[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1277240":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1277240,867,1,"单选题","管理和作业策划:对实施质量体系进行准备,包括( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","组织和安排",true,{"key":16,"text":17,"correct":18},"B","服务策划",false,{"key":20,"text":21,"correct":18},"C","作业策划",{"key":23,"text":24,"correct":18},"D","编制质量计划和作出质量改进规定","【知识点】 考察质量体系实施准备阶段中管理和作业策划的具体内容。 【答案解析】 正确答案是A，因为管理和作业策划的核心是对实施质量体系进行组织和安排，而其他选项如服务策划、作业策划或编制计划属于更具体的子项或后续步骤。",{"id":6,"name":27,"category":28,"favorite":29},"装饰方向-岗位技能","建筑工程",0]