[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1277356":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1277356,867,2,"多选题","现场施工准备工作的质量控制包括( )。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","计量控制",true,{"key":16,"text":17,"correct":14},"B","测量控制",{"key":19,"text":20,"correct":21},"C","工程质量控制",false,{"key":23,"text":24,"correct":14},"D","施工平面图控制",{"key":26,"text":27,"correct":14},"E","工程质量检查验收的划分项目","ABDE","【知识点】 考察施工准备阶段质量控制的具体内容。 【答案解析】 现场施工准备工作的质量控制包括计量控制、测量控制、施工平面图控制以及工程质量检查验收的划分项目，因此A、B、D、E正确；C选项“工程质量控制”属于总体质量控制范畴，不是施工准备工作的具体内容。",{"id":6,"name":31,"category":32,"favorite":33},"装饰方向-岗位技能","建筑工程",0]