[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1277219":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1277219,867,1,"单选题","( )以使不合格的工序或最终产品（包括单位工程或整个工程项目）不流入下道工序、不进入市场。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","事前质量控制",false,{"key":16,"text":17,"correct":18},"B","事后质量控制",true,{"key":20,"text":21,"correct":14},"C","事中质量控制",{"key":23,"text":24,"correct":14},"D","全面质量控制","【知识点】 考察施工项目质量控制中事前、事中、事后质量控制的概念区分。 【答案解析】 正确答案是B（事后质量控制）。关键理由：事后质量控制旨在对已完成工序或产品进行检查、验收，防止不合格品流入下道工序或市场，而事前和事中控制分别强调预防和过程控制。",{"id":6,"name":27,"category":28,"favorite":29},"装饰方向-岗位技能","建筑工程",0]