[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1276969":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},1276969,866,3,"判断题","基坑（槽）开挖施工工艺流程:测量放线→切线分层开挖→排水、降水→修坡→留足预留土层→整平。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"",{"id":6,"name":21,"category":22,"favorite":23},"土建方向-通用基础","建筑工程",0]