[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-866-2":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":617},{"id":5,"name":6,"category":7,"favorite":8},866,"土建方向-通用基础","建筑工程",0,2,50,577,[13,34,46,58,70,82,94,106,118,130,142,154,166,174,186,198,210,222,234,246,258,270,282,294,306,318,330,342,354,366,378,390,402,414,426,438,450,462,474,486,498,510,522,534,546,558,570,582,594,605],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1276546,1,"单选题","下列楼梯中属于按楼梯平面形式分类的为( )。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","辅助楼梯",false,{"key":24,"text":25,"correct":22},"B","封闭楼梯间",{"key":27,"text":28,"correct":29},"C","双跑平行楼梯",true,{"key":31,"text":32,"correct":22},"D","主要楼梯","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},1276547,"按楼梯使用性质分类的是( )。",[38,40,42,44],{"key":20,"text":39,"correct":22},"开敞楼梯间",{"key":24,"text":41,"correct":22},"钢筋混凝土楼梯",{"key":27,"text":43,"correct":29},"疏散楼梯",{"key":31,"text":45,"correct":22},"防烟楼梯间",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},1276548,"为了提高板的刚度,通常在板的两端设置( )封闭。",[50,52,54,56],{"key":20,"text":51,"correct":22},"中肋",{"key":24,"text":53,"correct":22},"劲肋",{"key":27,"text":55,"correct":22},"边肋",{"key":31,"text":57,"correct":29},"端肋",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":27,"analysis":33},1276549,"下列对预制板的叙述错误的是( )。",[62,64,66,68],{"key":20,"text":63,"correct":22},"空心板是一种梁板结合的预制构件",{"key":24,"text":65,"correct":22},"槽形板是一种梁板结合的构件",{"key":27,"text":67,"correct":29},"结构布置时应优先选用窄板,宽板作为调剂使用",{"key":31,"text":69,"correct":22},"预制板的板缝内用细石混凝土现浇",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},1276550,"平面尺寸较小的房间应用( )楼板。",[74,76,78,80],{"key":20,"text":75,"correct":29},"板式楼板",{"key":24,"text":77,"correct":22},"梁板式楼板",{"key":27,"text":79,"correct":22},"井字楼板",{"key":31,"text":81,"correct":22},"无梁楼板",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},1276551,"大跨度工业厂房应用( )。",[86,88,90,92],{"key":20,"text":87,"correct":22},"钢筋混凝土楼板",{"key":24,"text":89,"correct":29},"压型钢板组合楼板",{"key":27,"text":91,"correct":22},"木楼板",{"key":31,"text":93,"correct":22},"竹楼板",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":31,"analysis":33},1276552,"防潮构造:首先要在地下室墙体表面抹( )防水砂浆。",[98,100,102,104],{"key":20,"text":99,"correct":22},"30mm厚1:2",{"key":24,"text":101,"correct":22},"25mm厚1:3",{"key":27,"text":103,"correct":22},"30mm厚1:3",{"key":31,"text":105,"correct":29},"20mm厚1:2",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},1276553,"最为常见的幕墙为( )。",[110,112,114,116],{"key":20,"text":111,"correct":22},"金属板幕墙",{"key":24,"text":113,"correct":29},"玻璃幕墙",{"key":27,"text":115,"correct":22},"陶瓷板幕墙",{"key":31,"text":117,"correct":22},"石材幕墙",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},1276554,"炉渣混凝土砌块和陶粒混凝土砌块的厚度通常为( )mm,加气混凝土砌块多采用( )mm。",[122,124,126,128],{"key":20,"text":123,"correct":29},"90,100",{"key":24,"text":125,"correct":22},"100,90",{"key":27,"text":127,"correct":22},"80,120",{"key":31,"text":129,"correct":22},"120,80",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":27,"analysis":33},1276555,"在寒冷及严寒地区使用比较广泛的复合墙体是( )。",[134,136,138,140],{"key":20,"text":135,"correct":22},"中填保温材料复合墙体",{"key":24,"text":137,"correct":22},"内保温复合墙体",{"key":27,"text":139,"correct":29},"外保温复合墙体",{"key":31,"text":141,"correct":22},"双侧保温材料复合墙体",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},1276556,"当墙厚d>240mm时,圈梁的宽度可以比墙体厚度( )。",[146,148,150,152],{"key":20,"text":147,"correct":22},"大",{"key":24,"text":149,"correct":29},"小",{"key":27,"text":151,"correct":22},"相同",{"key":31,"text":153,"correct":22},"不同",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":20,"analysis":33},1276557,"内墙或南方地区的抹灰外墙,采用( )过梁。",[158,160,162,164],{"key":20,"text":159,"correct":29},"矩形",{"key":24,"text":161,"correct":22},"正方形",{"key":27,"text":163,"correct":22},"T形",{"key":31,"text":165,"correct":22},"L形",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":31,"analysis":33},1276558,"严寒或寒冷地区外墙中,采用( )过梁。",[170,171,172,173],{"key":20,"text":159,"correct":22},{"key":24,"text":161,"correct":22},{"key":27,"text":163,"correct":22},{"key":31,"text":165,"correct":29},{"id":175,"libraryId":5,"type":15,"typeLabel":16,"stem":176,"options":177,"answer":31,"analysis":33},1276559,"当首层地面为实铺时,防潮层的位置通常选择在( )处。",[178,180,182,184],{"key":20,"text":179,"correct":22},"-0.030m",{"key":24,"text":181,"correct":22},"-0.040m",{"key":27,"text":183,"correct":22},"-0.050m",{"key":31,"text":185,"correct":29},"-0.060m",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":31,"analysis":33},1276560,"下列材料中不可以用来做墙身防潮层的是( )。",[190,192,194,196],{"key":20,"text":191,"correct":22},"油毡",{"key":24,"text":193,"correct":22},"防水砂浆",{"key":27,"text":195,"correct":22},"细石混凝土",{"key":31,"text":197,"correct":29},"碎砖灌浆",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":24,"analysis":33},1276561,"基础承担建筑上部结构的( ),并把这些( )有效低传给地基。",[202,204,206,208],{"key":20,"text":203,"correct":22},"部分荷载,荷载",{"key":24,"text":205,"correct":29},"全部荷载,荷载",{"key":27,"text":207,"correct":22},"混凝土强度,强度",{"key":31,"text":209,"correct":22},"混凝土耐久性,耐久性",{"id":211,"libraryId":5,"type":15,"typeLabel":16,"stem":212,"options":213,"answer":20,"analysis":33},1276562,"地基是承担( )传来的建筑全部荷载。",[214,216,218,220],{"key":20,"text":215,"correct":29},"基础",{"key":24,"text":217,"correct":22},"大地",{"key":27,"text":219,"correct":22},"建筑上部结构",{"key":31,"text":221,"correct":22},"地面一切荷载",{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":20,"analysis":33},1276563,"假设固体内部各部分之间的力学性质处处相同,为( )。",[226,228,230,232],{"key":20,"text":227,"correct":29},"均匀性假设",{"key":24,"text":229,"correct":22},"连续性假设",{"key":27,"text":231,"correct":22},"各向同性假设",{"key":31,"text":233,"correct":22},"小变形假设",{"id":235,"libraryId":5,"type":15,"typeLabel":16,"stem":236,"options":237,"answer":20,"analysis":33},1276564,"多跨静定梁的受力分析遵循先( ),后( )的分析顺序。",[238,240,242,244],{"key":20,"text":239,"correct":29},"附属部分,基本部分",{"key":24,"text":241,"correct":22},"基本部分,附属部分",{"key":27,"text":243,"correct":22},"整体,局部",{"key":31,"text":245,"correct":22},"局部,整体",{"id":247,"libraryId":5,"type":15,"typeLabel":16,"stem":248,"options":249,"answer":24,"analysis":33},1276565,"构件在外力作用下平衡时,可以利用( )。",[250,252,254,256],{"key":20,"text":251,"correct":22},"平衡条件求出所有未知力",{"key":24,"text":253,"correct":29},"平衡条件求出某些未知力",{"key":27,"text":255,"correct":22},"力系的简化求未知力",{"key":31,"text":257,"correct":22},"力系的合成或分解求未知力",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":20,"analysis":33},1276566,"平行于横截面的竖向外力称为( ),此力是梁横截面上的切向分布内力的合力。",[262,264,266,268],{"key":20,"text":263,"correct":29},"拉力",{"key":24,"text":265,"correct":22},"压力",{"key":27,"text":267,"correct":22},"剪力",{"key":31,"text":269,"correct":22},"弯矩",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":27,"analysis":33},1276567,"保持力偶矩的大小、转向不变,力偶在作用平面内任意转移,则刚体的转动效应( )。",[274,276,278,280],{"key":20,"text":275,"correct":22},"变大",{"key":24,"text":277,"correct":22},"变小",{"key":27,"text":279,"correct":29},"不变",{"key":31,"text":281,"correct":22},"变化,但不能确定变大还是变小",{"id":283,"libraryId":5,"type":15,"typeLabel":16,"stem":284,"options":285,"answer":31,"analysis":33},1276568,"力使物体绕某点转动的效果要用( )来度量。",[286,288,290,292],{"key":20,"text":287,"correct":22},"力矩",{"key":24,"text":289,"correct":22},"力",{"key":27,"text":291,"correct":22},"弯曲",{"key":31,"text":293,"correct":29},"力偶",{"id":295,"libraryId":5,"type":15,"typeLabel":16,"stem":296,"options":297,"answer":20,"analysis":33},1276569,"力矩的单位是( )。",[298,300,302,304],{"key":20,"text":299,"correct":29},"kN•m",{"key":24,"text":301,"correct":22},"kN\u002Fm",{"key":27,"text":303,"correct":22},"kN",{"key":31,"text":305,"correct":22},"N",{"id":307,"libraryId":5,"type":15,"typeLabel":16,"stem":308,"options":309,"answer":31,"analysis":33},1276570,"力偶对物体的作用效应,决定于( )。",[310,312,314,316],{"key":20,"text":311,"correct":22},"力偶矩的大小",{"key":24,"text":313,"correct":22},"力偶的转向",{"key":27,"text":315,"correct":22},"力偶的作用平面",{"key":31,"text":317,"correct":29},"力偶矩的大小,力偶的转向和力偶的作用平面",{"id":319,"libraryId":5,"type":15,"typeLabel":16,"stem":320,"options":321,"answer":31,"analysis":33},1276571,"固定端支座不仅可以限制物体的( ),还能限制物体的( )。",[322,324,326,328],{"key":20,"text":323,"correct":22},"运动;移动",{"key":24,"text":325,"correct":22},"移动;活动",{"key":27,"text":327,"correct":22},"转动;活动",{"key":31,"text":329,"correct":29},"移动;转动",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":20,"analysis":33},1276572,"光滑面对物体的约束反力,作用在接触点处,其方向沿接触面的公法线( )。",[334,336,338,340],{"key":20,"text":335,"correct":29},"指向受力物体,为压力",{"key":24,"text":337,"correct":22},"指向受力物体,为拉力",{"key":27,"text":339,"correct":22},"背离受力物体,为拉力",{"key":31,"text":341,"correct":22},"背离受力物体,为压力",{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":27,"analysis":33},1276573,"下列措施中,不属于施工准备阶段的安全技术措施的是( )。",[346,348,350,352],{"key":20,"text":347,"correct":22},"技术准备",{"key":24,"text":349,"correct":22},"物资准备",{"key":27,"text":351,"correct":29},"资金准备",{"key":31,"text":353,"correct":22},"施工队伍准备",{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":20,"analysis":33},1276574,"施工项目过程控制中,加强专项检查,包括自检、( )、互检。",[358,360,362,364],{"key":20,"text":359,"correct":29},"专检",{"key":24,"text":361,"correct":22},"全检",{"key":27,"text":363,"correct":22},"交接检",{"key":31,"text":365,"correct":22},"质检",{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":27,"analysis":33},1276575,"下列各项措施中,不属于施工项目质量控制的措施的是( )。",[370,372,374,376],{"key":20,"text":371,"correct":22},"提高管理、施工及操作人员自身素质",{"key":24,"text":373,"correct":22},"提高施工的质量管理水平",{"key":27,"text":375,"correct":29},"尽可能采用先进的施工技术、方法和新材料、新工艺、新技术,保证进度目标实现",{"key":31,"text":377,"correct":22},"加强施工项目的过程控制",{"id":379,"libraryId":5,"type":15,"typeLabel":16,"stem":380,"options":381,"answer":31,"analysis":33},1276576,"为了取得施工成本管理的理想效果,必须从多方面采取有效措施实施管理,这些措施不包括( )。",[382,384,386,388],{"key":20,"text":383,"correct":22},"组织措施",{"key":24,"text":385,"correct":22},"技术措施",{"key":27,"text":387,"correct":22},"经济措施",{"key":31,"text":389,"correct":29},"管理措施",{"id":391,"libraryId":5,"type":15,"typeLabel":16,"stem":392,"options":393,"answer":24,"analysis":33},1276577,"施工项目控制的任务是进行以项目进度控制、质量控制、成本控制和安全控制为主要内容的四大目标控制。其中下列不属于与施工项目成果相关的是( )。",[394,396,398,400],{"key":20,"text":395,"correct":22},"进度控制",{"key":24,"text":397,"correct":29},"安全控制",{"key":27,"text":399,"correct":22},"质量控制",{"key":31,"text":401,"correct":22},"成本控制",{"id":403,"libraryId":5,"type":15,"typeLabel":16,"stem":404,"options":405,"answer":24,"analysis":33},1276578,"施工项目目标控制包括:施工项目进度控制、施工项目质量控制、( )、施工项目安全控制四个方面。",[406,408,410,412],{"key":20,"text":407,"correct":22},"施工项目管理控制",{"key":24,"text":409,"correct":29},"施工项目成本控制",{"key":27,"text":411,"correct":22},"施工项目人力控制",{"key":31,"text":413,"correct":22},"施工项目物资控制",{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":31,"analysis":33},1276579,"施工项目的劳动组织不包括下列的( )。",[418,420,422,424],{"key":20,"text":419,"correct":22},"劳务输入",{"key":24,"text":421,"correct":22},"劳动力组织",{"key":27,"text":423,"correct":22},"项目经理部对劳务队伍的管理",{"key":31,"text":425,"correct":29},"劳务输出",{"id":427,"libraryId":5,"type":15,"typeLabel":16,"stem":428,"options":429,"answer":27,"analysis":33},1276580,"下列选项中,不属于建立施工项目经理部的基本原则的是( )。",[430,432,434,436],{"key":20,"text":431,"correct":22},"根据所设计的项目组织形式设置",{"key":24,"text":433,"correct":22},"适应现场施工的需要",{"key":27,"text":435,"correct":29},"满足建设单位关于施工项目目标控制的要求",{"key":31,"text":437,"correct":22},"根据施工工程任务需要调整",{"id":439,"libraryId":5,"type":15,"typeLabel":16,"stem":440,"options":441,"answer":20,"analysis":33},1276581,"下列性质中,不属于项目经理部的性质的是( )。",[442,444,446,448],{"key":20,"text":443,"correct":29},"法律强制性",{"key":24,"text":445,"correct":22},"相对独立性",{"key":27,"text":447,"correct":22},"综合性",{"key":31,"text":449,"correct":22},"临时性",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":24,"analysis":33},1276582,"下列选项中,不属于施工项目管理组织的主要形式的是( )。",[454,456,458,460],{"key":20,"text":455,"correct":22},"工作队式",{"key":24,"text":457,"correct":29},"线性结构式",{"key":27,"text":459,"correct":22},"矩阵式",{"key":31,"text":461,"correct":22},"事业部式",{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":20,"analysis":33},1276583,"下列施工项目管理程序的排序正确的是( )。",[466,468,470,472],{"key":20,"text":467,"correct":29},"投标、签订合同→施工准备→施工→验收交工与结算→用后服务",{"key":24,"text":469,"correct":22},"施工准备→投标、签订合同→施工→验收交工与结算→用后服务",{"key":27,"text":471,"correct":22},"投标、签订合同→施工→施工准备→验收交工与结算→用后服务",{"key":31,"text":473,"correct":22},"投标、签订合同→施工准备→施工→验收交工→用后服务与结算",{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":27,"analysis":33},1276584,"下列选项中不属于常用施涂方法的是( )。",[478,480,482,484],{"key":20,"text":479,"correct":22},"刷涂",{"key":24,"text":481,"correct":22},"滚涂",{"key":27,"text":483,"correct":29},"甩涂",{"key":31,"text":485,"correct":22},"喷涂",{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":20,"analysis":33},1276585,"涂料防水施工中,下列保护层不适于在立面使用的是( )。",[490,492,494,496],{"key":20,"text":491,"correct":29},"细石混凝土保护层",{"key":24,"text":493,"correct":22},"水泥砂浆保护层",{"key":27,"text":495,"correct":22},"泡沫塑料保护层",{"key":31,"text":497,"correct":22},"砖墙保护层",{"id":499,"libraryId":5,"type":15,"typeLabel":16,"stem":500,"options":501,"answer":24,"analysis":33},1276586,"下列关于涂料防水中防水层施工的说法中,正确的是( )。",[502,504,506,508],{"key":20,"text":503,"correct":22},"湿铺法是在铺第三遍涂料涂刷时,边倒料、边涂刷、边铺贴的操作方法",{"key":24,"text":505,"correct":29},"对于流动性差的涂料,为便于抹压,加快施工进度,可以采用分条间隔施工的方法,条带宽800～1000mm",{"key":27,"text":507,"correct":22},"胎体增强材料混合使用时,一般下层采用玻璃纤维布,上层采用聚酯纤维布",{"key":31,"text":509,"correct":22},"所有收头均应用密封材料压边,压扁宽度不得小于20mm",{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":20,"analysis":33},1276587,"下列关于防水砂浆防水层施工的说法中,正确的是( )。",[514,516,518,520],{"key":20,"text":515,"correct":29},"砂浆防水工程是利用一定配合比的水泥浆和水泥砂浆（称防水砂浆）分层分次施工,相互交替抹压密实的封闭防水整体",{"key":24,"text":517,"correct":22},"防水砂浆防水层的背水面基层的防水层采用五层做法,迎水面基层的防水层采用四层做法",{"key":27,"text":519,"correct":22},"防水层每层应连续施工,素灰层与砂浆层可不在同一天施工完毕",{"key":31,"text":521,"correct":22},"揉浆是使水泥砂浆素灰相互渗透结合牢固,既保护素灰层又起到防水作用,当揉浆难时,允许加水稀释",{"id":523,"libraryId":5,"type":15,"typeLabel":16,"stem":524,"options":525,"answer":27,"analysis":33},1276588,"高强度螺栓的拧紧问题说法错误的是( )。",[526,528,530,532],{"key":20,"text":527,"correct":22},"高强度螺栓连接的拧紧应分为初拧、终拧",{"key":24,"text":529,"correct":22},"对于大型节点应分为初拧、复拧、终拧",{"key":27,"text":531,"correct":29},"复拧扭矩应当大于初拧扭矩",{"key":31,"text":533,"correct":22},"扭剪型高强度螺栓拧紧时对螺母施加逆时针力矩",{"id":535,"libraryId":5,"type":15,"typeLabel":16,"stem":536,"options":537,"answer":20,"analysis":33},1276589,"钢结构的连接方法不包括( )。",[538,540,542,544],{"key":20,"text":539,"correct":29},"绑扎连接",{"key":24,"text":541,"correct":22},"焊接",{"key":27,"text":543,"correct":22},"螺栓连接",{"key":31,"text":545,"correct":22},"铆钉连接",{"id":547,"libraryId":5,"type":15,"typeLabel":16,"stem":548,"options":549,"answer":27,"analysis":33},1276590,"下列各项中,不属于混凝土工程施工内容的是( )。",[550,552,554,556],{"key":20,"text":551,"correct":22},"混凝土拌合料的制备",{"key":24,"text":553,"correct":22},"混凝土拌合料的养护",{"key":27,"text":555,"correct":29},"混凝土拌合料的强度测定",{"key":31,"text":557,"correct":22},"混凝土拌合料的振捣",{"id":559,"libraryId":5,"type":15,"typeLabel":16,"stem":560,"options":561,"answer":31,"analysis":33},1276591,"下列各项中,关于钢筋安装的基本规定正确的说法是( )。",[562,564,566,568],{"key":20,"text":563,"correct":22},"钢筋绑扎用的22号钢丝只用于绑扎直径14mm以下的钢筋",{"key":24,"text":565,"correct":22},"基础底板采用双层钢筋网时,在上层钢筋网下面每隔1.5m放置一个钢筋撑脚",{"key":27,"text":567,"correct":22},"基础钢筋绑扎的施工工艺流程为:清理垫层、画线→摆放下层钢筋,并固定绑扎→摆放钢筋撑脚（双层钢筋时）→绑扎柱墙预留钢筋→绑扎上层钢筋",{"key":31,"text":569,"correct":29},"控制混凝土保护层用的水泥砂浆垫块或塑料卡的厚度,应等于保护层厚度",{"id":571,"libraryId":5,"type":15,"typeLabel":16,"stem":572,"options":573,"answer":24,"analysis":33},1276592,"砖砌体的施工工艺过程正确的是( )。",[574,576,578,580],{"key":20,"text":575,"correct":22},"找平、放线、摆砖样、盘角、立皮数杆、砌筑、勾缝、清理、楼层标高控制、楼层轴线标引等",{"key":24,"text":577,"correct":29},"找平、放线、摆砖样、立皮数杆、盘角、砌筑、清理、勾缝、楼层轴线标引、楼层标高控制等",{"key":27,"text":579,"correct":22},"找平、放线、摆砖样、立皮数杆、盘角、砌筑、勾缝、清理,楼层轴线标引、楼层标高控制等",{"key":31,"text":581,"correct":22},"找平、放线、立皮数杆、摆砖样、盘角、挂线、砌筑、勾缝、清理、楼层标高控制、楼层轴线标引等",{"id":583,"libraryId":5,"type":15,"typeLabel":16,"stem":584,"options":585,"answer":27,"analysis":33},1276593,"下列各项中不属于深基坑土方开挖方案的是( )。",[586,588,590,592],{"key":20,"text":587,"correct":22},"放坡挖土",{"key":24,"text":589,"correct":22},"中心岛（墩）式挖土",{"key":27,"text":591,"correct":29},"箱式挖土",{"key":31,"text":593,"correct":22},"盆式挖土",{"id":595,"libraryId":5,"type":15,"typeLabel":16,"stem":596,"options":597,"answer":24,"analysis":33},1276594,"下列土的工程分类,除( )之外,均为岩石。",[598,600,602,604],{"key":20,"text":599,"correct":22},"软石",{"key":24,"text":601,"correct":29},"砂砾坚土",{"key":27,"text":603,"correct":22},"坚石",{"key":31,"text":599,"correct":22},{"id":606,"libraryId":5,"type":15,"typeLabel":16,"stem":607,"options":608,"answer":20,"analysis":33},1276595,"下列关于结构施工图基本规定的说法中,错误的是( )。",[609,611,613,615],{"key":20,"text":610,"correct":29},"基础图是建筑物正负零标高以下的结构图,一般包括基础平面图、基础立面图和基础详图",{"key":24,"text":612,"correct":22},"基础图是施工放线、开挖基槽（坑）、基础施工、计算基础工程量的依据",{"key":27,"text":614,"correct":22},"结构平面布置图主要用作预制楼屋盖梁、板安装,现浇楼屋盖现场支模、钢筋绑扎、浇筑混凝土的依据",{"key":31,"text":616,"correct":22},"结构详图主要用作构件制作、安装的依据",[618,621,624,627,630,633],{"id":15,"name":619,"category":7,"favorite":620},"领导干部任职前廉政法规知识测试题",92,{"id":622,"name":623,"category":7,"favorite":15},595,"建筑结构与设备",{"id":625,"name":626,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":628,"name":629,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":631,"name":632,"category":7,"favorite":8},534,"BIM工程师",{"id":634,"name":632,"category":7,"favorite":8},535]