[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1277217":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1277217,867,1,"单选题","技术准备工作的质鼍控制针对( ),明确( )的重点对象和控制方法;尽可能地提高上述工作成果对施工质量的保证程度等。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","质量控制点质量控制",true,{"key":16,"text":17,"correct":18},"B","管理控制点管理控制",false,{"key":20,"text":21,"correct":18},"C","质量控制点管理控制",{"key":23,"text":24,"correct":18},"D","管理控制点质量控制","【知识点】 考察施工技术准备工作中质量控制的对象与重点。 【答案解析】 正确答案为A，技术准备工作的质量控制应针对“质量控制点”明确其“质量控制”的重点对象和方法，以提升施工质量保证程度。",{"id":6,"name":27,"category":28,"favorite":29},"装饰方向-岗位技能","建筑工程",0]