件、焊接工艺",{"key":27,"text":123,"correct":22},"水泥品种、强度等级",{"key":31,"text":125,"correct":22},"基坑尺寸、标高图纸、地基承载力",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":31,"analysis":33},1277197,"建筑工程质量控制点中,不属于模板的是( )。",[130,132,134,136],{"key":20,"text":131,"correct":22},"位置、标高、尺寸",{"key":24,"text":133,"correct":22},"预埋件的位置",{"key":27,"text":135,"correct":22},"预留洞孔的位置",{"key":31,"text":137,"correct":29},"基础垫层标高",{"id":139,"libraryId":5,"type":15,"typeLabel":16,"stem":140,"options":141,"answer":27,"analysis":33},1277198,"建筑工程质量控制点中,属于钢筋混凝土的是( )。",[142,144,145,146],{"key":20,"text":143,"correct":22},"预留洞孔的位置、尺寸",{"key":24,"text":133,"correct":22},{"key":27,"text":123,"correct":29},{"key":31,"text":125,"correct":22},{"id":148,"libraryId":5,"type":15,"typeLabel":16,"stem":149,"options":150,"answer":31,"analysis":33},1277199,"建筑工程质量控制点中,属于地基、基础的是( )。",[151,152,153,155],{"key":20,"text":143,"correct":22},{"key":24,"text":133,"correct":22},{"key":27,"text":154,"correct":22},"水泥品种等级",{"key":31,"text":125,"correct":29},{"id":157,"libraryId":5,"type":15,"typeLabel":16,"stem":158,"options":159,"answer":20,"analysis":33},1277200,"已完施工的成品保护问题和相应措施,在工程施工组织设计与计划阶段就应该在( )上进行考虑,防止( )不当或交叉作业造成相互干扰、污染和损坏。",[160,162,164,166],{"key":20,"text":161,"correct":29},"施工顺序施工顺序",{"key":24,"text":163,"correct":22},"施工质量施工质量",{"key":27,"text":165,"correct":22},"施工顺序施工质量",{"key":31,"text":167,"correct":22},"施工质量施工顺序",{"id":169,"libraryId":5,"type":15,"typeLabel":16,"stem":170,"options":171,"answer":24,"analysis":33},1277201,"下列哪项不属于隐蔽工程( )。",[172,174,176,178],{"key":20,"text":173,"correct":22},"基础工程",{"key":24,"text":175,"correct":29},"抹灰工程",{"key":27,"text":177,"correct":22},"钢筋工程",{"key":31,"text":179,"correct":22},"预埋管线",{"id":181,"libraryId":5,"type":15,"typeLabel":16,"stem":182,"options":183,"answer":20,"analysis":33},1277202,"试验法是指通过必要的试验手段对质量进行判断的检查方法,主要包括( )两种。",[184,186,188,190],{"key":20,"text":185,"correct":29},"理化试验和无损检测",{"key":24,"text":187,"correct":22},"物理实验和质量检测",{"key":27,"text":189,"correct":22},"理化试验和质量检测",{"key":31,"text":191,"correct":22},"物理实验和无损检测",{"id":193,"libraryId":5,"type":15,"typeLabel":16,"stem":194,"options":195,"answer":24,"analysis":33},1277203,"现场质量检查的方法不包括( )。",[196,198,200,202],{"key":20,"text":197,"correct":22},"目测法",{"key":24,"text":199,"correct":29},"假设法",{"key":27,"text":201,"correct":22},"实测法",{"key":31,"text":203,"correct":22},"试验法",{"id":205,"libraryId":5,"type":15,"typeLabel":16,"stem":206,"options":207,"answer":20,"analysis":33},1277204,"现场检测巾目测法手段的“敲”就是运用敲击工具进行音感检查,下列属于这一手段的是( )。",[208,210,212,214],{"key":20,"text":209,"correct":29},"对水磨石敲击",{"key":24,"text":211,"correct":22},"对管道井敲击",{"key":27,"text":213,"correct":22},"对设备敲击",{"key":31,"text":215,"correct":22},"设备安装",{"id":217,"libraryId":5,"type":15,"typeLabel":16,"stem":218,"options":219,"answer":20,"analysis":33},1277205,"( )是施工质量监控的主要手段。",[220,222,224,226],{"key":20,"text":221,"correct":29},"现场质量检查",{"key":24,"text":223,"correct":22},"抽样检查",{"key":27,"text":225,"correct":22},"施工进度控制",{"key":31,"text":227,"correct":22},"施工方案优化",{"id":229,"libraryId":5,"type":15,"typeLabel":16,"stem":230,"options":231,"answer":24,"analysis":33},1277206,"建设单位在领取( )或者开工报告前,应当按照国家有关规定办理工程质量监督手续。",[232,234,236,238],{"key":20,"text":233,"correct":22},"质检报告",{"key":24,"text":235,"correct":29},"施工许可证",{"key":27,"text":237,"correct":22},"施工进度表",{"key":31,"text":239,"correct":22},"财务报表",{"id":241,"libraryId":5,"type":15,"typeLabel":16,"stem":242,"options":243,"answer":31,"analysis":33},1277207,"( )及政府的工程质量监督部门,在施,工阶段依据法律法规和工程施工承包合同,不能对施工单位的质量行为和质量状况实施监督控制。",[244,246,248,250],{"key":20,"text":245,"correct":22},"建设单位",{"key":24,"text":247,"correct":22},"监理单位",{"key":27,"text":249,"correct":22},"设计单位",{"key":31,"text":251,"correct":29},"事业单位",{"id":253,"libraryId":5,"type":15,"typeLabel":16,"stem":254,"options":255,"answer":24,"analysis":33},1277208,"工序施工人员在工序施工过程中应严格进行( ),通过( )不断改进作业质量,并创造条件开展工序质量互检,通过互检加强技术与经验的交流。",[256,258,260,262],{"key":20,"text":257,"correct":22},"质量监督监督",{"key":24,"text":259,"correct":29},"质量自检自检",{"key":27,"text":261,"correct":22},"重点控制控制",{"key":31,"text":263,"correct":22},"重点预防预防",{"id":265,"libraryId":5,"type":15,"typeLabel":16,"stem":266,"options":267,"answer":31,"analysis":33},1277209,"施工( )检查是施工质量验收的基础。",[268,270,272,274],{"key":20,"text":269,"correct":22},"工程方案",{"key":24,"text":271,"correct":22},"工程进度",{"key":27,"text":273,"correct":22},"人员调度",{"key":31,"text":275,"correct":29},"工程质量",{"id":277,"libraryId":5,"type":15,"typeLabel":16,"stem":278,"options":279,"answer":20,"analysis":33},1277210,"技术交底是施工组织设计和施工方案的具体化,施工作业技术交底的内容必须具有( )。",[280,282,284,286],{"key":20,"text":281,"correct":29},"可行性和可操作性",{"key":24,"text":283,"correct":22},"适用性和可操作性",{"key":27,"text":285,"correct":22},"可行性和适用性",{"key":31,"text":287,"correct":22},"制度性和可行性",{"id":289,"libraryId":5,"type":15,"typeLabel":16,"stem":290,"options":291,"answer":24,"analysis":33},1277211,"( )作为工程施工质量的自控主体,既要遵循本企业质量管理体系的要求,也要根据其在所承建的工程项目质量控制系统中的地位和责任。",[292,293,295,296],{"key":20,"text":249,"correct":22},{"key":24,"text":294,"correct":29},"施工方",{"key":27,"text":247,"correct":22},{"key":31,"text":297,"correct":22},"管理单位",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":20,"analysis":33},1277212,"工序施工条件控制手段包括( )。",[302,304,306,308],{"key":20,"text":303,"correct":29},"检测、测试",{"key":24,"text":305,"correct":22},"分析、测算",{"key":27,"text":307,"correct":22},"归纳总结",{"key":31,"text":309,"correct":22},"设备仪器的调试",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":27,"analysis":33},1277213,"工序施工条件控制依据不包括( )。",[314,316,318,320],{"key":20,"text":315,"correct":22},"设计质量标准",{"key":24,"text":317,"correct":22},"材料质量标准",{"key":27,"text":319,"correct":29},"人员的调度",{"key":31,"text":321,"correct":22},"机械设备技术性能标准",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":20,"analysis":33},1277214,"( )是施工阶段质量控制的重点。",[326,328,330,331],{"key":20,"text":327,"correct":29},"工序的质量控制",{"key":24,"text":329,"correct":22},"材料的质量控制",{"key":27,"text":319,"correct":22},{"key":31,"text":332,"correct":22},"设备仪器的使用",{"id":334,"libraryId":5,"type":15,"typeLabel":16,"stem":335,"options":336,"answer":20,"analysis":33},1277215,"建设（监理）单位应会同( )制定严格的施工场地管理制度、施工纪律和相应的奖惩措施,严禁乱占场地和擅自断水、断电、断路,及时制止和处理各种违纪行为,并做好施工现场的质量检查记录。",[337,339,340,342],{"key":20,"text":338,"correct":29},"施工单位",{"key":24,"text":249,"correct":22},{"key":27,"text":341,"correct":22},"行政单位",{"key":31,"text":343,"correct":22},"政府单位",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":31,"analysis":33},1277216,"( )是建设工程产品南设计转化为实物的第一步。",[348,350,352,354],{"key":20,"text":349,"correct":22},"土样检测",{"key":24,"text":351,"correct":22},"坐标确定",{"key":27,"text":353,"correct":22},"试块检测",{"key":31,"text":355,"correct":29},"工程测量放线",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":20,"analysis":33},1277217,"技术准备工作的质鼍控制针对( ),明确( )的重点对象和控制方法;尽可能地提高上述工作成果对施工质量的保证程度等。",[360,362,364,366],{"key":20,"text":361,"correct":29},"质量控制点质量控制",{"key":24,"text":363,"correct":22},"管理控制点管理控制",{"key":27,"text":365,"correct":22},"质量控制点管理控制",{"key":31,"text":367,"correct":22},"管理控制点质量控制",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":24,"analysis":33},1277218,"施工技术准备是指在正式开展( )前进行的技术准备工作。",[372,374,376,378],{"key":20,"text":373,"correct":22},"质量检测",{"key":24,"text":375,"correct":29},"施工作业活动",{"key":27,"text":377,"correct":22},"进度检查",{"key":31,"text":379,"correct":22},"安全检查",{"id":381,"libraryId":5,"type":15,"typeLabel":16,"stem":382,"options":383,"answer":24,"analysis":33},1277219,"( )以使不合格的工序或最终产品（包括单位工程或整个工程项目）不流入下道工序、不进入市场。",[384,386,388,390],{"key":20,"text":385,"correct":22},"事前质量控制",{"key":24,"text":387,"correct":29},"事后质量控制",{"key":27,"text":389,"correct":22},"事中质量控制",{"key":31,"text":391,"correct":22},"全面质量控制",{"id":393,"libraryId":5,"type":15,"typeLabel":16,"stem":394,"options":395,"answer":20,"analysis":33},1277220,"控制的重点是发现( ),并通过分析提出施工质量改进的措施,保持质量处于受控状态。",[396,398,400,402],{"key":20,"text":397,"correct":29},"施工质量方面的缺陷",{"key":24,"text":399,"correct":22},"管理方面的缺陷",{"key":27,"text":401,"correct":22},"施工技术的不足",{"key":31,"text":403,"correct":22},"存在的安全隐患",{"id":405,"libraryId":5,"type":15,"typeLabel":16,"stem":406,"options":407,"answer":24,"analysis":33},1277221,"事中质量控制的关键是( )。",[408,410,412,414],{"key":20,"text":409,"correct":22},"确保工序质量合格",{"key":24,"text":411,"correct":29},"坚持质量标准",{"key":27,"text":413,"correct":22},"控制工序的质量",{"key":31,"text":415,"correct":22},"控制工作质量",{"id":417,"libraryId":5,"type":15,"typeLabel":16,"stem":418,"options":419,"answer":20,"analysis":33},1277222,"事中质量控制的目标包括( )。",[420,421,422,423],{"key":20,"text":409,"correct":29},{"key":24,"text":411,"correct":22},{"key":27,"text":413,"correct":22},{"key":31,"text":415,"correct":22},{"id":425,"libraryId":5,"type":15,"typeLabel":16,"stem":426,"options":427,"answer":20,"analysis":33},1277223,"事前质量预控要求针对质量控制对象的控制目标、( )、影响因素进行周密分析,找出薄弱环节,制订有效的控制措施和对策。",[428,430,432,434],{"key":20,"text":429,"correct":29},"活动条件",{"key":24,"text":431,"correct":22},"特殊条件",{"key":27,"text":433,"correct":22},"充分条件",{"key":31,"text":435,"correct":22},"随机条件",{"id":437,"libraryId":5,"type":15,"typeLabel":16,"stem":438,"options":439,"answer":31,"analysis":33},1277224,"施工质量控制应贯彻全面、全过程质量管理的思想,运用动态控制原理.不进行质量的( )。",[440,442,444,446],{"key":20,"text":441,"correct":22},"事中控制",{"key":24,"text":443,"correct":22},"事前控制",{"key":27,"text":445,"correct":22},"事后控制",{"key":31,"text":447,"correct":29},"随机控制",{"id":449,"libraryId":5,"type":15,"typeLabel":16,"stem":450,"options":451,"answer":20,"analysis":33},1277225,"施工质量控制应贯彻全面、全过程质量管理的思想,运用( )原理,进行质量的事前控制、事中控制和事后控制。",[452,454,456,458],{"key":20,"text":453,"correct":29},"动态控制",{"key":24,"text":455,"correct":22},"静态控制",{"key":27,"text":457,"correct":22},"自动控制",{"key":31,"text":459,"correct":22},"科技控制",{"id":461,"libraryId":5,"type":15,"typeLabel":16,"stem":462,"options":463,"answer":27,"analysis":33},1277226,"作为建设工程项目的( ).不仅要系统认识和思考以上各种因素对建设工程项目质量形成的影响及其规律,而且要分清对于建设工程项目质量控制来说,哪些是可控因素,哪些是不可控因素。",[464,466,468,470],{"key":20,"text":465,"correct":22},"施工者",{"key":24,"text":467,"correct":22},"技术人员",{"key":27,"text":469,"correct":29},"管理者",{"key":31,"text":471,"correct":22},"购买者",{"id":473,"libraryId":5,"type":15,"typeLabel":16,"stem":474,"options":475,"answer":24,"analysis":33},1277227,"对于建设工程项目管理者而言,( )、管理和环境因素,是可控因素。",[476,478,480,482],{"key":20,"text":477,"correct":22},"机器",{"key":24,"text":479,"correct":29},"人、技术",{"key":27,"text":481,"correct":22},"资金",{"key":31,"text":483,"correct":22},"施工日期",{"id":485,"libraryId":5,"type":15,"typeLabel":16,"stem":486,"options":487,"answer":20,"analysis":33},1277228,"对建设工程项目而言,不属于直接影响建设工程项目质量的管理环境为( )。",[488,490,492,494],{"key":20,"text":489,"correct":29},"施工现场的通风",{"key":24,"text":491,"correct":22},"多单位、多专业交叉协同施工的管理关系",{"key":27,"text":493,"correct":22},"组织协调方式",{"key":31,"text":495,"correct":22},"质量控制系统",{"id":497,"libraryId":5,"type":15,"typeLabel":16,"stem":498,"options":499,"answer":31,"analysis":33},1277229,"对建设工程项目而言,属于直接影响建设工程项目质量的劳动作业环境为( )。",[500,502,504,506],{"key":20,"text":501,"correct":22},"所在地点的水文",{"key":24,"text":503,"correct":22},"所在地点的地质",{"key":27,"text":505,"correct":22},"所在地点的气象",{"key":31,"text":489,"correct":29},{"id":508,"libraryId":5,"type":15,"typeLabel":16,"stem":509,"options":510,"answer":31,"analysis":33},1277230,"对建设工程项目而言,不属于直接影响建设工程项目质量的自然因素为( )。",[511,512,513,514],{"key":20,"text":501,"correct":22},{"key":24,"text":503,"correct":22},{"key":27,"text":505,"correct":22},{"key":31,"text":489,"correct":29},{"id":516,"libraryId":5,"type":15,"typeLabel":16,"stem":517,"options":518,"answer":20,"analysis":33},1277231,"任务组织是指对建设工程项目实施的任务及其目标进行( )以及对实施任务进行的计划、指挥、协调、检查和监督等一系列工作过程。",[519,521,523,525],{"key":20,"text":520,"correct":29},"分解、发包、委托",{"key":24,"text":522,"correct":22},"合并、发包、假借",{"key":27,"text":524,"correct":22},"分解、计划、指挥",{"key":31,"text":526,"correct":22},"合并、计划、协调",{"id":528,"libraryId":5,"type":15,"typeLabel":16,"stem":529,"options":530,"answer":24,"analysis":33},1277232,"鼓励因素中的组织因素,包括建设工程项目实施的( )。",[531,533,535,537],{"key":20,"text":532,"correct":22},"决策组织和任务组织",{"key":24,"text":534,"correct":29},"管理组织和任务组织",{"key":27,"text":536,"correct":22},"社会组织和管理组织",{"key":31,"text":538,"correct":22},"决策组织和社会组织",{"id":540,"libraryId":5,"type":15,"typeLabel":16,"stem":541,"options":542,"answer":20,"analysis":33},1277233,"影响建设工程项目质量的管理因素主要是( )。",[543,545,547,549],{"key":20,"text":544,"correct":29},"决策因素和组织因素",{"key":24,"text":546,"correct":22},"人为因素和社会因素",{"key":27,"text":548,"correct":22},"环境因素和社会因素",{"key":31,"text":550,"correct":22},"决策因素和人为因素",{"id":552,"libraryId":5,"type":15,"typeLabel":16,"stem":553,"options":554,"answer":24,"analysis":33},1277234,"影响建设工程项目质量的技术因素中,辅助的生产技术包括( )。",[555,557,559,561],{"key":20,"text":556,"correct":22},"工程勘察技术",{"key":24,"text":558,"correct":29},"工程检测检验技术",{"key":27,"text":560,"correct":22},"设计技术",{"key":31,"text":562,"correct":22},"施工技术",{"id":564,"libraryId":5,"type":15,"typeLabel":16,"stem":565,"options":566,"answer":24,"analysis":33},1277235,"影响建设工程项目质量的技术因素中,直接的工程技术不包括( )。",[567,568,570,571],{"key":20,"text":556,"correct":22},{"key":24,"text":569,"correct":29},"工程检测技术",{"key":27,"text":560,"correct":22},{"key":31,"text":562,"correct":22},{"id":573,"libraryId":5,"type":15,"typeLabel":16,"stem":574,"options":575,"answer":20,"analysis":33},1277236,"人的因素对建设工程项目质量形成的影响是指承担建设工程项目策划、决策或实施的建设单位、( )、咨询服务机构、工程承包企业等实体组织的质量管理体系及其管理能力。",[576,578,579,580],{"key":20,"text":577,"correct":29},"勘察设计单位",{"key":24,"text":338,"correct":22},{"key":27,"text":247,"correct":22},{"key":31,"text":581,"correct":22},"总承包单位",{"id":583,"libraryId":5,"type":15,"typeLabel":16,"stem":584,"options":585,"answer":24,"analysis":33},1277237,"人的因素对建设工程项目质量形成的影响是指直接履行建设工程项目质量职能的决策者、管理者和作业者个人的( )及质量活动能力。",[586,588,590,592],{"key":20,"text":587,"correct":22},"决策能力",{"key":24,"text":589,"correct":29},"质量意识",{"key":27,"text":591,"correct":22},"安全意识",{"key":31,"text":593,"correct":22},"大局观能力",[595,598,601,604,607,610],{"id":15,"name":596,"category":7,"favorite":597},"领导干部任职前廉政法规知识测试题",92,{"id":599,"name":600,"category":7,"favorite":15},595,"建筑结构与设备",{"id":602,"name":603,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":605,"name":606,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":608,"name":609,"category":7,"favorite":8},534,"BIM工程师",{"id":611,"name":609,"category":7,"favorite":8},535]