[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1277479":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":19},1277479,867,3,"判断题","隐蔽工程在隐蔽前应由施工单位通知有关单位进行验收,并应形成验收文件。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,"【知识点】 考察隐蔽工程验收的程序要求。 【答案解析】 正确。根据规范，隐蔽工程隐蔽前应由施工单位通知有关单位验收并形成文件，题干说法符合要求。",{"id":6,"name":21,"category":22,"favorite":23},"装饰方向-岗位技能","建筑工程",0]