[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1277212":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1277212,867,1,"单选题","工序施工条件控制手段包括( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","检测、测试",true,{"key":16,"text":17,"correct":18},"B","分析、测算",false,{"key":20,"text":21,"correct":18},"C","归纳总结",{"key":23,"text":24,"correct":18},"D","设备仪器的调试","【知识点】 考察施工过程质量控制中工序施工条件的控制手段。 【答案解析】 正确答案为A，工序施工条件控制主要通过检测和测试来验证施工条件是否符合要求，确保工序质量，其他选项不属于直接控制手段。",{"id":6,"name":27,"category":28,"favorite":29},"装饰方向-岗位技能","建筑工程",0]