[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1277334":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1277334,867,2,"多选题","门窗工程的施工控制点的预防措施包括( )。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","基层应清理干净,抹灰前要浇水湿润,注意砂浆配合比,使底层砂浆与楼板粘结牢同;抹灰时应分层分遍压实,施工完后及时浇水养护",false,{"key":16,"text":17,"correct":14},"B","抹灰前要认真用托线板、靠尺对抹灰墙而尺寸预测摸底,安排好阴阳角不同两个面的灰层厚度和方正,认真做好灰饼、冲筋",{"key":19,"text":20,"correct":21},"C","砌筑时上下左右拉线找规矩,一般门窗框上皮应低于门窗过梁0～15mm,窗框下皮应比窗台上皮高5mm",true,{"key":23,"text":24,"correct":21},"D","铰链位置距门窗上下端宜取立梃高度的1\u002F10",{"key":26,"text":27,"correct":21},"E","安装人员必须按照工艺要点施工,安装前先弹线找规矩,做好准备工作后,先安样板,合格后再全面安装","CDE","【知识点】 门窗工程施工控制点的预防措施 【答案解析】 正确答案为C、D、E。C涉及门窗框与过梁、窗台的尺寸控制，D规定铰链位置，E强调弹线、样板等安装准备，均属门窗工程的关键预防措施；A、B分别针对抹灰和墙面平整，与门窗工程无直接关联。",{"id":6,"name":31,"category":32,"favorite":33},"装饰方向-岗位技能","建筑工程",0]