[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1277280":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1277280,867,1,"单选题","建设单位应当( ),依照本办法规定,向工程所在地的县级以上地方人民政府建设主管部门备案。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","自工程开工之日起15日内",false,{"key":16,"text":17,"correct":14},"B","自工程基础工程结束之日起",{"key":19,"text":20,"correct":21},"C","自工程竣工验收合格之日起15日内",true,{"key":23,"text":24,"correct":14},"D","自工程竣工验收之日起15日内","【知识点】 考察建设工程竣工验收备案的时限规定。 【答案解析】 正确答案为C，依据《房屋建筑工程和市政基础设施工程竣工验收备案管理办法》，建设单位应自工程竣工验收合格之日起15日内办理备案，关键在“竣工验收合格”而非“竣工验收”之日。",{"id":6,"name":27,"category":28,"favorite":29},"装饰方向-岗位技能","建筑工程",0]