[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1277460":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},1277460,867,3,"判断题","管理和作业计划:对施工体系进行准备,包括组织和安排。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"【知识点】 考察施工管理中计划与准备的区分。 【答案解析】 题干将管理和作业计划定义为对施工体系的准备，但作业计划是具体执行安排，而非准备阶段，故说法错误，正确答案为B。",{"id":6,"name":21,"category":22,"favorite":23},"装饰方向-岗位技能","建筑工程",0]