[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1277336":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1277336,867,2,"多选题","抹灰工程的施工控制点包括( )。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","空鼓、开裂和烂根",true,{"key":16,"text":17,"correct":18},"B","铰链、螺钉、铰链槽",false,{"key":20,"text":21,"correct":14},"C","抹灰平整度,阴阳角垂直、方正度",{"key":23,"text":24,"correct":14},"D","踢脚板和水泥墙裙等上口出墙厚度控制",{"key":26,"text":27,"correct":14},"E","接槎,颜色","ACDE","【知识点】 考察抹灰工程施工质量控制要点。 【答案解析】 正确答案为A、C、D、E。这些选项分别涉及抹灰常见质量问题（空鼓、开裂、烂根）、平整度与阴阳角方正、踢脚板等上口厚度控制及接槎颜色，均为关键控制点；B项属门窗安装内容，与抹灰无关。",{"id":6,"name":31,"category":32,"favorite":33},"装饰方向-岗位技能","建筑工程",0]