[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-865-8":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":316},{"id":5,"name":6,"category":7,"favorite":8},865,"土建方向-岗位技能","建筑工程",0,8,50,399,[13,28,34,40,46,52,58,64,70,76,82,88,94,100,106,112,118,124,130,136,142,148,154,160,166,172,178,184,190,196,202,208,214,220,226,232,238,244,250,256,262,268,274,280,286,292,298,304,310],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":25,"analysis":27},1276447,3,"判断题","水泥的细度不是选择性指标。",[19,23],{"key":20,"text":21,"correct":22},"A","正确",false,{"key":24,"text":25,"correct":26},"B","错误",true,"",{"id":29,"libraryId":5,"type":15,"typeLabel":16,"stem":30,"options":31,"answer":21,"analysis":27},1276448,"《通用硅酸盐水泥》GB175-2007规定,采用胶砂法可测定水泥的3d和28d的抗压强度和抗折强度。",[32,33],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":25,"analysis":27},1276449,"混凝土的养护是在混凝土浇筑完毕后6h内进行,养护时间一般为14～28d。混凝土浇筑后应对养护的时间进行检查落实。",[38,39],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":41,"libraryId":5,"type":15,"typeLabel":16,"stem":42,"options":43,"answer":21,"analysis":27},1276450,"混凝土分项工程是从水泥、砂、石、水、外加剂、矿物掺合料等原材料进场检验、混凝土配合比设计及称量、拌制、运输、浇筑、养护、试件制作直至混凝土达到预定强度等一系列技术工作和完成实体的总称。",[44,45],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":25,"analysis":27},1276451,"带肋钢筋套筒挤压连接时,钢筋插入套筒内深度应符合设计要求。钢筋端头离套筒长度中心点不宜超过15mm,先挤压一端钢筋,插入接连钢筋后,再挤压另一端套筒,挤压宜从套筒中部开始,依次向两端挤压,挤压机与钢筋轴线保持垂直。",[50,51],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":53,"libraryId":5,"type":15,"typeLabel":16,"stem":54,"options":55,"answer":21,"analysis":27},1276452,"进场的钢筋均应有标牌（标明生产厂、生产日期、钢号、炉罐号、钢筋级别、直径等标记）,应按炉罐号、批次及直径分批验收,分别堆放整齐,严防混料。",[56,57],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":25,"analysis":27},1276453,"混凝土的坍落度对成桩质量有直接影响,甚至会导致堵管事件的发生,混凝土坍落度一般应控制在12～22Cm。",[62,63],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":65,"libraryId":5,"type":15,"typeLabel":16,"stem":66,"options":67,"answer":21,"analysis":27},1276454,"打桩时,对于桩尖进入坚硬土层的端承桩,以控制贯入度为主,桩尖进入持力层深度或桩尖标高为参考。",[68,69],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":21,"analysis":27},1276455,"预制桩定位放线检查复核工作中应对每根桩位复测,桩位的放样允许偏差为群桩20mm,单排桩10mm。",[74,75],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":77,"libraryId":5,"type":15,"typeLabel":16,"stem":78,"options":79,"answer":25,"analysis":27},1276456,"灰土地基分段施工时,不得在墙角、柱基及承重墙下接缝,上下两层的接缝间距不得小于300mm。",[80,81],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":25,"analysis":27},1276457,"石灰应用Ⅲ级以上新鲜的块灰,氧化钙、氧化镁含量越高越好,使用前1～2d消解并过筛,其颗粒不得大于10mm。",[86,87],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":89,"libraryId":5,"type":15,"typeLabel":16,"stem":90,"options":91,"answer":21,"analysis":27},1276458,"土开挖时应遵循“分层开挖,严禁超挖”的原则,检查开挖的顺序,平面位置、水平标高和边坡坡度。",[92,93],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":25,"analysis":27},1276459,"基坑（槽）开挖深度超过6m(含6m)时还应单独制定土方开挖安全专项施工方案。",[98,99],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":101,"libraryId":5,"type":15,"typeLabel":16,"stem":102,"options":103,"answer":21,"analysis":27},1276460,"凡涉及施工作业技术活动基准和依据的技术工作,都应该严格进行专人负责的复核性检查,以避免基准失误给整个工程质量带来难以补救的或全局性的危害。",[104,105],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":21,"analysis":27},1276461,"作业活动的直接负责人（包括技术负责人）,专职质检人员,安全员,与作业活动有关的测量人员、材料员、试验员必须在岗,并须具备相应的执业资格。",[110,111],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":25,"analysis":27},1276462,"施工顺序应符合先地下、后地上,先土建、后设备,先围护,后主体的基本规律。",[116,117],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":21,"analysis":27},1276463,"施工组织设计应符合国家的技术政策,充分考虑承包合同规定的条件、施工现场条件及法规条件的要求,突出“质量第一、安全第一”的原则。",[122,123],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":25,"analysis":27},1276464,"组织模式一般可分为:职能型模式、直线型模式、曲线一职能型模式和矩阵型模式4种模式。",[128,129],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":21,"analysis":27},1276465,"质量控制是质量管理的重要组成部分,其目的是为了使产品、体系或过程的固有特性达到要求,即满足顾客、法律、法规等方面所提出的质量要求（如适用性、安全性等）。所以,质量控制是通过采取一系列的作业技术和活动对各个过程实施控制的。",[134,135],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":137,"libraryId":5,"type":15,"typeLabel":16,"stem":138,"options":139,"answer":21,"analysis":27},1276466,"企业技术标准可以作为施工阶段进行质量控制的依据。",[140,141],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":25,"analysis":27},1276467,"实施工程监理的施工项目,按照我国建设工程监理规范的规定,施工承包单位必须填写《施工组织设计（方案）报审表》并附施工组织设计（方案）,报送设计单位审查。",[146,147],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":149,"libraryId":5,"type":15,"typeLabel":16,"stem":150,"options":151,"answer":25,"analysis":27},1276468,"施工单位的项目施工质量计划或施工组织设计的编制与审批,应根据企业质量管理程序性文件规定的权限和流程进行。通常是由总工室主持编制,报企业组织管理层批准。",[152,153],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":25,"analysis":27},1276469,"有施工的地方必须有技术员或质检人员在场,监理在抽检时技术员必须在场。",[158,159],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":161,"libraryId":5,"type":15,"typeLabel":16,"stem":162,"options":163,"answer":25,"analysis":27},1276470,"难建筑施工质量记录就是从建筑施工企业从签订施工合同开始,一直到完成合同规定施工任务与工程或产品质量相关的记录,但不包括来自分承包方的质量记录。",[164,165],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":21,"analysis":27},1276471,"施工工艺的组织方案主要包括:施工段的划分,施工的起点、流向,流水施工的形式和劳动组织,合理规划施工临时设施,合理布置施工总平面图和个阶段施工平面图等。",[170,171],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":25,"analysis":27},1276472,"规定工程期间交付、竣工交付、工程的收尾、维护、验评、后续工作处理的方案、措施,作为质量的控制方式。",[176,177],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":21,"analysis":27},1276473,"施工项目质量计划应体现施工项目从分项工程、分部工程到单位工程的过程控制,同时也要体现从资源投入到完成工程质量最终检验和试验的全过程控制。",[182,183],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":25,"analysis":27},1276474,"编制质量计划的过程,实际上就是实现质量目标过程的一部分。",[188,189],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":21,"analysis":27},1276475,"通过在质量策划,将质量策划设定的质量目标及其规定的作业过程和相关资源用书面形式表示出来,就是质量计划。",[194,195],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":21,"analysis":27},1276476,"在质量管理中,质量策划的地位低于质量方针的建立,是设定质量目标的前提,高于质量控制和质量保证。",[200,201],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":21,"analysis":27},1276477,"只有做出精确标准的质量计划,才能指导项目的实施、做好质量控制。",[206,207],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":21,"analysis":27},1276478,"有效的决策应建立在数据和信息分析的基础上,数据和信息分析是事实的高度提炼。",[212,213],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":21,"analysis":27},1276479,"1987年,ISO／TC176发布了举世瞩目的ISO9000系列标准,我国于1988年10月发布了GB\u002FT10300系列标准,并“等效采用”。为了更好地与国际接轨,又于1990年10月发布了GB\u002FT19000系列标准并“等效采用ISO9000族标准”。",[218,219],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":221,"libraryId":5,"type":15,"typeLabel":16,"stem":222,"options":223,"answer":21,"analysis":27},1276480,"ISO9000:2000中有术语80个,分成10个方面。",[224,225],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":21,"analysis":27},1276481,"隐蔽工程在隐蔽前要检查合格后验收,涉及结构安全的试块、试件以及有关资料,应按规定进行见证取样检测,涉及结构安全和使用功能的重要分部工程要进行抽样检测。",[230,231],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":233,"libraryId":5,"type":15,"typeLabel":16,"stem":234,"options":235,"answer":21,"analysis":27},1276482,"检验批的质量是分项工程乃至整个工程质量检验的基础,检验批质量合格主要取决于主控项目和一般项目经抽样检验的结果。",[236,237],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":25,"analysis":27},1276483,"工程项目建成后,不可能像某些工业产品那样,再拆卸或解体检查内在的质量,或重新更换零件;即使发现质量有问题,也不可能像T业产品那样实行“包换”或“退款”。而工程项目的终检无法进行工程内在质量的检验,发现隐蔽的质量缺陷。这是指建设工程质量管理中质量隐蔽性的特点。",[242,243],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":21,"analysis":27},1276484,"建筑工程施工是一个十分复杂的形成建筑实体的过程,也是形成最终产品质量的重要阶段,在施工过程中对工程质量的控制是决定最终产品质量的关键,因此,要提高房屋建筑工程项目的质量,就必须狠抓施工阶段的质量管理。",[248,249],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":25,"analysis":27},1276485,"广义的工程质量管理,泛指建设全过程的质量管理。其管理的范围贯穿于工程建设的决策、勘察、设计、施工的全过程。一般意义的质量管理,指的是工程设计阶段的管理。",[254,255],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":25,"analysis":27},1276486,"室内环境质量验收不合格的民用建筑工程,协商后可投入使用。",[260,261],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":21,"analysis":27},1276487,"民用建筑工程及室内装修工程的室内环境质量验收,应在工程完工至少7d以后、工程交付使用前进行。",[266,267],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":25,"analysis":27},1276488,"对有可能影响结构安全的砌体裂缝,应由有资质的检测单位检测鉴定,需返修加固处理的,待返修或加同满足使用要求后就需要再验收了。",[272,273],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":21,"analysis":27},1276489,"对混凝土强度的检验,应以在混凝土浇筑地点制备并与结构实体同条件养护的试件强度为依据。",[278,279],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":21,"analysis":27},1276490,"为避免不必要的重大事故或损失,遇到施工异常情况出现应停止施工,待妥善解决后再恢复施工。",[284,285],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":25,"analysis":27},1276491,"通过返修或加固处理仍不能满足安全使用要求的分部工程、单位（子单位）工程,进行二次验收。",[290,291],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":25,"analysis":27},1276492,"经有资质的检测单位检测鉴定达不到设计要求,但经原设计单位核算认可能够满足结构安全和使用功能的验收批,不予验收。",[296,297],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":25,"analysis":27},1276493,"工单位必须按照工程设计要求、施工技术标准和合同约定,对建筑材料、建筑构配件、设备和商品混凝土进行施检验,检验应当有书面记录和专人签字;未经检验或者检验不合格的,可以使用。",[302,303],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":21,"analysis":27},1276494,"施工单位在工程完工后对工程质量进行了检查,确认工程质量符合有关法律、法规和工程建设强制性标准,符合设计文件及合同要求,并提出工程竣工报告。工程竣工报告应经项目经理和施工单位有关负责人审核签字。",[308,309],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":21,"analysis":27},1276495,"强制性条文的内容,是现行工程建设国家和行业标准中直接涉及人民生命财产安全、人身健康、环境保护和公众利益的条文,同时考虑了提高经济和社会效益等方面的要求。",[314,315],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},[317,321,324,327,330,333],{"id":318,"name":319,"category":7,"favorite":320},1,"领导干部任职前廉政法规知识测试题",92,{"id":322,"name":323,"category":7,"favorite":318},595,"建筑结构与设备",{"id":325,"name":326,"category":7,"favorite":318},715,"招标采购专业知识与法律法规",{"id":328,"name":329,"category":7,"favorite":318},848,"市政方向-通用基础",{"id":331,"name":332,"category":7,"favorite":8},534,"BIM工程师",{"id":334,"name":332,"category":7,"favorite":8},535]