[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1277226":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1277226,867,1,"单选题","作为建设工程项目的( ).不仅要系统认识和思考以上各种因素对建设工程项目质量形成的影响及其规律,而且要分清对于建设工程项目质量控制来说,哪些是可控因素,哪些是不可控因素。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","施工者",false,{"key":16,"text":17,"correct":14},"B","技术人员",{"key":19,"text":20,"correct":21},"C","管理者",true,{"key":23,"text":24,"correct":14},"D","购买者","【知识点】 建设工程项目质量管理的责任主体 【答案解析】 管理者需系统认识影响质量的因素并区分可控与不可控因素，故选C。施工者、技术人员侧重执行，购买者非项目内部主体。",{"id":6,"name":27,"category":28,"favorite":29},"装饰方向-岗位技能","建筑工程",0]