[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1276861":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1276861,866,2,"多选题","统计推断的工作过程正确的是( )。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","一批产品（检测、数据整理）→样本（随机抽样）→样本质量评价（推断、分析和评价）→总体的质量",false,{"key":16,"text":17,"correct":14},"B","生产过程（随机抽样）→样本（推断、分析和评价）→样本质量评价（检测、数据整理）→总体的质量",{"key":19,"text":20,"correct":21},"C","一批产品（随机抽样）→样本（检测、数据整理）→样本质量评价（推断、分析和评价）→总体的质量",true,{"key":23,"text":24,"correct":14},"D","一批产品（推断、分析和评价）→总体的质量（随机抽样）→样本（检测、数据整理）→样本质量评价",{"key":26,"text":27,"correct":21},"E","生产过程（随机抽样）→样本（检测、数据整理）→样本质量评价（推断、分析和评价）→总体的质量","CE","",{"id":6,"name":31,"category":32,"favorite":33},"土建方向-通用基础","建筑工程",0]