[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1277368":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1277368,867,2,"多选题","对于每一个过程作出恰当的考虑与安排,更加有效地使用资源、降低成本、缩短周期,通过控制活动进行改进,应采取的措施是( )。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","为了取得预期的结果,系统地识别所有活动",true,{"key":16,"text":17,"correct":18},"B","建立一个最佳效果和最高效率的体系",false,{"key":20,"text":21,"correct":18},"C","理解体系内部过程的相互依赖关系",{"key":23,"text":24,"correct":14},"D","明确管理活动的职责和权限",{"key":26,"text":27,"correct":14},"E","分析和测量关键活动的能力","ADE","【知识点】 考察质量管理体系的过程方法原则及其应用措施。 【答案解析】 正确答案为A、D、E，这些措施直接支持过程方法中识别活动、明确职责和测量能力以改进过程；B和C虽相关但更偏向体系整体设计而非具体控制措施。",{"id":6,"name":31,"category":32,"favorite":33},"装饰方向-岗位技能","建筑工程",0]