[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-866-8":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":744},{"id":5,"name":6,"category":7,"favorite":8},866,"土建方向-通用基础","建筑工程",0,8,50,577,[13,38,53,68,83,98,112,127,142,157,172,187,201,216,230,245,260,275,289,303,318,332,345,360,375,389,403,417,431,445,460,474,488,501,515,530,545,559,574,588,602,617,631,646,660,674,688,702,716,730],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1276855,2,"多选题","下列属于生产经营单位的安全生产管理人员职责的是( )。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","对检查中发现的安全问题,应当立即处理;不能处理的,应当及时报告本单位有关负责人",true,{"key":24,"text":25,"correct":26},"B","及时、如实报告生产安全事故",false,{"key":28,"text":29,"correct":22},"C","检查及处理情况应当记录在案",{"key":31,"text":32,"correct":26},"D","督促、检查本单位的安全生产工作,及时消除生产安全事故隐患",{"key":34,"text":35,"correct":22},"E","根据本单位的生产经营特点,对安全生产状况进行经常性检查","ACE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1276856,"建设活动中的行政管理关系,是国家及其建设行政主管部门同( )及建设监理等中介服务单位之间的管理与被管理关系。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"建设单位",{"key":24,"text":45,"correct":26},"劳务分包单位",{"key":28,"text":47,"correct":22},"施工单位",{"key":31,"text":49,"correct":22},"建筑材料和设备的生产供应单位",{"key":34,"text":51,"correct":22},"设计单位","ACDE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1276857,"建设法规的调整对象,即发生在各种建设活动中的社会关系,包括( )。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"建设活动中的行政管理关系",{"key":24,"text":60,"correct":22},"建设活动中的经济协作关系",{"key":28,"text":62,"correct":26},"建设活动中的财产人身关系",{"key":31,"text":64,"correct":22},"建设活动中的民事关系",{"key":34,"text":66,"correct":26},"建设活动中的人身关系","ABD",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},1276858,"下列方法中不是质量数据统计分析的基本方法的是( )。",[72,74,76,78,80],{"key":20,"text":73,"correct":26},"调查表法",{"key":24,"text":75,"correct":22},"填表法",{"key":28,"text":77,"correct":26},"分层法",{"key":31,"text":79,"correct":26},"因果分析图",{"key":34,"text":81,"correct":22},"分布法","BE",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},1276859,"随机抽样的方法主要有( )。",[87,89,91,93,95],{"key":20,"text":88,"correct":22},"完全随机抽样",{"key":24,"text":90,"correct":22},"等距抽样",{"key":28,"text":92,"correct":22},"分层抽样",{"key":31,"text":94,"correct":22},"整群抽样",{"key":34,"text":96,"correct":22},"多阶段抽样","ABCDE",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":67,"analysis":37},1276860,"全数检验的适用条件为( )。",[102,104,106,108,110],{"key":20,"text":103,"correct":22},"总体的数量较少",{"key":24,"text":105,"correct":22},"检测项目比较重要",{"key":28,"text":107,"correct":26},"检测方法会对产品产生破坏",{"key":31,"text":109,"correct":22},"检测方法不会对产品产生破坏",{"key":34,"text":111,"correct":26},"检测用时较长",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":126,"analysis":37},1276861,"统计推断的工作过程正确的是( )。",[116,118,120,122,124],{"key":20,"text":117,"correct":26},"一批产品（检测、数据整理）→样本（随机抽样）→样本质量评价（推断、分析和评价）→总体的质量",{"key":24,"text":119,"correct":26},"生产过程（随机抽样）→样本（推断、分析和评价）→样本质量评价（检测、数据整理）→总体的质量",{"key":28,"text":121,"correct":22},"一批产品（随机抽样）→样本（检测、数据整理）→样本质量评价（推断、分析和评价）→总体的质量",{"key":31,"text":123,"correct":26},"一批产品（推断、分析和评价）→总体的质量（随机抽样）→样本（检测、数据整理）→样本质量评价",{"key":34,"text":125,"correct":22},"生产过程（随机抽样）→样本（检测、数据整理）→样本质量评价（推断、分析和评价）→总体的质量","CE",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":141,"analysis":37},1276862,"下列关于统计量的说法正确的是( )。",[131,133,135,137,139],{"key":20,"text":132,"correct":26},"统计量都是样本函数",{"key":24,"text":134,"correct":22},"统计量是结合总体期望进行的推断",{"key":28,"text":136,"correct":22},"统计量需要研究一些常用的随机变量",{"key":31,"text":138,"correct":22},"统计量是根据具体要求的推断",{"key":34,"text":140,"correct":26},"统计量的概率密度解析比较容易","BCD",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":156,"analysis":37},1276863,"水平位移观测的方法( )。",[146,148,150,152,154],{"key":20,"text":147,"correct":22},"角度前方交会法",{"key":24,"text":149,"correct":26},"石膏板标志法",{"key":28,"text":151,"correct":26},"白钢板标志法",{"key":31,"text":153,"correct":22},"基准线法",{"key":34,"text":155,"correct":26},"水准测量法","AD",{"id":158,"libraryId":5,"type":15,"typeLabel":16,"stem":159,"options":160,"answer":171,"analysis":37},1276864,"以下对轴线控制桩法叙述正确的有( )。",[161,163,165,167,169],{"key":20,"text":162,"correct":26},"可以控制标高",{"key":24,"text":164,"correct":22},"可以控制轴线位置",{"key":28,"text":166,"correct":26},"与龙门板法相比机械化施工时易破坏",{"key":31,"text":168,"correct":22},"桩位一般距开挖边线4m以外",{"key":34,"text":170,"correct":22},"轴线可以投测到附件的建筑物","BDE",{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":186,"analysis":37},1276865,"全站仪除能自动测距、测角外,还能快速完成的工作包括( )。",[176,178,180,182,184],{"key":20,"text":177,"correct":22},"计算平距、高差",{"key":24,"text":179,"correct":26},"计算二维坐标",{"key":28,"text":181,"correct":26},"按垂直角和距离进行放样测量",{"key":31,"text":183,"correct":22},"按坐标进行放样",{"key":34,"text":185,"correct":22},"将任一方向的水平角置为0°00‘00","ADE",{"id":188,"libraryId":5,"type":15,"typeLabel":16,"stem":189,"options":190,"answer":186,"analysis":37},1276866,"经纬仪使用步骤包括( )。",[191,193,195,197,199],{"key":20,"text":192,"correct":22},"仪器的安置",{"key":24,"text":194,"correct":26},"对中",{"key":28,"text":196,"correct":26},"粗略整平",{"key":31,"text":198,"correct":22},"照准目标",{"key":34,"text":200,"correct":22},"读数",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":215,"analysis":37},1276867,"柱中箍筋的作用,下述何项是正确的( )。",[205,207,209,211,213],{"key":20,"text":206,"correct":22},"防止纵向钢筋发生压屈",{"key":24,"text":208,"correct":22},"增强柱的抗剪强度",{"key":28,"text":210,"correct":22},"固定纵向钢筋的位置",{"key":31,"text":212,"correct":26},"提高柱的抗压承载力",{"key":34,"text":214,"correct":26},"增加柱子混凝土的耐久性","ABC",{"id":217,"libraryId":5,"type":15,"typeLabel":16,"stem":218,"options":219,"answer":52,"analysis":37},1276868,"焊缝按施工位置分为( )。",[220,222,224,226,228],{"key":20,"text":221,"correct":22},"俯焊",{"key":24,"text":223,"correct":26},"侧焊",{"key":28,"text":225,"correct":22},"立焊",{"key":31,"text":227,"correct":22},"横焊",{"key":34,"text":229,"correct":22},"仰焊",{"id":231,"libraryId":5,"type":15,"typeLabel":16,"stem":232,"options":233,"answer":244,"analysis":37},1276870,"下列用截面法计算指定截面剪力和弯矩的步骤错误的是( )。",[234,236,238,240,242],{"key":20,"text":235,"correct":26},"计算支反力→截取研究对象→画受力图→建立平衡方程→求解内力",{"key":24,"text":237,"correct":22},"建立平衡方程→计算支反力→截取研究对象→画受力图→求解内力",{"key":28,"text":239,"correct":22},"截取研究对象→计算支反力→画受力图一建立平衡方程→求解内力",{"key":31,"text":241,"correct":22},"计算支反力→建立平衡方程→截取研究对象→画受力图→求解内力",{"key":34,"text":243,"correct":22},"计算支反力→截取研究对象→建立平衡方程→画受力图→求解内力","BCDE",{"id":246,"libraryId":5,"type":15,"typeLabel":16,"stem":247,"options":248,"answer":259,"analysis":37},1276871,"下列关于承台构造的说法正确的是( )。",[249,251,253,255,257],{"key":20,"text":250,"correct":26},"承台的宽度不小于300mm",{"key":24,"text":252,"correct":22},"承台的配筋,对于矩形承台其钢筋应按双向均匀通长配筋,钢筋直径不小于lOmm",{"key":28,"text":254,"correct":22},"对于三桩承台,钢筋应按三向板带均匀配置",{"key":31,"text":256,"correct":26},"承台混凝土的强度等级不低于C45",{"key":34,"text":258,"correct":22},"承台的厚度不小于300mm","BCE",{"id":261,"libraryId":5,"type":15,"typeLabel":16,"stem":262,"options":263,"answer":274,"analysis":37},1276873,"屋面坡度的形成方法包括( )。",[264,266,268,270,272],{"key":20,"text":265,"correct":22},"材料找坡",{"key":24,"text":267,"correct":22},"结构找坡",{"key":28,"text":269,"correct":26},"人工找坡",{"key":31,"text":271,"correct":22},"垫置找坡",{"key":34,"text":273,"correct":22},"搁置找坡","ABDE",{"id":276,"libraryId":5,"type":15,"typeLabel":16,"stem":277,"options":278,"answer":215,"analysis":37},1276876,"下列说法中正确的是( )。",[279,281,283,285,287],{"key":20,"text":280,"correct":22},"楼板层一般由面层和结构层组成",{"key":24,"text":282,"correct":22},"结构层是建筑的水平承重构件",{"key":28,"text":284,"correct":22},"某些有特殊的使用要求的房间地面还需要设置附加层",{"key":31,"text":286,"correct":26},"附加层通常设置在面层之上",{"key":34,"text":288,"correct":26},"面层起到划分建筑内部竖向空间、防火、隔声的作用",{"id":290,"libraryId":5,"type":15,"typeLabel":16,"stem":291,"options":292,"answer":52,"analysis":37},1276877,"地下室防水的构造方案有( )。",[293,295,297,299,301],{"key":20,"text":294,"correct":22},"卷材防水",{"key":24,"text":296,"correct":26},"砂浆防水",{"key":28,"text":298,"correct":22},"构建自防水",{"key":31,"text":300,"correct":22},"降排水法",{"key":34,"text":302,"correct":22},"综合法",{"id":304,"libraryId":5,"type":15,"typeLabel":16,"stem":305,"options":306,"answer":317,"analysis":37},1276878,"散水应当采用( )材料做面层,采用( )做垫层。",[307,309,311,313,315],{"key":20,"text":308,"correct":22},"混凝土,混凝土",{"key":24,"text":310,"correct":22},"砂浆,混凝土",{"key":28,"text":312,"correct":26},"混凝土,砂浆",{"key":31,"text":314,"correct":26},"碎砖,混凝土",{"key":34,"text":316,"correct":26},"细砂,砂浆","AB",{"id":319,"libraryId":5,"type":15,"typeLabel":16,"stem":320,"options":321,"answer":82,"analysis":37},1276879,"下列说法正确的是( )。",[322,324,326,328,330],{"key":20,"text":323,"correct":26},"基本部分向它支持的附属部分传递力",{"key":24,"text":325,"correct":22},"基本部分上的荷载通过支座直接传于地基",{"key":28,"text":327,"correct":26},"附属部分上的荷载通过支座直接传于地基",{"key":31,"text":329,"correct":26},"只有基本部分能产生内力和弹性变形",{"key":34,"text":331,"correct":22},"附属部分和基本部分均能产生内力和弹性变形",{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":334,"options":335,"answer":126,"analysis":37},1276880,"作用在刚体上的三个相互平衡的力,若其中两个力的作用线相交于一点,则第三个力的作用线( )。",[336,338,340,341,343],{"key":20,"text":337,"correct":26},"必定交于同一点",{"key":24,"text":339,"correct":26},"不一定交于同一点",{"key":28,"text":337,"correct":22},{"key":31,"text":342,"correct":26},"交于一点但不共面",{"key":34,"text":344,"correct":22},"三个力的作用线共面",{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":359,"analysis":37},1276881,"图示ABC杆,固定端A的反力是( )。",[349,351,353,355,357],{"key":20,"text":350,"correct":22},"XA=P",{"key":24,"text":352,"correct":26},"YA=P",{"key":28,"text":354,"correct":22},"YA=0",{"key":31,"text":356,"correct":22},"MA=Pa",{"key":34,"text":358,"correct":26},"MA=PL","ACD",{"id":361,"libraryId":5,"type":15,"typeLabel":16,"stem":362,"options":363,"answer":374,"analysis":37},1276882,"平面一般力系的平衡条件是:力系的( )均等于零。",[364,366,368,370,372],{"key":20,"text":365,"correct":26},"活荷载",{"key":24,"text":367,"correct":22},"主矢",{"key":28,"text":369,"correct":26},"恒荷载",{"key":31,"text":371,"correct":22},"主矩",{"key":34,"text":373,"correct":26},"动荷载","BD",{"id":376,"libraryId":5,"type":15,"typeLabel":16,"stem":377,"options":378,"answer":259,"analysis":37},1276883,"有关力偶的性质叙述错误的是( )。",[379,381,383,385,387],{"key":20,"text":380,"correct":26},"力偶对任意点取矩都等于力偶矩,不因矩心的改变而改变",{"key":24,"text":382,"correct":22},"力偶有合力,力偶可以用一个合力来平衡",{"key":28,"text":384,"correct":22},"只要保持力偶矩不变,力偶可在其作用面内任意移转,对刚体的作用效果不变",{"key":31,"text":386,"correct":26},"只要保持力偶矩不变,可以同时改变力偶中力的大小与力偶臂的长短",{"key":34,"text":388,"correct":22},"作用在同一物体上的若干个力偶组成一个力偶系",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":374,"analysis":37},1276884,"下列关于平面汇交力系的说法正确的是( )。",[393,395,397,399,401],{"key":20,"text":394,"correct":26},"各力的作用线不汇交于一点的力系,称为平面一般力系",{"key":24,"text":396,"correct":22},"力在X轴上投影绝对值为Fx=FCOSa",{"key":28,"text":398,"correct":26},"力在y轴上投影绝对值为FY=FCosa",{"key":31,"text":400,"correct":22},"合力在任意轴上的投影等于各分力在同一轴上投影的代数和",{"key":34,"text":402,"correct":26},"力的分解即为力的投影",{"id":404,"libraryId":5,"type":15,"typeLabel":16,"stem":405,"options":406,"answer":215,"analysis":37},1276885,"下列约束反力的特点正确的是( )。",[407,409,411,413,415],{"key":20,"text":408,"correct":22},"约束反力是已知的",{"key":24,"text":410,"correct":22},"约束反力是未知的",{"key":28,"text":412,"correct":22},"约束反力的方向总是与约束所能限制的运动方向相反",{"key":31,"text":414,"correct":26},"约束即为约束反力",{"key":34,"text":416,"correct":26},"约束反力的作用点在物体与约束相接触的那一点",{"id":418,"libraryId":5,"type":15,"typeLabel":16,"stem":419,"options":420,"answer":259,"analysis":37},1276886,"以下各项巾属于施工现场管理的内容的是( )。",[421,423,425,427,429],{"key":20,"text":422,"correct":26},"落实资源进度计划",{"key":24,"text":424,"correct":22},"设计施工现场平面图",{"key":28,"text":426,"correct":22},"建立文明施工现场",{"key":31,"text":428,"correct":26},"施工资源进度计划的动态调整",{"key":34,"text":430,"correct":22},"及时清场转移",{"id":432,"libraryId":5,"type":15,"typeLabel":16,"stem":433,"options":434,"answer":374,"analysis":37},1276887,"下列关于施工项目目标控制的措施说法错误的是( )。",[435,437,439,441,443],{"key":20,"text":436,"correct":26},"建立完善的工程统计管理体系和统计制度属于信息管理措施",{"key":24,"text":438,"correct":22},"主要有组织措施、技术措施、合同措施、经济措施和管理措施",{"key":28,"text":440,"correct":26},"落实施工方案,在发生问题时,能适时调整工作之间的逻辑关系,加快实施进度属于技术措施",{"key":31,"text":442,"correct":22},"签订并实施关于工期和进度的经济承包责任制属于合同措施",{"key":34,"text":444,"correct":26},"落实各级进度控制的人员及其具体任务和工作责任属于组织措施",{"id":446,"libraryId":5,"type":15,"typeLabel":16,"stem":447,"options":448,"answer":459,"analysis":37},1276888,"下列关于门窗工程施工工艺的说法中,正确的是( )。",[449,451,453,455,457],{"key":20,"text":450,"correct":26},"塑料门窗中连接件的位置应距窗角、中竖框、中横框150～250mm,连接件之间的距离小于等于800mm",{"key":24,"text":452,"correct":22},"塑料门窗安装完毕后,要逐个进行启闭调试,保证开关灵活,性能良好,关闭严密,表面平整",{"key":28,"text":454,"correct":22},"塑料门窗的安装工艺流程为:找规矩弹线→安装门窗框→门窗框嵌缝→安装门窗扇→安装五金（玻璃）→调试、清理成品保护",{"key":31,"text":456,"correct":26},"塑料门窗通常采用推拉、平开、自动式等方式开启",{"key":34,"text":458,"correct":26},"木门窗五金安装时,门窗扇嵌L铁、T铁时应加以隐蔽,做凹槽,安完后应低于表面2mm左右","BC",{"id":461,"libraryId":5,"type":15,"typeLabel":16,"stem":462,"options":463,"answer":141,"analysis":37},1276889,"下列关于涂饰工程施工工艺的说法中,错误的是( )。",[464,466,468,470,472],{"key":20,"text":465,"correct":26},"施工工艺流程为:基层处理一打底、批刮腻子一面层施涂一修理",{"key":24,"text":467,"correct":22},"混凝土与抹灰表面在施涂前应将基体或基层的缺棱掉角处孔洞用1:2的水泥砂浆修补",{"key":28,"text":469,"correct":22},"外墙抗裂弹性腻子修补、填平时,待修补完成后,将抹灰面满刮外墙抗裂弹性腻子一遍,腻子批刮厚度为0.3～0.8mm",{"key":31,"text":471,"correct":22},"面层施涂滚涂大面时,用长度为15～20Cm的长辊,以利于提高功效",{"key":34,"text":473,"correct":26},"底漆和乳胶漆施工适宜温度为0℃以上,未用完的底乳胶漆应加盖密封,并存放在阴凉通风处",{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":171,"analysis":37},1276890,"下列关于木地板楼地面铺设施工的说法中,正确的是( )。",[478,480,482,484,486],{"key":20,"text":479,"correct":26},"安装木搁栅要严格做到整间木搁栅面标高一致,用5m直尺检查,空隙不大于3mm",{"key":24,"text":481,"correct":22},"实铺式木地板是指木地板通过木搁栅与基层相连或胶粘剂直接粘贴于基层上,实铺式一般用于2层以上的干燥楼面",{"key":28,"text":483,"correct":26},"铺钉硬木地板先由两边向中央进行,后埔镶边",{"key":31,"text":485,"correct":22},"随刮胶粘剂随铺地板,人员随铺随往后退,要用力推紧、压平,并随即用砂袋等物压6～24h",{"key":34,"text":487,"correct":22},"一般做清漆罩面,涂刷完毕后养护3～5d打蜡,蜡要涂得薄而匀,再用打蜡机擦亮隔1d后就可上人使用",{"id":489,"libraryId":5,"type":15,"typeLabel":16,"stem":490,"options":491,"answer":215,"analysis":37},1276891,"防水工程按其所用材料不同可分为( )。",[492,493,495,497,499],{"key":20,"text":294,"correct":22},{"key":24,"text":494,"correct":22},"涂料防水",{"key":28,"text":496,"correct":22},"砂浆、混凝土防水",{"key":31,"text":498,"correct":26},"结构自防水",{"key":34,"text":500,"correct":26},"防水层防水",{"id":502,"libraryId":5,"type":15,"typeLabel":16,"stem":503,"options":504,"answer":67,"analysis":37},1276892,"下列关于涂料防水中找平层施工的说法中,正确的是( )。",[505,507,509,511,513],{"key":20,"text":506,"correct":22},"采用沥青砂浆找平层时,滚筒应保持清洁,表面可涂刷柴油",{"key":24,"text":508,"correct":22},"采用水泥砂浆找平层时,铺设找平层12h后,需洒水养护或喷冷底子油养护",{"key":28,"text":510,"correct":26},"采用细石混凝土找平层时,浇筑时混凝土的坍落度应控制在20mm,浇捣密实",{"key":31,"text":512,"correct":22},"沥青砂浆找平层一般不宜在气温0℃以下施工",{"key":34,"text":514,"correct":26},"采用细石混凝土找平层时,浇筑完板缝混凝土后,应立即覆盖并浇水养护3d,待混凝土强度等级达到C15时,方可继续施工",{"id":516,"libraryId":5,"type":15,"typeLabel":16,"stem":517,"options":518,"answer":529,"analysis":37},1276893,"下列关于钢结构安装施工要点的说法中,错误的是( )。",[519,521,523,525,527],{"key":20,"text":520,"correct":22},"起吊事先将钢构件吊离地面30Cm左右,使钢构件中心对准安装位置中心",{"key":24,"text":522,"correct":22},"高强度螺栓上、下接触面处加有1\u002F15以上斜度时应采用垫圈垫平",{"key":28,"text":524,"correct":26},"施焊前.焊工应检查焊接件的接头质量和焊接区域的坡口、间隙、钝边等的处理情况",{"key":31,"text":526,"correct":26},"厚度大于12～20mm的板材,单面焊后,背面清根,再进行焊接",{"key":34,"text":528,"correct":22},"焊道两端加引弧板和熄弧板.引弧和熄弧焊缝长度应大于或等于150mm","ABE",{"id":531,"libraryId":5,"type":15,"typeLabel":16,"stem":532,"options":533,"answer":544,"analysis":37},1276894,"爬升模板适用于( )等。",[534,536,538,540,542],{"key":20,"text":535,"correct":22},"墙体",{"key":24,"text":537,"correct":22},"电梯井",{"key":28,"text":539,"correct":22},"桥梁",{"key":31,"text":541,"correct":22},"塔柱",{"key":34,"text":543,"correct":26},"公路","ABCD",{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":36,"analysis":37},1276895,"下列关于模板安装与拆除的基本规定中，正确的是( )。",[549,551,553,555,557],{"key":20,"text":550,"correct":22},"同一条拼缝上的u形卡,不宜向同一方向卡紧",{"key":24,"text":552,"correct":26},"钢楞宜采用整根杆件,接头宜错开设置,搭接长度不应小于300mm",{"key":28,"text":554,"correct":22},"模板支设时,采用预组拼方法,可以加快施工速度,提高工效和模板的安装质量,但必须具备相适应的吊装设备和有较大的拼装场地",{"key":31,"text":556,"correct":26},"模板拆除时,当混凝土强度大于1.2N／mm²时,应先拆除侧面模板,再拆除承重模板",{"key":34,"text":558,"correct":22},"模板拆除的顺序和方法,应按照配板设计的规定进行,遵循先支后拆,先非承重部位,后承重部位以及自上而下的原则",{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":573,"analysis":37},1276896,"下列关于常用落地式脚手架的施工要点的基本规定中,正确的是( )。",[563,565,567,569,571],{"key":20,"text":564,"correct":26},"底立杆应接立杆接长要求选择不同长度的钢管交错设置,至少应有三种适合不同长度的钢管作立杆",{"key":24,"text":566,"correct":26},"对接平板脚手板时,对接处的两侧必须设置横杆,作业层的栏杆和挡脚板一般应设在立杆的外侧",{"key":28,"text":568,"correct":22},"连墙件和剪刀撑应及时设置,不得滞后超过2步",{"key":31,"text":570,"correct":22},"杆件端部伸出扣件之外的长度不得小于100mm",{"key":34,"text":572,"correct":22},"周边脚手架的纵向平杆必须在角部交圈并与立杆连接固定","CDE",{"id":575,"libraryId":5,"type":15,"typeLabel":16,"stem":576,"options":577,"answer":544,"analysis":37},1276897,"土钉墙支护与其他支护方法比较,具有( )特点。",[578,580,582,584,586],{"key":20,"text":579,"correct":22},"施工操作简便",{"key":24,"text":581,"correct":22},"设备简单",{"key":28,"text":583,"correct":22},"噪声小",{"key":31,"text":585,"correct":22},"工期短",{"key":34,"text":587,"correct":26},"费用高",{"id":589,"libraryId":5,"type":15,"typeLabel":16,"stem":590,"options":591,"answer":529,"analysis":37},1276898,"下列关于深基坑土方开挖和基坑支护施工的基本规定中,正确的是( )。",[592,594,596,598,600],{"key":20,"text":593,"correct":22},"放坡开挖是最经济的挖土方案,当基坑开挖深度不大周围环境又允许时,均可采用放坡开挖;放坡坡度经计算确定",{"key":24,"text":595,"correct":22},"土钉墙支护与其他支护方法比较,具有施工操作简便、设备简单、噪声小、工期短、费用低的特点",{"key":28,"text":597,"correct":26},"中心岛（墩）式挖土,宜用于中小型基坑,支护结构的支撑形式为角撑、环梁式或边桁（框）架,中间具有较大空间情况下",{"key":31,"text":599,"correct":26},"土钉墙支护适用于深度较大,面积不大、地基土质较差的基坑",{"key":34,"text":601,"correct":22},"工程开挖土方时,地下连续墙可用作支护结构,既挡土又挡水,地下连续墙还可同时用作建筑物的承重结构",{"id":603,"libraryId":5,"type":15,"typeLabel":16,"stem":604,"options":605,"answer":616,"analysis":37},1276899,"下列关于常用人工地基处理方法的基本规定中,正确的是( )。",[606,608,610,612,614],{"key":20,"text":607,"correct":22},"砂石桩适用于挤密松散砂土、素填土和杂填土等地基",{"key":24,"text":609,"correct":26},"振冲桩适用于加同松散的素填土、杂填土地基",{"key":28,"text":611,"correct":26},"强夯法适用于处理高于地下水位0.8m以上稍湿的黏性土、砂土、湿陷性黄土、杂填土和分层填土地基的加固处理",{"key":31,"text":613,"correct":26},"沙井堆载预压法适角于处理深厚软土和冲填土地基,对于泥炭等有机质沉积地基同样适用",{"key":34,"text":615,"correct":22},"沙井堆载预压法多用于处理机场跑道、水工结构、道路、路堤、码头、岸坡等工程地基","AE",{"id":618,"libraryId":5,"type":15,"typeLabel":16,"stem":619,"options":620,"answer":215,"analysis":37},1276900,"施工图识读时,根据投影关系、构造特点和图纸顺序,应( )反复阅读。",[621,623,625,627,629],{"key":20,"text":622,"correct":22},"从前往后",{"key":24,"text":624,"correct":22},"从上往下",{"key":28,"text":626,"correct":22},"从左往右",{"key":31,"text":628,"correct":26},"由内向外",{"key":34,"text":630,"correct":26},"由小到大、由细到粗",{"id":632,"libraryId":5,"type":15,"typeLabel":16,"stem":633,"options":634,"answer":645,"analysis":37},1276901,"下列关于施工图绘制基本规定的说法中,错误的是( )。",[635,637,639,641,643],{"key":20,"text":636,"correct":26},"绘制建筑施工图的一般步骤为:平面图一立面图一剖面图一详图",{"key":24,"text":638,"correct":26},"绘制结构施工图的一般步骤为:基础平面图一基础详图一结构平面布置图一结构详图。",{"key":28,"text":640,"correct":22},"结构平面图中用中实线表示剖到或可见的构件轮廓线,用中虚线表示不可见构件的轮廓线,门窗洞也需画出",{"key":31,"text":642,"correct":22},"在结构平面图中,不同规格的分布筋也应画出",{"key":34,"text":644,"correct":26},"建筑立面图应从平面图中引出立面的长度,从剖面图中量出立面的高度及各部位的相应位置","CD",{"id":647,"libraryId":5,"type":15,"typeLabel":16,"stem":648,"options":649,"answer":82,"analysis":37},1276902,"下列关于结构平面布置图基本规定的说法中,错误的是( )。",[650,652,654,656,658],{"key":20,"text":651,"correct":26},"对于承重构件布置相同的楼层,只画出一个结构平面布置图,称为标准层结构平面布置图",{"key":24,"text":653,"correct":22},"对于现浇楼板,可以在平面布置图上标出板的名称,必须另外绘制板的配筋图",{"key":28,"text":655,"correct":26},"结构布置图中钢筋混凝土楼板的表达方式,有预制楼板的表达方式和现浇楼板的表达方式",{"key":31,"text":657,"correct":26},"现浇板必要时尚应在平面图中表示施工后浇带的位置及宽度",{"key":34,"text":659,"correct":22},"采用预制板时注明预制板的跨度方向、板号,数量及板底标高即可",{"id":661,"libraryId":5,"type":15,"typeLabel":16,"stem":662,"options":663,"answer":259,"analysis":37},1276903,"下列关于基础详图基本规定的说法中,正确的是( )。",[664,666,668,670,672],{"key":20,"text":665,"correct":26},"基础详图的轮廓线用中实线表示,断面内应画出材料图例;对钢筋混凝土基础,同样需要画出配筋情况和材料图例",{"key":24,"text":667,"correct":22},"桩基础应绘出桩详图、承台详图及桩与承台的连接构造详图",{"key":28,"text":669,"correct":22},"现浇基础尚应标注预留插筋、搭接长度与位置及箍筋加密等",{"key":31,"text":671,"correct":26},"基础详图中需标注基础各部分的详图尺寸及室内、室外标高等",{"key":34,"text":673,"correct":22},"有沟槽者尚应表明其构造关系",{"id":675,"libraryId":5,"type":15,"typeLabel":16,"stem":676,"options":677,"answer":544,"analysis":37},1276904,"结构施工图一般包括( )。",[678,680,682,684,686],{"key":20,"text":679,"correct":22},"结构设计说明",{"key":24,"text":681,"correct":22},"基础图",{"key":28,"text":683,"correct":22},"结构平面布置图",{"key":31,"text":685,"correct":22},"结构详图",{"key":34,"text":687,"correct":26},"建筑详图",{"id":689,"libraryId":5,"type":15,"typeLabel":16,"stem":690,"options":691,"answer":171,"analysis":37},1276905,"下列关于建筑详图基本规定的说法中,正确的是( )。",[692,694,696,698,700],{"key":20,"text":693,"correct":26},"内外墙节点一般用平面图、立面图和剖面图表示",{"key":24,"text":695,"correct":22},"楼梯平面图必须分层绘制,一般有底层平面图,标准层平面图和顶层平面图",{"key":28,"text":697,"correct":26},"楼梯详图一般包括楼梯平面图、楼梯立面图、楼梯剖面图和节点详图",{"key":31,"text":699,"correct":22},"楼梯间剖面图只需绘制出与楼梯相关的部分,相邻部分可用折断线断开",{"key":34,"text":701,"correct":22},"楼梯节点详图一般采用较大的比例绘制,如1:1、1:2、1:5、1:10、1:20等",{"id":703,"libraryId":5,"type":15,"typeLabel":16,"stem":704,"options":705,"answer":156,"analysis":37},1276906,"下列有关建筑平面图的图示内容的表述中,错误的是( )。",[706,708,710,712,714],{"key":20,"text":707,"correct":22},"定位轴线的编号宜标注在图样的下方与右侧,横向编号应用阿拉伯数字,从左至右顺序编写,竖向编号应用大写拉丁字母,从上至下顺序编写",{"key":24,"text":709,"correct":26},"对于隐蔽的或者在剖切面以上部位的内容,应以虚线表示",{"key":28,"text":711,"correct":26},"建筑平面图上的外部尺寸在水平方向和竖直方向各标注三道尺寸",{"key":31,"text":713,"correct":22},"在平面图上所标注的标高均应为绝对标高",{"key":34,"text":715,"correct":26},"屋面平面图一般内容有:女儿墙、檐沟、屋面坡度、分水线与落水口、变形缝、楼梯间、水箱间、天窗、上人孔、消防梯以及其他构筑物、索引符号等",{"id":717,"libraryId":5,"type":15,"typeLabel":16,"stem":718,"options":719,"answer":359,"analysis":37},1276907,"下列尺寸标注形式的基本规定中,正确的是( )。",[720,722,724,726,728],{"key":20,"text":721,"correct":22},"半圆或小于半圆的圆弧应标注半径,圆及大于半圆的圆弧应标注直径",{"key":24,"text":723,"correct":26},"在圆内标注的直径尺寸线可不通过圆心,只需两端画箭头指至圆弧,较小圆的直径尺寸,可标注在圆外",{"key":28,"text":725,"correct":22},"标注坡度时,在坡度数字下应加注坡度符号,坡度符号为单面箭头,一般指向下坡方向",{"key":31,"text":727,"correct":22},"我国把青岛市外的黄海海平面作为零点所测定的高度尺寸成为绝对标高",{"key":34,"text":729,"correct":26},"在施工图中一般注写到小数点后两位即可",{"id":731,"libraryId":5,"type":15,"typeLabel":16,"stem":732,"options":733,"answer":67,"analysis":37},1276908,"下列关于建筑制图的线型及其应用的说法中,正确的是( )。",[734,736,738,740,742],{"key":20,"text":735,"correct":22},"平、剖面图中被剖切的主要建筑构造（包括构配件）的轮廓线用粗实线绘制",{"key":24,"text":737,"correct":22},"建筑平、立、剖面图巾的建筑构配件的轮廓线用中粗实线绘制",{"key":28,"text":739,"correct":26},"建筑立面图或室内立面图的外轮廓线用中粗实线绘制",{"key":31,"text":741,"correct":22},"拟建、扩建建筑物轮廓用中粗虚线绘制",{"key":34,"text":743,"correct":26},"预应力钢筋线在建筑结构中用粗单点长画线绘制",[745,749,752,755,758,761],{"id":746,"name":747,"category":7,"favorite":748},1,"领导干部任职前廉政法规知识测试题",92,{"id":750,"name":751,"category":7,"favorite":746},595,"建筑结构与设备",{"id":753,"name":754,"category":7,"favorite":746},715,"招标采购专业知识与法律法规",{"id":756,"name":757,"category":7,"favorite":746},848,"市政方向-通用基础",{"id":759,"name":760,"category":7,"favorite":8},534,"BIM工程师",{"id":762,"name":760,"category":7,"favorite":8},535]