[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1277216":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1277216,867,1,"单选题","( )是建设工程产品南设计转化为实物的第一步。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","土样检测",false,{"key":16,"text":17,"correct":14},"B","坐标确定",{"key":19,"text":20,"correct":14},"C","试块检测",{"key":22,"text":23,"correct":24},"D","工程测量放线",true,"【知识点】 考察建设工程施工准备阶段中测量放线的作用。 【答案解析】 正确答案是D，工程测量放线是将设计图纸上的建筑物位置、尺寸等落实到实地，是设计转化为实物的第一步。",{"id":6,"name":27,"category":28,"favorite":29},"装饰方向-岗位技能","建筑工程",0]